Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic
Jaime Herrera Rodríguez

Jaime Herrera Rodríguez

Metepec,Mexico

Summary

Experienced in Design ( 25 yrs ) , Wiring Harness ( 10 yrs ) , Proactive and goal-driven Design & Release Engineer with a demonstrated history of delivering in Automotive Industry.

Team working and product improvement.

Overview

25
25
years of professional experience
1
1
Certification

Work History

Lead D&R PAT

Ford Motor Company
04.2022 - Current


  • Lead PAT meetings with wiring supplier to follow up Design Changes , 2D release ,DCR´s, Implementation timings for CX727 China MY22-MY23 & CX727N MY23.5-MY25
  • Lead TDR MY23.5 PEC ,MY24 PEC ,MY25 PEC , VRQA for MY23.5 & MY25.
  • Lesson Learned reviews with D&R team & supplier team
  • Lead VDDR MY22 CX727C , MY25 CX727N
  • Conduct SCAFF External & DFMEA reviews with Wiring Supplier on site for MY25
  • Give support for evaluation of RQT´s, DR´s , REG on FEDE for MY25 PEC
  • Support Pre-Production Build at Assembly plant ( CSAP ) MY23.5 - MY25 , DCV Build at NMPDC MY25
  • Lead TO4 meetings to release new components in MY25
  • Coordination with suppliers to ensure timely delivery of materials, to support Build events or run a DVP test ( Cycling , Vibration )
  • Support for 2 pgr approval in CPDEF meeting for each Concern raised
  • Support for Alert approval with NM team as a pull ahead or any rework required for Build events
  • Support for Concern Approval in Change Control Meeting
  • Give support for Solution designs for the AIMS for pre-production builds ( DCV , TT , PP,MP1 )
  • Raise GPIRS order to request prototype parts for DVP test
  • PDL Analysis to check impacts in wiring harnesses ( Complexity changes )

EDS D&R LV Wiring

Ford Motor Company
02.2021 - 04.2022

EDS D&R CX430 Bronco Sport


  • EDS D&R for IP , Console harness family for MY21-MY23.5
  • EDS D&R for Body harness family MY22.5-MY25
  • Lead TDR for MY25 UNV1/UPV1 with D&R team
  • Work with 3D Engineering team for design solutions on future Model years based on new electrical content , new hardware , new modules & new packaging (DPA´s).
  • Create , fill out & present for approval Concerns in WERS
  • Support Pre-Production Builds at Assembly plant ( HSAP ) MY22 - M23.5
  • Give support for design Solutions for raised AIMS & for Manufacturing request.
  • DCR creation , ReDV fill out Information (technical evidence to support every design change) for DCCS
  • 2D Drawing request & verify DCR Information Implemented based on ReDV & 2D Checklist audit
  • PDL Analysis to check impacts in wiring harnesses ( Complexity changes )
  • FEDEBOM release for new part numbers
  • BOM Validation for Pre_Production Builds ( TT,PP,MP1)
  • Develop TVM actions for reduction cost targets

EDS D&R LV Wiring

Ford Motor Company
01.2019 - 02.2021

EDS D&R CD539 / U540C Edge/Nautilus


  • EDS D&R for IP , Console,Headliner,Doors harness family for MY19-MY21.5
  • Work with 3D Engineering team for design solutions on future Model years based on new electrical content , new hardware , new modules & new packaging (DPA´s).
  • Create , fill out & present for approval Concerns in WERS
  • Support Pre-Production Builds at Assembly plant ( Oakville ) for MY19 - MY21.5
  • Support DCV Build at Pilot Assembly plant (Chongqing) for MY21 U540C
  • Manufacturing Checklist review on site for Wiring harness supplier for U540C
  • Give support for Solution designs for the AIMS report open at Assembly plant during pre-production builds ( VP , TT , PP ) & AIMS for Manufacturing request.
  • DCR creation , ReDV fill out Information (technical evidence to support every design change) for DCCS
  • 2D Drawing request & verify DCR Information Implemented based on ReDV & 2D Checklist audit
  • PDL Analysis to check impacts in wiring harnesses ( Complexity changes )
  • BOM Validation for Pre_Production Builds ( TT,PP,MP1)
  • Develop TVM actions for reduction cost targets

