Searching for a company that builds large projects in the Central Ohio area. I enjoy this type of work. My experience can fit well in any phase of this type of project.
Overview
26
26
years of professional experience
Work History
Foreman Electrician
Wohlford Electric
Columbus
07.2024 - Current
Mount Vernon News building remodel. Bring 3 separate services into building, (1200A, 800A, 400A) for new tenant spaces. Finish lower floor into Mount Vernon Nazarene College Cyber Security/Engineering Lab. Coordinate with all other trades to navigate through 100 year old building. Design did not take into account any support structures or other trades. Redesign service entrance to fit into space available. Mostly exposed pipe work.
Envisage/Invicta Wealth Management- high end building with large amounts of art. Design build with daily onsite meetings throughout the process. Unique lighting package and millwork with lots of detail to take into account while designing electrical layout with other trades. Still currently finishing this project.
Small factory jobs connecting to bus rail
Marijauna dispensaries
Small tenant build outs
Multiline Sales/Service Representative
Andrea Taylor State Farm Agency
Gahanna
10.2017 - 07.2024
Sales to new and current clients.
Service of current policies.
Client help with claims.
Learning new computer systems. Going through a large corporation's system update over three years.
Insturment Tech
Arboris
Newark
08.2014 - 10.2017
Maintenance any needs of the plant from adding outlets and lighting to troubleshooting insturmentation. One of the two instrument techs responsible for running explosive atmosphere conduit and wiring to the Delta V system. Starting computer programming of the system during the end of my time here. I took the job to get closer to a 40-hour week and home. I ended working here due to working 6-7 days a week, 12+ hours a day, for 4 months straight. I made sure to get the company through the main hardship before I left. They were given over a two-month warning before my last day. This was more often the schedule, with being understaffed on the maintenance crew the entire time I was there.
Foreman Electrician
Penn Electric
Columbus
01.2014 - 09.2014
Restaurant remodels, tenant build-outs.
I worked here for a short time, trying to find a better schedule. My wife owned a business, and we were starting to have children. Was not the opportunity I needed.
Foreman Electrician
Weekley Electric
Newark
06.2011 - 12.2013
Water Treatment plant for plastic factory. Controls and simple power expansion to building.
Expansion to Momentive. 1000Amp expansion, connection of quartz cylinder equipment.
New Couglin Toyota sales, car wash, and repair shop. New service, underground for parking lots lights/signs, service.
Natural gas/water repair line facility. Another new building out of the ground and oversaw moving all equipment from old building.
Doctors offices, lighting retrofits to led.
Jorneyman-Foreman-General Foreman
Sasco (I.B.E.W. #11)
Los Angeles
05.2005 - 06.2011
Los Angeles International Airport night shift general foreman. Directed main disturbution home runs thru first phase of airport expansion. I had 16 men directly reporting to me. I was responsible for all conduit orders delivered across airport runway. Bent all night shift large conduit on 4" table bender. Laid out controls of baggage sorting and belt system. Was directly responsible for layout and welding of supports for controls through out belt system.
USC General Hospital journeyman for a year. Promoted to foreman responsible for main distubution onto upper floors of outpatient building. Finalized all earthquake rack support issues through out building with engineers. Lead final punch out of inpatient building, connecting all medical equipment and controls.
Apprentice-Foreman
Settle Muter Electric
Blacklick
08.1999 - 05.2005
Quickly became home run pipe installer. This lead to pulling all home runs, finalizing change order, and punch out. Lots of new-build schools, school remodels, doctors' offices, and Groveport City pool.
Education
Associate of Arts - Construction Business Management
Columbus State Community College
Columbus, Ohio, OH
04-2005
Skills
Mechanical Skills-work well with my hands
Vision-can look ahead and build projects in my head
Dependable-great attendance record
Comfortable working with computers
Comfortable reading other trades prints
Enjoy teaching younger tradesmen
Lots of experience in job site meetings with owners of other construction companies, building owners, their representatives, and architects
Experienced troubleshooting electrical issues
Timeline
Foreman Electrician
Wohlford Electric
07.2024 - Current
Multiline Sales/Service Representative
Andrea Taylor State Farm Agency
10.2017 - 07.2024
Insturment Tech
Arboris
08.2014 - 10.2017
Foreman Electrician
Penn Electric
01.2014 - 09.2014
Foreman Electrician
Weekley Electric
06.2011 - 12.2013
Jorneyman-Foreman-General Foreman
Sasco (I.B.E.W. #11)
05.2005 - 06.2011
Apprentice-Foreman
Settle Muter Electric
08.1999 - 05.2005
Associate of Arts - Construction Business Management