Professional Summary
Overview
Work History
Education
Skills
References
Timeline

James "Blake" Threadgill

International Paper
Wetumpka,AL
14
years of professional experience

Highly motivated professional with 5 years of entrepreneurial and management experience. Professional maintenance leader with comprehensive experience in managing and optimizing shift operations. Expert in troubleshooting, preventive maintenance, and ensuring equipment reliability. Known for fostering collaborative team environments and adapting to dynamic operational needs. Strong communicator with focus on safety, efficiency, and results-driven performance.

Work History

Maintenance Shift Supervisor

2 Years 5 Months
International Paper | 05.2024 - Current
  • Implemented preventive maintenance schedules, enhancing equipment reliability and minimizing downtime.
  • Coordinated troubleshooting efforts for mechanical failures, resolving issues efficiently to maintain production flow.
  • Supervised maintenance teams to ensure adherence to safety protocols and operational standards.
  • Conducted performance evaluations, providing feedback and guidance to improve team capabilities.

Owner

3 Years 5 Months
Threadgill's Welding & Fabrication, LLC | 08.2020 - 01.2024
  • Developed detailed plans for projects based on customer needs and expectations.
  • Identified potential issues or risks, enabling proactive measures for successful project completion.
  • Coordinated with suppliers to procure necessary materials for projects within budget constraints.
  • Resolved construction-related problems, minimizing delays and ensuring project continuity.
  • Performed regular inspections to ensure quality control standards were being met throughout the project life cycle.
  • Ensured safety protocols were being followed at all times by employees and subcontractors on site.
  • Provided guidance and training to new team members to meet performance goals.
  • Monitored progress against established timelines for each project to ensure deadlines are met.
  • Kept clients informed about progress status updates throughout the entire process.
  • Evaluated existing structures for repair or replacement options.
  • Compiled progress reports for each job site, highlighting resource needs to facilitate timely project execution.
  • Worked independently and with other team members to decipher problems and create solutions.
  • Met frequently with clients to gain understanding of goals and service needs.
  • Maintained composure and productivity in high-pressure environments to facilitate client satisfaction.
  • Analyzed customer requirements to provide timely and effective support.

Welder/Structural Fitter

8 Years 2 Months
Burkes Mechanical | 06.2012 - 08.2020
  • Fabricated and welded components to assemble structural forms, such as machinery frames, tanks, pressure vessels, and furnace shells.
  • Welded fabrication materials, continuously checking for safety and quality.
  • Maintained clean working environment by regularly removing scrap metal, contributing to safety and efficiency.
  • Gathered materials for projects to ensure timely completion and adherence to production deadlines.
  • Performed gas tungsten arc welding with filler rods as needed.
  • Fit and welded piping to prevent leakage.
  • Repaired structures by dismantling, reshaping and reassembling metal components with cutting torches and hand tools.
  • Repaired broken or cracked parts using cutting torches and welding equipment.
  • Used welding skills to help repair and maintain heavy-duty machinery.
  • Set up equipment and welded parts according to welding chart specifications and type.
  • Set up welding machines based on the job at hand.
  • Adjusted settings on machines such as current level so it matches the specifications outlined in blueprints and drawings.
  • Determined appropriate filler metal type based on joint design and material being joined together.
  • Cleaned joints before beginning any type of welding process by chipping off slag with a hammer or wire brush.
  • Utilized oxyacetylene torches for preheating metals prior to welding or bending them into desired shapes.
  • Operated manual or semi-automatic flame-cutting equipment to cut metal for fabrication of products.
  • Installed new plant equipment per manufacturer's instructions while adhering to safety protocols.
  • Maintained equipment to extend lifespan and ensure optimal performance in the shop.
  • Assembled structural components with bolts, screws, rivets or welds in accordance with established procedures.
  • Installed pre-fabricated metal structures such as columns, beams and girders according to specifications.
  • Operated overhead cranes, forklifts and other lifting devices when needed during assembly processes.
  • Followed safety guidelines through proper machine guarding and lockout and tagout procedures.
  • Observed safe work rules and utilized fall protection and PPE.

Education

High School Diploma

Heritage West High School | 01-2010

Skills

Preventive Maintenance
Documentation management
Training development
Training development
Maintenance Oversight
Business Management
Marketing strategy
Supplier Coordination
Business Development
Business Planning
Labor Relations
Customer Relations
Process Improvement
Confined space entry
Paperwork Preparation
Relationship Building

References

References available upon request.

Timeline

Maintenance Shift Supervisor

International Paper
05.2024 - CurrentRead More

Owner

Threadgill's Welding & Fabrication, LLC
08.2020 - 01.2024Read More

Welder/Structural Fitter

Burkes Mechanical
06.2012 - 08.2020Read More

Heritage West High School

High School Diploma
Read More
James "Blake" Threadgill