Professional Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline

Jair Sauceda

Bechtel // Local Union 03
Spring,TX
2
Languages
1
Certification
6
years of professional experience

Results-driven Survey General Foreman with proven expertise in coordinating construction job sites and fostering collaboration among teams. Skilled in interpreting blueprints and executing civil, structural, and mechanical tasks. Committed to meeting project schedules and milestones while delivering high-quality outcomes.

Work History

Survey Chief of Parties // General Foreman

1 Year 4 Months
Bechtel // Local Union 03 | 04.2025 - Current
  • Managed field surveying activities, coordinating with engineering teams to support project milestones at Lithium Americas Thacker Pass.
  • Oversaw a team of expert surveyors to ensure precision and accuracy in survey results.
  • Collaborated with subcontractors for seamless coordination of work scopes, ensuring smooth project execution from start to finish.
  • Conducted quality control checks on survey data, ensuring compliance with project standards.
  • Developed strong relationships with clients through effective communication skills and professional demeanor.
  • Oversaw coordination of survey operations, ensuring alignment with client schedules and requirements.
  • Supported Piping, Electric, Concrete, Dirt-work, Mechanical, and structural.
  • Used Trimble Scanning, Total station, and GPS equipment in daily operations.
  • Cultivated relationships with superintendents and project management teams to ensure high-quality project delivery.
  • Coordinated several crews and managed all work fronts during high-pressure situations; attended client, contractor meetings for the scheduling and 3-week look ahead planning of the job site.
  • Dedicated extensive hours to ensure successful project completion.

Survey Party Chief

7 Months
Bechtel Energy | 09.2024 - 04.2025
  • Contributed to Port Arthur LNG project for effective project delivery.
  • Analyzed GPS data to enhance the creation of intricate as-built maps and drawings for project documentation.
  • Designed layout and executed data collection for underground utilities in marine and civil projects.
  • Coordinated surveyor activities to achieve task completion ahead of established deadlines.
  • Supported all aspects of construction, maintaining close communication with management, and engineering.

Survey Party Chief

4 Months
Baker Gulf Coast Industrial | 05.2024 - 09.2024
  • Contributed to development of Plaquemines LNG Project by collaborating with project teams.
  • Created detailed job site configurations on data collectors using Trimble, incorporating points and linework extracted from raw field data for enhanced project accuracy.
  • Executed field calculations for assessments and communicated discrepancies to survey manager, ensuring project alignment with specifications.
  • Performed field calculations to complete assessments and report possible discrepancies to survey manager
  • Responded effectively to evolving job site circumstances, ensuring project goals remained on track through strategic plan modifications.
  • Self-motivated, with a strong sense of personal responsibility.

Survey Party Chief

3 Months
Performance Industrial | 02.2024 - 05.2024
  • Contributed to Air Products LNG project in Casa Grande, Arizona
  • Developed comprehensive layouts and elevation plans for various foundation types, machinery installations, and underground utility systems.
  • Established control and benchmarks for all of jobsite to follow
  • Implemented control measures and established benchmarks for adherence across jobsite operations.
  • Engaged with all departments to ensure survey requirements were met for each craft involved
  • Adapted to changing circumstances, maintaining productivity and effectiveness in high-pressure situations.
  • Operated Trimble Access software to manage survey data

Field Surveyor

10 Months
Spawglass Construction | 03.2023 - 01.2024
  • Coordinated several projects in Texas and arranged work schedules to meet the needs of superintendents and project managers.
  • Achieved successful completion of city-funded projects, including Brays Bayou Trail, Coffee Pot demolition in downtown Houston, San Antonio Airport taxiway upgrades, IAH Airport fire station development, and Brazoria County Court construction.
  • Worked on City Funded projects such as Brays Bayou Trail, Coffee pot demolition In downtown Houston, San antonio Airport Taxiways, IAH airport Fire station construction, and Brazoria county Court Construction.
  • Worked and maintained several projects all across Texas at the same time and scheduled work according to demands of each superintendent on site as well as project managers demands to satisfy the client.

Field Surveyor

2 Years 1 Month
Baker Concrete Construction | 02.2021 - 03.2023
  • Dedicated long hours to ensure project completion and team support.
  • Collaborated with survey companies and subcontractors to establish accurate line and grade parameters at job sites.
  • Designed and specified layout for columns, grade beams, foundations, and anchor bolts/embeds.
  • Supported engineering efforts to enhance concrete solutions for large-scale pours.
  • Communicated closely with contractors to meet their demands and to fit to their schedule.
  • Directed construction and planning phases for San Angelo Shannon Medical Center and UT Health Science Center in San Antonio, enhancing patient care environments.

Scaffold Builder

10 Months
Axios Industrial Maintenance | 04.2020 - 02.2021
  • Erected and maintained scaffolding platforms, providing secure access for electricians and welders during operations at refinery locations.
  • Worked cohesively with colleagues to assemble scaffolds in compliance with safety standards.
  • Constructed and assembled scaffolding structures according to project specifications and safety regulations.
  • Inspected materials and equipment for quality assurance, ensuring compliance with industry standards.
  • Collaborated with team members to execute complex scaffold setups in various environments.

Education

High School Diploma

Magnolia West High School | Magnolia | 05.2020

Skills

Field surveying
Quality Control
Blueprint analysis
Site coordination
Supervisory experience
Data analysis
Supervisor Experience.
Leading teams
Creative solutions
Working under pressure
Innovative problem-solving

Certification

  • OSHA 10
  • OSHA 30
  • BASIC PLUS
  • TWIC

Languages

English
Native or Bilingual
Spanish
Native or Bilingual

Timeline

Survey Chief of Parties // General Foreman

Bechtel // Local Union 03
04.2025 - CurrentRead More

Survey Party Chief

Bechtel Energy
09.2024 - 04.2025Read More

Survey Party Chief

Baker Gulf Coast Industrial
05.2024 - 09.2024Read More

Survey Party Chief

Performance Industrial
02.2024 - 05.2024Read More

Field Surveyor

Spawglass Construction
03.2023 - 01.2024Read More

Field Surveyor

Baker Concrete Construction
02.2021 - 03.2023Read More

Scaffold Builder

Axios Industrial Maintenance
04.2020 - 02.2021Read More

Magnolia West High School

High School Diploma
Read More
Jair Sauceda