Summary
Overview
Work History
Education
Skills
Affiliations
Timeline
Generic

James Johnson

Rome,NY

Summary

Resourceful Foreman known for high productivity and efficient task completion. Possess specialized skills in project management, team leadership, and safety compliance, ensuring projects meet quality standards on time. Excel in communication, problem-solving, and adaptability, leveraging these soft skills to lead teams effectively and overcome challenges in fast-paced environments.

Reliable Foreman with several years of construction site experience. Superb project oversight, team management and blueprint interpretation skills. Bilingual and successful in meeting tight job deadlines.

Flexible hard worker and self motivate, ready to learn and contribute to team success. Detailed focused Foreman skilled in planning, assigning and directing work tasks. Team-oriented professional with strong commitment to maintaining safe, clean job sites. Dedicated to quality and clear communication. Experienced in fast-paced environments and adaptable to last-minute changes. Thrives under pressure and consistently earns high marks for work quality and speed.

Adaptable professional with a quick-learning ability and a talent for adjusting to new environments. Skilled in rapidly acquiring new knowledge and applying it effectively. Driven by a passion for continuous learning and successfully navigating change.

Overview

10
10
years of professional experience

Work History

Foreman

Pezzlonella Construction
Utica, NY
03.2017 - 04.2020
  • Monitored compliance with local building codes and regulations.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Assessed work area conditions for potential hazards or risks.
  • Managed inventory levels of supplies necessary for job completion.
  • Inspected finished installations for conformance with specifications.
  • Aligned tiles and ceiling grid using spacers.
  • Used hand tools such as trowels, broad knives or spatulas to apply sealing compound to holes and cracks.
  • Demonstrated efficiency and dedication to quality by contributing to successfully completed jobs.
  • Measured and marks cutting lines on drywall for lengths, heights and penetrations.
  • Ensured that all jobs were completed within specified timeframes.
  • Completed drywall finish work with exceptional quality and efficiency.
  • Installed metal frames and hangers for suspended ceilings.
  • Demonstrated excellent attendance and punctuality.
  • Followed safety protocols at all times while performing duties onsite or offsite.
  • Repaired old acoustical ceiling systems as needed.
  • Attached materials to framework using hardware or adhesives.
  • Checked blueprints and plans to determine the type, quantity, and placement of materials needed for installation.
  • Completed routine maintenance and repair.
  • Utilized advanced technical skills and expertise to troubleshoot complex problems and implement solutions.
  • Managed time effectively to ensure tasks were completed on schedule and deadlines were met.
  • Worked effectively in team environments to make the workplace more productive.
  • Demonstrated strong problem-solving skills, resolving issues efficiently and effectively.
  • Completed day-to-day duties accurately and efficiently.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
  • Prioritized and organized tasks to efficiently accomplish service goals.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.
  • Worked with cross-functional teams to achieve goals.
  • Operated a variety of machinery and tools safely and efficiently.

