
A seasoned Teamcenter Solution Engineer with a proven track record at Amazon, I excel in migrating and integrating PLM systems, enhancing data management processes, and leading technical teams. Expert in C++, Java, and SAP integration, my solutions boost efficiency and innovation. Skilled in collaboration and problem-solving, I drive projects to successful completion.
17+ Years
Title: Teamcenter Solution Engineer
ePDM Data Migration to TC, Teamcenter 14.2 and AWC 6.2, EPDM data migration. SolidWorks integration with Teamcenter to manage MCAD. Developed custom handlers, utilities and AWC UI customization., Teamcenter Solution Engineer, Amazon, USA, 05/23, Present, Configured initial Teamcenter migration environment in AWS Linux environment., Initial POC to migrate Data from EPDM to TC using Pentaho tool., Developed custom tool to extract ePDM vault files., Developed custom ETL tool to extract meta data from ePDM and convert the data as required by Teamcenter., Developed custom script to load CAD & Non data back into Teamcenter using swim bulk uploader and csv2tcxml., Developed custom Teamcenter utility to change ownership, owning group and apply Release status., Designed custom workflow to transfer the data from TC to SAP., Action and Rule Handlers development., Created new business objects, classic LOV, Dynamic LOV, Extension, Naming rule in BMIDE., Customized Teamcenter Active workspace web page. ECAD Integration with Teamcenter, Teamcenter 12.4, Implementing Altium integration with Teamcenter to manage ECAD Design and Library Parts., Teamcenter Solution Engineer, Molex, USA, 01/23, 05/23, ECAD Altium Integration Installation., Altium Library Integration with Teamcenter using MS Access Database., Develop Library Parts Change Process and ECAD Data Management change process solution., Migrate ECAD Library Parts to Teamcenter. Migrate Data from Agile PLM to Teamcenter, Teamcenter 12.4, We need to migrate the Agile PLM data into Teamcenter., Teamcenter Technical Architect, Apple, USA, 09/22, 01/23, Created POC for PDF download security watermark., Created system design to integrate the external system with Teamcenter., Setup POC environment., Crated a POC for T4EA system with Teamcenter. BOM Migration, Teamcenter 11.1 & TC12.4, Briggs & Stratton was migrating all BOM maintained in different source into Teamcenter as a source system., Teamcenter Solution Engineer, USA, USA, 03/21, 09/22, Initial POC to migrate Data from SAP to TC using Pentaho tool., T4s custom mapping to transfer MM, BOM & Change., Sync back the data from SAP to TC., Bulk load plant extension on both TC & SAP., Designed custom workflow to transfer the data from TC to SAP., Designed the Admin workflows to transfer MM, BOM & weights, and Dimensions., Action and Rule Handlers development., Created new business objects, classic LOV, Dynamic LOV, Extension, Naming rule in BMIDE., Cloning the production environment for the BOM migration project. Teamcenter & AWC Upgrade, Teamcenter 11.1 & 12.4, Altec was upgrading their Teamcenter system from TC11 to Tc12.4 and the T4O integration from T4O 11 to T4O19.2., Teamcenter Solution Engineer, Altec, USA, 11/20, 02/21, Teamcenter Upgrade from Tc11 to Tc12.4., T4O version upgrade from T4O 11 to T4O 19.2., Installed the Deployment 3.2 to generate T4O installation package., AWC upgrade from 3.2 to 5.0., AWC patch from 5.0 to 5.1., Handling the offshore team on AWC & TC cod porting work. ECAD Integration with Teamcenter, Teamcenter 11.1, Life Fitness was implementing Altium integration with Teamcenter to manage ECAD Design and Library Parts., Teamcenter Solution Engineer, Life Fitness, USA, 07/19, 12/19, ECAD Altium Integration Installation., Altium Library Integration with Teamcenter using MS Access Database., Develop Library Parts Change Process and ECAD Data Management change process solution., Migrate ECAD Library Parts to Teamcenter. Configuring new Teamcenter environments & Data Migration, Teamcenter 11.1 & TC12.4, Configured New Teamcenter & T4S environment. Migrated the data from old TC 10 environment. Migrated the data from TC Enterprise., Teamcenter Solution Engineer, Briggs & Stratton, USA, 01/19, 12/19, Service sellable BOM migration from TC 10 to TC12., Classification data migrated from the TcEnt to TC., Developed custom utility to extract data from Tc to external websites., Custom utility to sync the project from SAP to TC., Configured New TC12.1 environment (DEV, QA & PROD)., Configured T4S 19.2 using the deployment Center., Configured the Creo & Solid Works dispatcher setup to create JT., Cloning the