Summary
Overview
Work History
Education
Skills
Languages
References
Timeline
Generic

Jaime Torres

St. George,UT

Summary

Professional Framerwith exceptional mechanical and communication skills. Bringing reliable work history and possessing a meticulous record of good attendance. Knowledgeable about the functions of power tools and equipment.

Overview

2
2
Languages
15
15
years of professional experience

Work History

Framer

AFT Construction
St. George
04.2024 - Current
  • Framed walls, floors, and roofs for AFT Construction projects.
  • Read blueprints and layout plans for accurate framing work.
  • Measured lumber and marked cuts for framing assemblies.
  • Assembled wall sections, joists, and trusses using hand and power tools.
  • Checked frame alignment, level, and square during installation.
  • Secured framing members with nails, screws, and fasteners.
  • Collaborated with teammates and supervisors to clarify project requirements, ensuring timely completion.
  • Measured and cut lumber to specified dimensions using a hand saw, power miter saw, or radial arm saw.
  • Followed safety procedures and maintained clean jobsite conditions.
  • Sorted and arranged materials at job sites to promote a safe and efficient working environment. at job sites in order to maintain a safe environment free from clutter.
  • Analyzed construction plans to proactively identify and address potential structural issues.

Framer

Tko Construction
St. George, UT
05.2012 - 11.2016
  • Framed walls, floors, and roofs for AFT Construction projects.
  • Read blueprints and layout plans for accurate framing work.
  • Measured lumber and marked cuts for framing assemblies.

Stucco Laborer

Sierra Vista
St. George, UT
02.2014 - 02.2015
  • Inspected wall surfaces before applying stucco and finish coats.
  • Monitored mix preparation, material handling, and application methods.
  • Applied decorative or textured finishes or coverings to designated surfaces.
  • Mixed mortar by operating mixing drills and tools.
  • Mixed substances or compounds needed for each task.
  • Prepared materials and work area according to design and specification documents.
  • Used hammers and masonry saws to construct, repair and demolish concrete walls and bases.
  • Protected structures or surfaces near work areas to avoid damage or excess debris.
  • Loaded and unloaded materials by lifting, pushing, and pulling heavy material loads.
  • Resolved any issues or problems that arose during the course of a project.
  • Inspected and machines to verify conformance to product specifications.

Education

Millcreek High School
St. George, Utah

Skills

  • Blueprint reading
  • Framing layout
  • Lumber measurement
  • Roof framing
  • Truss installation
  • Material logistics
  • Site preparation
  • Tool operation
  • Problem solving
  • Team collaboration
  • Clear communication
  • Time management
  • Lumber preparation
  • Repairing
  • Power tools operation
  • OSHA compliance

Languages

English
Professional
Spanish
Professional

Timeline

Framer

AFT Construction
04.2024 - Current

Stucco Laborer

Sierra Vista
02.2014 - 02.2015

Framer

Tko Construction
05.2012 - 11.2016

Millcreek High School
Jaime Torres