Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

James Bunch

Haltom City

Summary

Dynamic professional with extensive experience as a General Contractor at Northridge Construction, known for delivering high-quality projects on time and within budget. Skilled in project management and regulatory compliance, adept at interpreting blueprints and fostering team collaboration to enhance workflow efficiency and client satisfaction.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Plumber

Alans Services
01.2025 - Current
  • Repaired plumbing systems, components, and equipment.
  • Installed valves, hangers, supports, and flanges inside piping systems.
  • Installed new piping systems in various types of buildings following local building codes and regulations.
  • Performed regular maintenance on plumbing systems to prevent costly future repairs for customers.
  • Selected type and size of piping required for each project.
  • Upgraded outdated plumbing systems to modern standards enhancing functionality while increasing property value for clients.

Ironworker Foreman

DTC Contracting
02.2023 - 01.2025
  • Delivered projects on time and within budget by closely monitoring progress and adjusting plans as needed.
  • Examined architectural drawings and building blueprints to determine reinforcement requirements.
  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space, and hazardous material handling.
  • Installed steel cables to reinforce structures before tightening and reinforcing.
  • Determined size, shape, placement, and material of supports based on blueprints and structural standards.
  • Elevated team morale by fostering a positive work environment focused on collaboration, open communication, and mutual respect.

Sign Installer

Signs Manufacturing
03.2020 - 02.2023
  • Improved client satisfaction by efficiently installing and maintaining high-quality signage for various businesses.
  • Evaluated job sites before beginning work, identifying potential hazards or obstructions that could impact the installation process.
  • Effectively managed multiple concurrent assignments while maintaining a high level of attention to detail and adherence to quality standards.
  • Optimized workflow efficiency by troubleshooting issues and implementing corrective actions in the installation process.

General Contractor

Northridge Construction
03.2020 - 09.2022
  • Hired and oversaw subcontractors to meet project needs.
  • Established a reputation for delivering high-quality work consistently meeting or exceeding client expectations.
  • Managed multiple simultaneous projects, ensuring timely completion without sacrificing quality or exceeding budgets.
  • Completed projects on time and within budget through meticulous scheduling and coordination of resources.
  • Managed large-scale construction projects within cost, quality and time constraints,

Electrician

Ridgeline Eclectic
08.2016 - 03.2020
  • Worked from ladders, scaffolds and lifts to install, maintain, or repair electrical wiring equipment and lighting fixtures in ceilings, on roofs and on towers.
  • Installed and wired electrical transformers, service panels, and circuit breakers.
  • Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
  • Improved electrical system safety by conducting thorough inspections and identifying potential hazards.
  • Maintained compliance with local codes and regulations by staying up-to-date on industry standards and best practices.

Education

High School Diploma -

Timber Creek High School
Keller, TX

Skills

  • System maintenance
  • Regulatory compliance
  • Blueprint interpretation
  • Equipment troubleshooting
  • Project management
  • Time management
  • Team collaboration
  • Safety protocols
  • Problem solving
  • Conflict resolution
  • Hand and power tools
  • Equipment operation
  • Blueprint reading

Certification

OSHA 30 Construction Saftey And Health

Timeline

Plumber

Alans Services
01.2025 - Current

Ironworker Foreman

DTC Contracting
02.2023 - 01.2025

Sign Installer

Signs Manufacturing
03.2020 - 02.2023

General Contractor

Northridge Construction
03.2020 - 09.2022

Electrician

Ridgeline Eclectic
08.2016 - 03.2020

High School Diploma -

Timber Creek High School
James Bunch