Overview
Work History
Timeline
Generic

Jake Trew

Sacramento,CA

Overview

7
7
years of professional experience

Work History

Tile Finisher

National Ceramic Tile And Stone
05.2022 - 12.2022
  • Used power wet saws and tile cutters to cut tiles to specifications for projects.
  • Prepared for new installations and repair work by removing original materials and debris.
  • Operated machines to mix mortar, thinset and grout according to standard formulas.
  • Completed accurate, well-aligned and straight work according to job specifications.
  • Achieved smooth surfaces with correct cuts and skills in polishing materials.
  • Placed marble and tiles into place using spacers to achieve proper spacing for grout application.
  • Leveled surfaces using plywood and mortar prior to laying marble and tile.
  • Used safe lifting, equipment and behavioral practices.
  • Leveraged power saws or tile cutters to cut materials to specified sizes for installation.
  • Applied protective materials to reduce damage, dust and debris.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-day-day duties accurately and efficiently.

Laborer

West Coast Concrete Services
03.2017 - 05.2018
  • Set wood and other forming materials to prepare for concrete pours.
  • Leveled, smoothed and finished surfaces of poured concrete for construction projects.
  • Measured precise amounts of concrete and verified levelness to improve quality of finished product.
  • Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
  • Mixed, spread and patched concrete to specifications.
  • Routinely lifted and moved items weighing up to Number pounds.
  • Demolished and repaired old concrete surfaces.
  • Operated Tool to Action.
  • Maintained clean, safe worksite for team safety and to help keep projects on-track.
  • Shoveled materials such as dirt, gravel and asphalt.
  • Wore correct clothing and protective equipment for jobs.
  • Completed physically demanding tasks such as lifting up to Number pounds to move job materials.
  • Monitored inventory of key tools and materials used at each project site to provide consistent availability.
  • Utilized Type of Equipment while observing manufacturer's safety procedures and corporate standards.

Tile Setter Helper

Bauchman Tile
01.2016 - 01.2017
  • Readied surfaces for smooth installations by removing damaged materials and correcting minor imperfections.
  • Assisted with installation, repair and rebuilding of Type structures working in collaboration with Job title.
  • Helped Job title complete skilled work by coordinating needed supplies and equipment based on specific job requirements.
  • Finalized installations with sealing agents and smooth lines of caulk.

Timeline

Tile Finisher

National Ceramic Tile And Stone
05.2022 - 12.2022

Laborer

West Coast Concrete Services
03.2017 - 05.2018

Tile Setter Helper

Bauchman Tile
01.2016 - 01.2017
Jake Trew