Summary
Overview
Work History
Education
Skills
Timeline
Generic

James crawford

Greenville,New Hampshire

Summary

Dynamic professional with a strong background in project coordination and problem-solving, honed in the Robotics Club. Proven ability to deliver precise installations and foster collaborative teamwork. Proficient in 3D printing technologies, I excel in strategic project planning, ensuring high-quality results that enhance customer satisfaction.

Overview

8
8
years of professional experience

Work History

Cook

Pickity Place
06.2018 - Current
  • Maintained clean and organized work areas at all times to bring safety and quality to food preparation process.
  • Maintained a clean and sanitary workspace, ensuring compliance with health and safety regulations.
  • Prepared meals efficiently under time constraints for timely service during peak hours.
  • Demonstrated strong multitasking skills, managing multiple orders simultaneously without sacrificing quality or presentation.
  • Checked for quality, kept track of old and new items and rotated stock to confirm freshness of food and ingredients.
  • Created identical dishes numerous times daily with consistent care, attention to detail, and quality.

Siding Installer

Paramount Contracting LLC
08.2022 - 06.2023
  • Improved siding installation quality by carefully measuring, cutting, and fitting materials to match specific project needs.
  • Utilized advanced tools and equipment to ensure precision cuts and alignments during installation projects.
  • Skillfully repaired damaged or worn siding panels, restoring the appearance and functionality of building exteriors.
  • Developed strong professional relationships with colleagues and clients through reliable performance and consistent communication.
  • Achieved seamless transitions between various siding materials for aesthetically pleasing results.
  • Increased customer satisfaction with precise installations that met or exceeded industry standards.

Team Leader

Robotics Club
09.2017 - 04.2022
  • Set performance expectations for the team, monitoring progress towards goals and providing constructive feedback as needed.
  • Empowered team members by delegating responsibilities according to individual strengths and areas of expertise.
  • Managed conflict resolution among team members, fostering a positive and collaborative work environment.
  • Maintained an inclusive and diverse team culture, promoting respect and understanding among all members.
  • Coordinated resources effectively to meet project deadlines and achieve desired results.

Education

No Degree - Mechanical Engineering

University of New Hampshire
NH
04-2028

General Studies

Mascenic Regional High School
New Ipswich, NH
04-2022

Skills

  • Proficient in 3D printing technologies
  • Computer-aided design expertise
  • Strategic project planning
  • Problem-solving skills
  • Project coordination
  • Electrical systems
  • Collaborative teamwork
  • Circuit design
  • 2D and 3D design
  • Effective multitasking

Timeline

Siding Installer

Paramount Contracting LLC
08.2022 - 06.2023

Cook

Pickity Place
06.2018 - Current

Team Leader

Robotics Club
09.2017 - 04.2022

No Degree - Mechanical Engineering

University of New Hampshire

General Studies

Mascenic Regional High School