Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jarod Hensarling

Warren,TX

Summary

Resourceful Site Supervisor; tenacious about keeping operations on-schedule and on-budget. Successful at coordinating diverse resources and satisfying tough clients according to demanding timelines.

Skilled Piping Supervisor with over 13 years of experience managing large scale piping projects. Meticulous and detail-oriented with skills in blueprint analysis to align job tasks with construction efforts. Proven skills in execution and coordinations.

Always willing to learn more and drive the bar higher with each task presented. Always maintain excellent communication skills, and carry professionalism to successfully complete each task/ project per client specifications and demands. Proficient in sequencing pipe installations to reduce inference with other project activities. Organized with excellent time management skills.

Overview

1
1
year of professional experience
1
1
Certification

Work History

Piping Supervisor

Universal Plant Services
  • Assembled and secured piping, tubes, fittings and related equipment according to project specifications.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Supervised layout, assembly and installation of various sizes and types of process and critical piping.
  • Reviewed and approved employee time reporting.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • managed multiple crews, up to 30 people at times.
  • oversaw productions of surrounding contractors.

Piping General Foreman " Pemex"

Universal Plant Services
03.2022 - 04.2022
  • Assembled and secured piping, tubes, fittings and related equipment according to project specifications.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Supervised layout, assembly and installation of various sizes and types of process and critical path piping.
  • Oversaw and assisted in Pump/ Compressor alignments, with the use of coordination between site owner and contractors involved.
  • Inspected sights to evaluate safety, operations and crew performance against objectives.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Demonstrated respect, friendliness and willingness to help wherever needed.

Piping General Foreman "Ascend"

Universal Plant Services
01.2022 - 03.2022
  • Assembled and secured piping, tubes, fittings and related equipment according to project specifications.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Supervised layout, assembly and installation of various sizes and types of process and critical path piping.
  • Reviewed and approved employee time reporting.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Inspected sights to evaluate safety, operations and crew performance against objectives.
  • Directed projects according to schedule and quality demands.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-day-day duties accurately and efficiently.
  • Demonstrated respect, friendliness and willingness to help wherever needed.

Piping General Foreman "Blade Project"

Echo Maintenance
09.2021 - 01.2022
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Reviewed and approved employee time reporting.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Analyzed job cost reports to verify within budget production.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.
  • Inspected sights to evaluate safety, operations and crew performance against objectives.
  • Calculated materials and labor required to complete jobs on-schedule and prepared estimates.
  • Sourced suppliers and purchased necessary materials for work.
  • Quickly learned new skills and applied them to daily tasks, improving efficiency and productivity.
  • Carried out day-day-day duties accurately and efficiently.
  • Demonstrated respect, friendliness and willingness to help wherever needed.

Piping Foreman "Blade Project"

Echo Maintenance
05.2021 - 07.2021
  • Maintained cost-effective inventory of spare parts to help achieve production goals.
  • Fabricated new piping and parts to fit specific requirements.
  • Completed daily logs and [Timeframe] progress reports.
  • Helped plant engineers develop solutions to real-world problems.
  • Signed off on inspection test reports and pressure test updates.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Directed projects according to schedule and quality demands.

Pipe Foreman Multiple T/A's

Echo Maintenance
01.2021 - 05.2021
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Reviewed and approved employee time reporting.
  • Liaised between field engineers and trade workers align construction projects with drawings and specifications.
  • Carried out day-to-day duties accurately and efficiently.
  • Demonstrated respect, friendliness and willingness to help wherever needed.

Education

High School Diploma -

Woodville High School
Woodville, TX
05.2009

Skills

  • Multiple-Project Coordination
  • Critical Thinking
  • Worker Supervision
  • Production Standards
  • Safe Operating Procedures
  • Refinery Operations
  • Labor Costing
  • Active Listening
  • Work Site Preparation
  • Project Requirements
  • Materials Estimations
  • Team Assignments
  • Machine Operations
  • Maintaining Safety Standards
  • Materials Movement
  • Workplace Safety
  • Customer Relations
  • Subcontractor Compliance
  • Self Control and Integrity
  • Engineering and Technology
  • Handling Machinery
  • Protective Equipment Knowledge
  • Site Installations
  • Fabricating Components
  • Mathematical Computation

Certification

  • Nccer + piping certification
  • OSHA 10 hr safety
  • multiple certifications on various equipments...

such as track hoes mini up to 320C

bobcat / skidsteer, D5 - D8 dozer high track

front end loaders, multiple sizes of man lifts,

fixed mast/ extenda boom fork lifts.

Timeline

Piping General Foreman " Pemex"

Universal Plant Services
03.2022 - 04.2022

Piping General Foreman "Ascend"

Universal Plant Services
01.2022 - 03.2022

Piping General Foreman "Blade Project"

Echo Maintenance
09.2021 - 01.2022

Piping Foreman "Blade Project"

Echo Maintenance
05.2021 - 07.2021

Pipe Foreman Multiple T/A's

Echo Maintenance
01.2021 - 05.2021

Piping Supervisor

Universal Plant Services

High School Diploma -

Woodville High School