Summary
Overview
Work History
Education
Skills
Certification
References
Timeline
Generic

JAMES Lombo

quakertown

Summary

Experienced construction superintendent brings several years of experience in construction. Expert project and team manager with deep understanding of safety, scheduling and codes. Talented at motivating workers to keep projects moving forward for on time completion.

Overview

27
27
years of professional experience
1
1
Certification

Work History

Site Superintendent

James D. Morrissey
Philadelphia
07.2012 - Current

Responsibilities

  • Facilitated effective field operations between general contractor and owner departments to enhance teamwork.
  • Developed detailed two-week look-ahead schedules for contractors to improve project flow.
  • Kept accurate documentation of field changes for accountability.
  • Ensured availability of current as-built documents on site for team reference.
  • Monitored adherence to permits and inspection reports at project site.
  • Provided strong leadership presence on site to direct teams effectively.
  • Interpreted construction documents proficiently for optimized project execution.

Projects

  • 1.3 million sqft. FedEx Warehouse for North Point Development, Demo old maintenance building,import fill placement and install all U.G. Utilities new curb and sidewalks subgrade for lot and dolly pads. $8.5 Million
  • River Road total reconstruction at Keystone Development in Fairless Hill PA. Demo existing road, install new storm water inlets and Hdpe pipe and 12' water main. Install new curb and retaining walls then stone and pave. $1.3 Million
  • 1 Million sqft. Spec Warehouse for North Point Development, oversee basin conversion, use fill to building pad and install storm and install domestic and fire water lines. New curb and asphalt. $6.9 million
  • 1.1 Million sqft. Spec. Building for Kadean Construction, Oversee all site work from importing fill, storm and sanitary new water lines, fire and domestic new curb and sidewalks new parking lots. $7.2million
  • Rt. 1 East bound from Rt. 13 towards Rt.1 split towards Bridge st. Oversee milling crew and install storm and new barrier, install new overhead signs and new asphalt. $2.2 Million
  • 500,000 sqft. Amazon Warehouse for FCL Builders: site was a cut/fill get building pad on grade, install all UG utilities, new curb and sidewalks stone and pave. $3.8 million
  • 756,000 sqft. DHL Warehouse for FCL Builders Oversee all site work cut/fill building pad on grade install all UG utilities sidewalks stone and pave. $5.6 Million
  • 125,000 sqft. Origlio Beverage Cold Storage cut to fill building pad install all storm and water new curb sidewalks stone lot concrete dolly pads then pave lot. $2.2 Million
  • 285,000 sqft. Dietz and Watson Cold Storage Warehouse demo all tunnels under building pad, bring up pad to grade stone pad, install all UG utilities curb sidewalks stone then pave. $3.1million
  • North East Airport 98,000 sqft. Corporate Plane Hanger and Partial Taxi Runway export fill, cut site to grade install utilities work with electricians on Runway new curb sidewalks then pave $1.8 Million
  • Lower Makefield Township Road Improvement Program total road program, demo existing roads install new storm and inlets, install new sanitary, new curb and sidewalks and asphalt. $1.6 Million
  • 486,000 sqft. Marshall's Warehouse for FCL Builders over see all site work including UG utilities from storm and sanitary $4.8 Million
  • 328,000 sqft. Spec Building for FCL Builders get building pad on grade install all UG utilities $3.3 million

Concrete Forman

Reading Site Contractors
Sanatoga
08.1998 - 07.2012
  • Supervised concrete pouring and finishing processes on various construction sites.
  • Set up and poured patchwork on highways for improved surface quality.
  • Established and poured bridge approchement slabs and sleeper slabs for stability.
  • Executed bridge and deck repairs to ensure safety and functionality.

Education

High School Diploma -

Pennridge High School
06.1998

Skills

  • Communicate with all forman daily for needs or concerns
  • Receiving material check all receipts
  • Effective communication with all onsite personal
  • Attention to detail
  • Checking grade elevations and layout
  • working with soil technicians for compaction
  • Document daily reports and issues
  • Verifying subcontractors daily work

Certification

  • OSHA 30
  • Red Cross Adult First Aid CPR/AED

References

References available upon request.

Timeline

Site Superintendent

James D. Morrissey
07.2012 - Current

Concrete Forman

Reading Site Contractors
08.1998 - 07.2012

High School Diploma -

Pennridge High School