
Over 10 years of experience in project management, pipeline engineering, survey, field engineering and routing/workspace identification. Jarrett has experience in interfacing with key client and project management personnel for engineering, design and survey functions.
Pine Prairie Class Change, Pine Prairie, LA – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of pipelines in the Texas Gas Bastrop to Eunice (“BAE”) system: 36-inch pipeline from milepost (“MP”) 158+4942 to MP 160+2164; 30-inch pipeline from MP 159+3943 to MP 160+2151; and the 26-inch pipeline from MP 159+3915 to MP 160+2134; (ii) installation of a new 36-inch mainline isolating block valve (“MLBV”) and associated blowoff valves at or near MP 160+5072; all necessitated by a population density class change.
Index 130 Class Change, Rankin, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 2,000 feet of Gulf South’s Index 130 30-inch pipeline to accommodate a population density class change.
Index 279 Bear Point Regulation Install, Houma, LA – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the installation of a dual run regulator skid at the Gulf South Bear Point Valve site.
Index 274 Lake Boudreaux Replacement, Houma, LA – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of 1,500 feet of the Gulf South Index 274 4-inch pipeline where the pipeline crosses Lake Boudreaux.
Index 205 and 205-39 Iowa to Franklin Abandonment, New Iberia, LA – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the abandonment of approximately eight miles of Gulf South’s existing Index 205 8-inch nominal diameter pipeline and the addition of upgrading existing piping and regulation equipment.
Index 392 Gwinville Field to Index 387 Interconnect Upgrades, Mt. Olive, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the upgrade of piping and regulation equipment at Gulf South’s existing Gypsy Junction.
Ridgeland TBS Meter Station, Ridgeland, MS, Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of an existing instrument meter with a 3-inch ultrasonic meter skid at the Gulf South existing Ridgeland Town Border Station.
US 165 Railroad Overpass Encroachment, Bonita, LA – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of Texas Gas’s EIS 18-2TT and EIS 18-1TT, 18-inch natural gas pipelines. The pipelines in conflict with the Louisiana Department of Transportation and Development’s (“LADOTD”) plans to rebuild the US 165 railroad overpass.
Index 302 Didlake Road HDD, Crystal Springs, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 800 linear feet of Gulf South’s Index 302 6-inch diameter natural gas pipeline via HDD method of construction where the pipeline crosses and is exposed in Brushy Creek.
Index 393 Saratoga Swamp HDD Replacement, Mt. Olive, MS - Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 3,500 linear feet of Gulf South’s Index 393 10-inch nominal diameter natural gas pipeline via the HDD method of construction where the pipeline crosses and is exposed in Saratoga Swamp and CN Railroad.
Index 381-24 Yazoo River HDD, Redwood, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 6,500 linear feet of Gulf South’s Index 381-24 12-inch diameter natural gas pipeline via the horizontal directional drill (“HDD”) method of construction where the pipeline crosses a portion of the Yazoo River and Kansas City Southern’ s Railroad.
Highway 601 Interchange (MDOT) Gulf Port, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services to accommodate a Mississippi Department of Transportation (“MDOT”) project to construct a new interchange between Interstate 10 and State Highway in near proximity of Gulf South’s Index 300 30-inch natural gas pipeline via HDD,
Highway 57 Bypass (MDOT) Vancleave, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of a Mississippi Department of Transportation (“MDOT”) project to accommodate MDOT’s project to construct Highway 57 Bypass roadway via HDD.
Jackson Dehy Fuel Gas Upgrade, Flowood, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of a new fuel gas supply from Gulf South’s Index 381 18-inch pipeline to Gulf South’s Jackson gas dehydration unit.
Index 130 HCA Replacement, Montpelier, LA – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 970 feet of stress corrosion cracking susceptible pipe within a HCA on the Gulf South Index 130 30-inch pipeline.
Index 306-1 Replacement, Petal, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 1,250 feet of Gulf South’s Index 301-6 8-inch pipeline via HDD.
Index 301-18 Rice Road Extension, Ridgeland, MS – Boardwalk Pipeline Partners
Project Manager responsible for engineering, design and survey services in support of the replacement of the Index 301-18 6-inch Gulf South pipeline to accommodate the extension of Rice Road through the Natchez Trace.
Neely Creek HDD, Flowood, MS – Boardwalk Pipeline Partners:
Project Manager responsible for engineering, design and survey services in support of the replacement of approximately 2,000 of the Index 906 16-inch pipeline via HDD crossing Neely Creek.
Lamar County Expansion, Puris, MS – Boardwalk Pipeline Partners:
Project Manager responsible for engineering, design and survey services in support of approximately 4 miles on 20-inch natural gas pipeline and the Plant Morrow Meter Station
Index 301-4-2 City of Madisonville Interconnect, Madisonville, LA - Boardwalk Pipeline Partners: Project Manager responsible for engineering, design and survey services in support of the installation of interconnecting facilities from the existing Index 301-4-2, 6-inch Gulf South pipeline to the City of Madisonville regulator skid.
Ergon Refinery Meter Upgrade Project, Vicksburg, MS - Boardwalk Pipeline Partners: Project Manager responsible for engineering, design and survey services in support of a stopple bypass from the Index 381-24 pipeline for the Ergon Refinery, and the demolition and installation of a 4-inch ultrasonic meter skid.
Benndale Power Plant Interconnect Project, Benndale, MS - Boardwalk Pipeline Partners: Project Manager responsible for engineering, design and survey services in support of the installation of interconnecting facilities from the existing Index 311 20-inch Gulf South pipeline to Cooperative Energy’s new Benndale Power Plant.
Index 130 HDD at Colyell Creek Project, Livingston, LA - Boardwalk Pipeline Partners: Project Manager responsible for engineering, design and survey services in support to replace a section of a 30-inch natural gas pipeline via HDD.
Index 130 Block Valve Colyell Creek, Livingston, LA - Boardwalk Pipeline Partners: Project Manager responsible for engineering, design, and survey services in support of the installation of one 30-inch mainline block valve on Gulf South’s Index 130 natural gas pipeline.
Index 301-18 North and South Locations Replacement Project, Canton, MS - Boardwalk Pipeline Partners: Project Manager responsible for engineering, design and survey services in support to replace two sections of a six-inch natural gas pipeline via HDD.