Warehouse Lead with proven experience in large production environments.
Close and lockout DC power
Verify on right reactor lockout proper valves using lock tag and
try then perform x test also perform venting.
Using harvesting RRDs by picking them up by 20 ton
crane and taking them to staging area
cleaning the reactor bell by putting it on the bell cleaner
also cleaning the base plant by hand
putting an aligning the seed rods on the base plate
putting the bell back on the base plate and unlocking the
power