Summary
Work History
Education
Skills
Accomplishments
Languages
Timeline
Generic

Jared Zavala

West Valley City,UT

Summary

Adept at enhancing production efficiency and quality, my tenure at Prinova Group and Winder River honed my skills in equipment monitoring and team building. Achieved significant reductions in leak incidents and consistently surpassed production metrics, demonstrating a commitment to excellence and a proactive problem-solving aptitude.

Work History

Protein Powder Filling and Production Line

Prinova Group
08.2024 - Current
  • Followed safety protocols to prevent accidents and injuries to self and colleagues.
  • Collaborated with other production workers to achieve smooth running of production line.
  • Followed instructions to make products in line with customer specifications.
  • Boxed, labeled, and transported items to support assembly operations.
  • Consistently met or exceeded daily performance metrics, showcasing dedication to company objectives and personal growth as an employee.
  • Packaged and labeled products using automated equipment.
  • Demonstrated flexibility in working various shifts, overtime hours, and weekends as required to meet production demands.
  • Inspected extruded product for appearance and size defects according to specifications.
  • Communicated with supervisor regarding production line issues and needed repairs for fast resolution.
  • Collaborated with team members to achieve daily production goals, contributing to overall positive workplace morale.

Excavation Installation of Pipes

Winder River
06.2024 - 11.2024
  • Collaborated with engineers to design more efficient gas pipeline systems for improved performance.
  • Coordinated with other utilities and contractors during joint projects, facilitating strong working relationships for future collaborations.
  • Reduced leak incidents by promptly repairing damaged sections of the gas pipeline system.
  • Collaborated with local authorities during public infrastructure projects to ensure seamless integration of gas pipelines into existing systems.
  • Conducted risk assessments before beginning any major projects or repairs, ensuring a thorough understanding of potential hazards and necessary precautions.
  • Enhanced pipeline safety by conducting regular inspections and maintenance procedures.
  • Adhered to proper documentation protocols for all work completed, maintaining accurate records as required by company policies and regulatory agencies alike.
  • Minimized environmental impact by employing eco-friendly construction techniques during pipeline installation projects.

Education

Kearns High School
Kearns Utah
05.2024

Skills

  • Hand tools
  • Product packing
  • Production lines
  • Manufacturing background
  • Finishing work
  • Box assembly
  • Power and hand tools
  • Production background
  • Assembly instructions
  • Visual inspections
  • Quality grading
  • Equipment monitoring
  • Type industry background
  • Hand and power tools
  • Fabrication
  • Line inspection
  • Pallet handling
  • Batch production
  • Manufacturing support
  • Quality assurance standards
  • Parts inspection
  • Assembly protocols
  • Palletizing
  • Multitasking
  • Punctuality
  • Safety Procedures
  • Equipment Cleaning
  • Team building
  • Basic Math Skills
  • Product Inspection
  • Order Fulfillment
  • Problem-solving aptitude

Accomplishments

  • Achieved Result by completing Task with accuracy and efficiency.
  • Resolved product issue through consumer testing.
  • Collaborated with team of Number in the development of Project name.

Languages

English/spanish
Elementary

Timeline

Protein Powder Filling and Production Line

Prinova Group
08.2024 - Current

Excavation Installation of Pipes

Winder River
06.2024 - 11.2024

Kearns High School
Jared Zavala