Overview
Work History
Education
Skills
Timeline
Generic

James McFalone

San Jose,CA

Overview

13
13
years of professional experience

Work History

Residential Painter

Rich Mc Nerney's Painting Service
02.2022 - 03.2023
  • Used brushes, spray guns and paint rollers to paint surfaces.
  • Completed interior and exterior painting for variety of residential and commercial clients.
  • Covered surfaces and furnishings with cloth and plastic to protect from paint drops.
  • Removed fixtures such as pictures, doorknobs, lamps, and electric switch covers prior to painting.
  • Applied primers or sealers to prepare new surfaces such as bare wood or metal, for finish coats.
  • Used putty knives and caulking guns to fill cracks, holes and joints with plaster, putty and caulk.

Carpenters Apprentice

Can Nelson Construction
11.2017 - 01.2022
  • Assisted with movement of materials and equipment to job sites.
  • Kept job site cleaned up properly and all debris disposed of in respective containers.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Cut materials according to specifications in preparation for installation.
  • Installed insulation, trim and other finishing touches.
  • Measured, cut and installed drywall, paneling and other materials.

Solar Panel Installer

Sun Run
04.2015 - 06.2017
  • Assembled, wired and connected solar panels to existing components and systems.
  • Installed solar panels on multiple residential and commercial properties to meet customer requirements.
  • Checked electrical installation for proper wiring, polarity, grounding, and integrity of terminations.
  • Troubleshot electrical issues related to solar panel installation and implemented swift resolutions.

Carpenters Apprentice

Dan Nelson Construction
01.2010 - 03.2015
  • Assisted with movement of materials and equipment to job sites.
  • Kept job site cleaned up properly and all debris disposed of in respective containers.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Cut materials according to specifications in preparation for installation.
  • Prepared materials accurately using hand and power tools to make precise cuts.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Built flooring, window frames and countertops according to custom carpentry project specifications.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.

Education

High School Diploma -

Lincoln High School
San Jose, CA
06.2011

Skills

  • Handling Procedures
  • Quality Assurance
  • Project Deadlines
  • Pigment Matching

Timeline

Residential Painter

Rich Mc Nerney's Painting Service
02.2022 - 03.2023

Carpenters Apprentice

Can Nelson Construction
11.2017 - 01.2022

Solar Panel Installer

Sun Run
04.2015 - 06.2017

Carpenters Apprentice

Dan Nelson Construction
01.2010 - 03.2015

High School Diploma -

Lincoln High School
James McFalone