Foreman

Ryan llc
, MD
03.2015 - 02.2017
  • Maintained a clean work environment at all times while working onsite.
  • Ordered additional supplies when needed in order to complete projects in a timely manner.
  • Calculated amounts of materials needed for each job.
  • Filled cracks, holes or joints using caulking guns or putty knives.
  • Prepared sheetrock, metal and wood surfaces for painting.
  • Calculated amounts of materials and estimated cost based on surface measurements or work orders.
  • Spread undercoats and finish materials using rollers and spray equipment.
  • Instructed laborers on proper safety procedures when using hazardous materials or working in confined spaces.
  • Selected, mixed and applied surface coatings to match and restore interior or exterior surfaces.
  • Performed repairs to defects in walls by patching holes and scrapes prior at project start.
  • Coordinated with other contractors when necessary in order to complete projects efficiently.
  • Applied paints, sealers and solvents to plaster, sheetrock, concrete and wood.
  • Provided accurate estimates of labor costs, timeframes, and material requirements for projects.
  • Covered floors before prepping, priming and painting walls and ceilings to protect them from chemicals and paint.
  • Used power and hand tools safely and effectively.
  • Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
  • Applied primers and sealers to protect the surface from moisture damage.
  • Completed high-volume weekly painting jobs with consistently positive customer feedback.
  • Performed series of surface preparation techniques to maximize paint durability.
  • Developed detailed plans for each project based on customer specifications.
  • Inspected work sites to measure dimensions, lay out work and estimate materials for each job.
  • Mixed mortar, plaster, and grout according to standard formulas.
  • Analyzed blueprints and drawings to determine structural dimensions of framework.
  • Constructed formwork for concrete foundations using timber boards.
  • Maintained a clean workspace by disposing off any waste material properly after completing tasks.
  • Connected headers over windows and doorways in order to provide support for the structure's load bearing capacity.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Verified trueness of construction using plumb and level.
  • Completed tear-down of existing construction to prepare for new construction.
  • Laid out floor joists in accordance with approved plans.
  • Selected tools, equipment and materials from storage to transport to work site.
  • Reviewed and interpreted project specifications, determining tools and equipment needed.
  • Examined construction plans to identify potential structural problems.

Foreman

Magnum Construction Corp. Michael Camarda
Utica, NY
08.2012 - 01.2015
  • Delegated duties to employees based on skillset.
  • Viewed and checked job equipment to determine maintenance requirements.
  • Planned and managed manpower and resource requirements to support project activities.
  • Ensured all workers adhered to company policies and procedures.
  • Managed workers at various experience levels in construction and restoration projects.
  • Delegated work to staff, setting priorities and goals.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Supervised activities of personnel assigned to various tasks during construction jobs.
  • Reported project progress, site problems and labor status to supervisors.
  • Kept production team moving forward for progress in daily site operations.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Provided guidance, direction, and technical assistance to crew members.
  • Operated equipment and machinery according to safety guidelines.

General Foreman

Montana Construction
Oneida County, NY
03.2010 - 07.2012
  • Monitored project progress to ensure efficient use of resources and timely completion of tasks.
  • Directed the activities of subcontractors to ensure quality workmanship and adherence to contract specifications.
  • Communicated regularly with team members about changes in scope or schedule.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Delegated duties to employees based on skillset.

Education

Bachelor of Arts - General Studies

Tompkins Cortland Community College
Cortland, NY
08-2005

Skills

  • Project estimation and bidding
  • Fall protection
  • Operations supervision
  • Construction operation support
  • Wood and metal framing
  • Drywall installation
  • Drywalling
  • Construction procedures
  • Multitasking and organization
  • Blueprint interpretation
  • Timesheet review
  • Crew leadership
  • Workplace safety
  • Heavy lifting
  • Cost estimation
  • Project planning
  • Quality control
  • Job site safety
  • Teamwork and collaboration
  • Crew supervision
  • Interpersonal and written communication
  • Maintenance management
  • Team mentoring
  • Business management
  • Scaffolding set up
  • Attention to detail
  • Dimensions and measurements
  • Construction supervision
  • Task delegation
  • Workflow optimization
  • Effective communication
  • Project deadlines
  • Project leadership
  • Safety policies and procedures
  • Construction deadlines
  • Construction management
  • Job site management

Affiliations

  • Project management with ability to work with multi time zones.
  • Strong team leader.
  • Ability to be hands on and assist in "troubled" zones.
  • Very motivated and reliable.
  • Available to work long hours to complete tasks.

Timeline

Foreman

Pezzlonella Construction
03.2017 - 04.2020

Foreman

Ryan llc
03.2015 - 02.2017

Foreman

Magnum Construction Corp. Michael Camarda
08.2012 - 01.2015

General Foreman

Montana Construction
03.2010 - 07.2012

Bachelor of Arts - General Studies

Tompkins Cortland Community College
James Johnson