Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
10
10
years of professional experience
Work History
Solar Tech 2/O&M Tech 2
Pearce By CBRE
08.2024 - Current
installed jumpers to next tracker spc's and replaced mc 4 connectors on panels
replace harnesses on panels and reconnect wiring
Configured junction boxes on rear of panels in residential setting.
replaced panels on rooftops and realigned components and wired
Diagnosed faults on 3150 and 3600 inverters to ensure optimal performance.
conduct monthly inspections on SCADA systems and NCUs and met stations
Performed monthly inspections on tracker arrays and equipment, led semi-annual inverter maintenance for enhanced reliability, executed annual inverter maintenance to ensure dependable operations, and conducted DC disconnect inspections for safety compliance.
Organized items on-site and ensured proper placement in storage areas.
Established grounds on feeders and secured hook switches on feeders at substation.
Guide contractors on-site to perform warranty work and troubleshoot existing issues
Solar Technician
People Ready / Gamechange Solar
07.2021 - 08.2024
inspected panel for cracks, damaged panels, and broken emergency stops and actuators and faulty nodes
installed batteries and motherboards, configured them
retrofitting site with GCS equipmentof all actuators and nodes
resolved issues on GCS monitoring app via phone, such as loss of communication, charging errors, and E-stop activations.
repaired damaged charging panels, batteries, and nodes exhibiting heat damage from battery explosion
Lead Person Packout
Koch’s Poultry
09.2018 - 06.2021
guaranteed line operated smoothly and bags were packed properly
input Julian dates alongside customer product codes indicating today's run while maintaining full ink levels and accurate box coding
Recorded employee attendance times and reported findings to supervisor.
ensured bags contained required number of pieces
rotated with employees for restroom breaks
worked alongside supervisor on production line and anticipated yield of product included in box
QA TECH
Koch’s Poultry
01.2017 - 06.2018
Documented hourly evaluations of chicken tender dimensions and defects for different clients according to product ran for the day.
Monitored product temperature, ensuring it stayed below 40 degrees Fahrenheit
Monitored compliance with PPE standards on production floor while preventing gum chewing and candy eating.
inspected labels and boxes alongside bag types based on order details and product numbers.