production environment for the core migration project., T4S customization enhancement and Data model Management., Created new business objects, classic LOV, Dynamic LOV, Extension, Naming rule in BMIDE., Action and Rule Handlers development., AWC customization., Analyzing the requirements from the end users for AWC customization., Implementing functionality for custom commands., Customization of AWC sublocation page., Configured Tiles to achieve different Part Numbering., Configured stylesheets to Dynamically display change revision properties., Stylesheet creation for custom business objects., Object Set tables rendered & Custom Data Provider., Hosting of Active Workspace to other CAD Tools., Working with HTML panels in XRT., Calling a Teamcenter service in XRT. Cadence Integration with Teamcenter, Teamcenter 11.3.1, Implement Cadence integration with Teamcenter to manage ECAD Design and Library Parts., Solution Consultant, Semiconductor Industry, USA, 08/18, 12/18, Requirement gathering, high level design, detail design and develop solution for a Teamcenter – ECAD Cadence integration project., Develop Library Parts Change Process and ECAD Data Management change process solution., Migrate ECAD Library Parts to Teamcenter. Teamcenter Implementation, Teamcenter 11.3.1, Portal, ITK, Handlers De-customization. Teamcenter upgrade from TC 10.1.7 to TC 11.3.1 support., Application developer, Apple, USA, 08/17, 08/18, Action and rule handler’s development., Recompilation of codes from TC10.1.7version to TC11.3.1., Performing integration testing in upgraded environment., Developed new validation report (Basic validation for parts in EC) in change management process. It has custom SOA service, RAC, Stylesheet, workflow changes., Worked on creating BMIDE customization for auto deploying Preferences, Stylesheets, Workflow templates, Queries, ACL, NX mapping files, Organization and custom binaries., Developed custom utilities for assembly structure creation, JT creation for Assembly, Attribute updates and License check., RAC customization. Teamcenter & SCF Implementation, Teamcenter 10.1.7, HPQC issue support. Performed Requirement Gathering from End Customers and Business., Teamcenter consultant, Lear Corporation, USA, 01/17, 07/17, Created new business objects, classic LOV, Dynamic LOV, Extension, Naming rule in BMIDE., Responsible to build the BMIDE package it includes custom server side & RAC codes (dll & jars) and deliver to customer., Custom extension to load LOV values at runtime., Custom extension to filter Dynamic LOV values at runtime., Custom extensions to link secondary object while create Item and create new form and propagate required properties from primary & secondary object to newly create from and attach the form with secondary target object., Style sheet modification visible when for classification properties., A workflow action handler to create superseded compare report and attach it to ECN object., Custom extension during BOMLine replace to sync secondary item Revisions ID with BOMLine ID., Integration testing between Teamcenter & SCF., Analyzing the requirement., Performing integration testing. T4EA Implementation, Teamcenter 10.1.6, Implemented the integration between Teamcenter and Microsoft Dynamics AX to support the AX Process use cases., Implementation Lead, Winnebago, USA, 07/16, 12/16, Analyzing the requirement., Teamcenter to AX Engineering Change Notice (ECN)., Teamcenter Parts to AX (AX_InitialRelease)., Teamcenter Bill of Material to AX (BOM)., EA data view in Teamcenter., Configured workflow to initiate data transfer from TC to AX in batch mode., Configured Teamcenter preferences to extract TC data., Developed mapping files., Test cases preparation and testing of Workflows., Performing integration testing. Site Consolidation, Teamcenter 10.1, Connect BEKO with Arçelik Central Site. Synchronize data model and Organization structure., Implementation Lead, BEKO, Turkey, 04/16, 06/16, Requirement Gathering., Analyzing the requirement., Setup multisite and FMS shared network using sitcons_extract_shared_vols and sitcons_gen_shared_vols utilities., Test cases preparation., Monitoring & Coordinating with Team., Executed dry run-in test server and Production server., Go live user support after site consolidation. TDW PLM Enhancement – P1R2, Teamcenter 10.1.4, This is Phase 1 Release2 of the PLM enhancement project which deals with active workspace installation, and dispatcher configurations., Implementation Lead, TD Williamson, USA, 09/15, 03/16, Requirement Gathering., Analyzing the requirement., Installing