EDS D&R LV Wiring

Ford Motor Company
06.2018 - 01.2019

EDS D&R CD4.1 Fusion

EDS D&R for Console, IP harness family for MY18-MY20


  • Work with 3D Engineering team for design solutions on future Model years based on new electrical content , new hardware , new modules & new packaging (DPA´s).
  • Create , fill out & present for approval Concerns in WERS
  • Support Pre-Production Builds at Assembly plant ( HSAP) for MY19
  • DCR creation , ReDV fill out Information (technical evidence to support every design change) for DCCS
  • 2D Drawing request & verify DCR Information Implemented based on ReDV & 2D Checklist audit
  • PDL Analysis to check impacts in wiring harnesses ( Complexity changes )
  • BOM Validation for Pre_Production Builds ( TT,PP,MP1)

Wiring Harness DRE

General Motors De Mexico
03.2014 - 06.2018

31XXN Chevrolet Colorado

Wiring DRE for IP , Engine & Body harness Family MY15-MY20


  • Give support for design Solutions for the PRTS open at Assembly plant during pre-production builds ( IVER , PPV , Non Salable & Salable ) ( Wentzville ,Mo )
  • 3D Design routing & Release for wiring harness in Unigraphics NX
  • Math data Release design solutions on TCe (Team Center)
  • Create CR ( Change Request ) to Implement changes in 2D print with Wiring Supplier
  • Create , fill out & present for approval EWO (Engineering Work orders) for design Changes
  • Work for manufacturing improvements & Savings for the harness.
  • Coordinate ETO ( Engineering Try Outs ) for Design Solution
  • Analyze & Release RPO matrix and Wiring releases options based on PPC ( Vehicle Content )
  • Attend Design review meetings , WHA , lesson Learn reviews.

Project & Manufacturing Supervisor

Diseño Y Desarrollo Industrial Herro Sa De CV
04.2007 - 03.2014
  • Develop & Implementation of Automation projects for automotive clients ( Magna ,Bestop,
    Valeo , Autoliv )
  • Conduct Technical visits on Manufacturing plants to check Customer´s requirements
  • Develop Design solutions for assembly work stations, Checking fixtures , poka yoke electrical features &
    mechanical fixtures ( all controlled by PLC programming by Device net , Ethernet protocols).
  • Design 3D Modelling on AutoCAD, Mechanical desktop, Inventor, Solid works.
  • Coordinate Work load for Mechanical Tool Shop & Electrical team

Electrical Project Engineer

Acco Mexicana Sa De CV
09.1999 - 04.2007
  • Lead Project Engineer for Implementing new production lines
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • In charge of Process Improvements for Vinyl Binder production lines.
  • Convert machines from old Electrical control and boards to PLC (Allen Bradley, Siemens).
  • Implement new devices control like servo motors & drive speed control motors.

Education

MBA - Master Bussiness Administration

Universidad Del Valle De Mexico ( UVM )
Mexico
08.2026

Bachelor of Science - Electric & Mechanical Engineer

Instituto Tecnologico De Toluca
Toluca
07.1998

Skills

  • Design solution problems
  • Under Pressure Working
  • Take decisions
  • Respect
  • Technical Knowledge
  • Initiative
  • Service
  • Work Team

Certification

  • Certified Black belt Six Sigma, General Motors - 2013
  • Certified Medium level Unigraphics NX

Languages

English
Professional Working

Timeline

Lead D&R PAT

Ford Motor Company
04.2022 - Current

EDS D&R LV Wiring

Ford Motor Company
02.2021 - 04.2022

EDS D&R LV Wiring

Ford Motor Company
01.2019 - 02.2021

EDS D&R LV Wiring

Ford Motor Company
06.2018 - 01.2019

Wiring Harness DRE

General Motors De Mexico
03.2014 - 06.2018

Project & Manufacturing Supervisor

Diseño Y Desarrollo Industrial Herro Sa De CV
04.2007 - 03.2014

Electrical Project Engineer

Acco Mexicana Sa De CV
09.1999 - 04.2007

MBA - Master Bussiness Administration

Universidad Del Valle De Mexico ( UVM )

Bachelor of Science - Electric & Mechanical Engineer

Instituto Tecnologico De Toluca
Jaime Herrera Rodríguez