Responsible Foreman with excellent project oversight, team management and blueprint interpretation skills coupled with more than 2 years of experience. Achieves project milestones and adheres to deadlines and quality standards.
Overview
7
7
years of professional experience
1
1
Certification
Work History
Forman
Three Peaks Drilling
02.2021 - Current
Inspected completed work to verify quality standards and compliance with criteria.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.
Checked equipment to determine if maintenance was required.
Reviewed project details to specify correct materials and equipment for job sites.
Interacted with employees to demonstrate high standards and mitigate issues effectively.
Established clear priorities and production quality standards.
Verified completed projects met approved time, quality, and cost estimates.
Monitored usage of supplies and materials to establish cost effective operations.
Scheduled job assignments for staff to monitor progress and performance.
Evaluated incoming materials for quality and amounts ordered.
Addressed issues with employees and customers to manage healthy conflict resolutions.
Developed and implemented new procedures to increase productivity and constructiveness.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Trained workers in proper methods, equipment operation and safety procedures.
Assisted in recruiting and hiring new construction and extraction workers.
Pipe Layer
TLC Plumbing & Heating, TLC
03.2016 - 02.2021
Assembled and installed underground pipe, fittings and valves of various sizes.
Handled all repairs for sanitary and storm water sewer structures and pipe systems.
Used hand signals to direct equipment operators and alert to hazards.
Observed all safety measures and company equipment policies to prevent job site accidents.
Checked and tested underground gas lines and pipes to verify proper functionality.
Used equipment such as rollers, dump trucks and front-end loaders to move important supplies.
Read and understood drawings, written instructions and blueprints to plan work and layout pipe.
Graded or leveled trench bases using tamping machines or hand tools.
Covered completed pipes with earth or materials and prepared sites for grading.
Followed plans to locate existing utilities prior to digging and flagged locations for operators.
Reviewed schematics and measured pipes to make accurate cuts.
Installed new hydrants, valves and lines to meet fire department needs and protect residents.
Located existing pipes needing repair or replacement using magnetic or radio indicators.
Checked slopes for conformance to requirements using levels or lasers.
Accessed existing pipes, repaired issues and put in new components for sewer, water and gas systems.
Skilled at working independently and collaboratively in a team environment.
Self-motivated, with a strong sense of personal responsibility.
Proven ability to learn quickly and adapt to new situations.
Worked well in a team setting, providing support and guidance.