newly released Active Workspace 2.4.2 with .Net web tier support in Customer Environment., Installing/Customizing Dispatcher server and client features to translate NX and Ideas drawing to cgm/jt and pdf., Installing visualization and integrating with Teamcenter., Configured visualization, classification and indexer in AWC., New custom data models are implemented., Implemented classification migration workflow. Classification Implementation, Teamcenter 9.1, The purpose of this project is to create a classification structure., Teamcenter Consultant, TD Williamson, USA, 10/14, 08/15, Requirement Gathering., Analyzing the requirement., Worked with the customer to understand their business process and classification requirements., Created an ITK Utility to generate reports to check the usage of the newly implemented classification hierarchy., Created a new data model in BMIDE for Phase 1 of the project which includes different part types, rules and extensions., Creating custom jar files (RAC customization) for overriding the OOTB Item Creation dialogs., Creating/updating workflows, handlers, extensions and runtime properties per customer requirement., Collecting test feedback and updating if there are any changes., Deploying the solutions to Production servers., Creating necessary documentation. Teamcenter version upgrade from Tc 8.3.3 to TC 10.1.3 and TCRA upgrade, Teamcenter 10.1.3, Portal, ITK, Handlers De-customization. Teamcenter upgrade from TC 8.3.3 to TC 101.3 support., Module Lead, Onsite, Arcelik, Turkey, 05/14, 08/15, Recompilation of codes from TC8.3.3 version to TC10.1.3., Code changes for implementing change management., Monitoring & Coordinating with Team., Upgrade TCRA 9.1 to TCRA 10., TCRA cubes logic changes to support TCRA 10.1., Upgrade of T4x version to 10.1.2., Migration of TCL coding to the new version., T4x Preference changes in Teamcenter based on new version. Single site Consolidation, Teamcenter 8.3, TCRA 9.1, Consolidation of 9 sites into a single site., Module Lead, Onsite, Arcelik, Turkey, 06/13, 03/14, Recompilation of all codes from windows version to Linux version., Developed new ITK utilities to fix data transfer issues., Development of Action and Rule handlers as per customer needs., Configure multi TCRA to single TCRA., Configuration of T4x in the consolidated site., T4S customization enhancement and data model Management., Consolidate all cubes to support a single site., Implemented SOA connection for TCRA. Teamcenter version upgrade from Tc 2007 to TC 8.3.3, T4S Integration and TCRA, Teamcenter 8.3 and TCRA 9.1, Upgrade Teamcenter version. Upgrade TCRA version. Implement new reports in TCRA., Module Lead, Onsite, Arcelik, Turkey, 02/12, 04/13, Develop new custom form using java., Teamcenter upgrade from Tc 2007.1.3f to Tc 8.3., Testing of Handlers and Workflows., Test cases preparation., De – Customization of all reports developed in TCRA8.3., TCRA upgrade from tcra8.3 to TCRA9.1., Material Master Transfer and Bill of Material Integration using T4S., TCL coding for updating Material Master and BOM update., Reverse mapping from SAP to Teamcenter., Update of Material Master and BOM of Material into SAP using Change Workflows., Data Migration. TCRA implementation for 8 sites, Teamcenter 2007.1.3f and TCRA 8.3, TCRA implementation. Develop new TCRA reports., Lead, Onsite, Arcelik, Turkey, 03/11, 01/12, Create separate SQL database instance for TCRA., Created a new TCRA war file and deployed it in web sphere environment., Connection is created between Teamcenter and TCRA., Imported team center users to TCRA and configure scheduler., Developed custom reports in TCRA. Product Development for Systems Engineering Module, Teamcenter 9, This project is basically to add new application named TCSE (Teamcenter System Engineering) to existing Teamcenter., Product Developer, Siemens PLM software, Pune, 04/10, 02/11, Understanding the development Environment of client., Creating new Menus, Actions, Commands and Handlers., Creating new Business Objects in BMIDE and Mapping it to client., Auto generating BMIDE Code and implementing the codes as per Business objects., Creating new Operations and data types in BMIDE., Server-side coding for custom SOA.
Teamcenter Unified 2007/8.3/9.1,10.1,11.3.1,12,13.3 ,14.2.x TCEng.2005 SR1/2007, TCRA and AWC 6.2, C, C++, Java, PLMXML, ITK, Unix Shell scripts, Windows batch scripts, Perl Script, Oracle, Microsoft SQL, JBoss, WebSphere, WebLogic, Tomcat, HP-UX, Sun Solaris, Windows 2000/XP, SolidWorks, NX and Creo, Altium and Cadence, SAP Integration using T4S.