Overview
Work History
Timeline
Generic

James Reed

Sumner,WA

Overview

1988
1988
years of professional experience

Work History

Sheet Metal Worker

American Pipe and Steel
  • Fabricated metal components using precision tools and machinery
  • Interpreted technical drawings to ensure accurate measurements and specifications
  • Assembled sheet metal products adhering to safety protocols and quality standards
  • Operated cutting, bending, and welding equipment to produce custom metal solutions
  • Fastened joints and seams together to assemble components into sheet metal products.
  • Used rulers, squares and scribes to measure and mark dimensions and reference lines on materials.
  • Conducted routine maintenance on tools and machinery to uphold operational reliability

Assembly Line Production Worker

Learnet
  • Operated assembly line machinery to assemble components efficiently.
  • Conducted quality checks on finished products to ensure compliance with standards.
  • Collaborated with team members to maintain smooth workflow and productivity.
  • Assisted in training new employees on proper assembly techniques and safety protocols.

Maintenance

River park estaste

Assembly Line Production Worker

Boeing Aircraft
East Coast
1983 - 01.1988

Work in blue streak department on rings in the elevators the fuselage anything to do with sheet metal

Timeline

Sheet Metal Worker

American Pipe and Steel

Assembly Line Production Worker

Learnet

Maintenance

River park estaste

Assembly Line Production Worker

Boeing Aircraft
1983 - 01.1988
James Reed