Work History

Forman

Hayes Mechanical
05.2023 - 04.2024
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.

Pipe Foreman

Gawco Specialty Service
09.2022 - 10.2023
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.

Class A Piprfitter / Pipe Forman

Performance Contractors
07.1995 - 08.2023
  • Ensured accurate documentation of all completed work, including detailed records of materials used, labor hours logged, and any changes made during the course of the project.
  • Enhanced project efficiency by implementing effective pipe installation and repair strategies.

General Forman

Mack Energy
07.2021 - 08.2022
  • Worked alongside team to accomplish work goals according to schedule.
  • Performed job safety analysis on daily basis to mitigate risks for all workers and visitors to job sites.
  • Completed final walkthroughs at job sites to close out projects.
  • Achieved timely completion of projects with strict adherence to budget constraints and quality standards.

Pipefitter Leadman

Systems Contracting
03.2011 - 05.2021
  • Optimized resource allocation through effective material requisition planning based on upcoming project needs.
  • Contributed to construction efficiency by expertly interpreting blueprints, schematics, and technical specifications related to pipefitting assignments.

Pipe Forman

Casey Industrial, Inc
05.2019 - 11.2020
  • Demonstrated exceptional problem-solving abilities by assessing potential challenges during the planning stage and proactively implementing solutions to address them before they impacted project timelines or costs.
  • Assembled and secured ,fittings and related equipment according to project specifications.

Pipe Forman

Kee Specialty Services
05.2019 - 11.2020
  • Improved project efficiency by consistently meeting deadlines through effective resource allocation and task delegation.
  • Ensured accurate documentation was maintained at all times relating to project progress reports, change orders, inspection records as well as other relevant data.

Pipe Forman

Beacon Construction
08.1997 - 10.1999
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Utilized [Type] equipment to excavate, install and backfill drainage pipes.
  • Fostered a positive work environment by promoting teamwork, recognizing achievements, and addressing conflicts in a timely manner.
  • Oversaw all aspects of pipe fabrication from material selection to final assembly while maintaining strict adherence to industry guidelines and client specifications.
  • Enhanced safety standards on job sites by conducting regular inspections, enforcing protocols, and providing ongoing training for crew members.
  • Ensured accurate documentation was maintained at all times relating to project progress reports, change orders, inspection records as well as other relevant data.

Class A Pipefitter

Conti
08.2024 - Current

Timeline

Class A Pipefitter

Conti
08.2024 - Current

Forman

Hayes Mechanical
05.2023 - 04.2024

Pipe Foreman

Gawco Specialty Service
09.2022 - 10.2023

General Forman

Mack Energy
07.2021 - 08.2022

Pipe Forman

Casey Industrial, Inc
05.2019 - 11.2020

Pipe Forman

Kee Specialty Services
05.2019 - 11.2020

Pipefitter Leadman

Systems Contracting
03.2011 - 05.2021

Pipe Forman

Beacon Construction
08.1997 - 10.1999

Class A Piprfitter / Pipe Forman

Performance Contractors
07.1995 - 08.2023