Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jasmine S. Allen

Summary

A nuclear trained worker with years of experience. Strong written and verbal communication skills, hard-working, and excited to pursue advancement within the nuclear industry.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Mechanic I

Surry Nuclear Power Station
10.2023 - Current
  • Replace Feed Water In Board and Out Board mechanical seals
  • Swap Feed Water Heat Exchanger with new like for like replacement
  • Uncouple piping on motor HP Heater Drain Pump 1B
  • Uncouple Bearing Cooling Pump
  • Remove coupling guard, remove coupling, clean and align coupling
  • Replaced damaged or defective parts with new components.
  • Lubricate couplings.
  • Clean lube oil sump
  • Replace lube oil
  • Clean and inspect bearing oil system
  • Install and fasten shrink disc assembly
  • Flush lube oil system
  • Install Kidney Machine
  • Align motor to pump and motor to motor.
  • Set float

Valve Technician

Oconee Nuclear Station
04.2024 - 05.2024
  • Improved valve system efficiency by conducting thorough inspections and identifying areas for repair or replacement.
  • Lubricated wearing surfaces of mechanical parts using oils or other lubricants.
  • Repaired or replace failing valves with new like for like components.


AOV Technician

Susquehanna Steam Electric Station
03.2024 - 04.2024
  • Replace diagrams
  • Replace O-rings
  • Install AOVs

Valve Technician

Pointe Beach Power Station
03.2024 - 03.2024
  • Install Main Steam Safety’s
  • Repair actuator assembly
  • Perform Lisa Test
  • Repack Pressure Seal Gate Valve
  • Open and inspect Pressure Relief Valve
  • Open and inspect Check Valves
  • Perform measurements using dial calipers and micrometers

Valve Technician

St. Lucie Nuclear Power Station
03.2024 - 03.2024
  • Pack and consolidate valves
  • Disassemble Pressure Seal Valves
  • Open and inspect Check Valves
  • Perform blue checks
  • Torque bolting
  • Take measurements with dial calipers and feeler gauges

Lead Valve Technician

Millstone Nuclear Power Station
10.2023 - 11.2023
  • Pack and consolidate valves
  • Disassemble Pressure Seal Valves
  • Open and inspect Check Valves
  • Perform blue checks
  • Torque bolting
  • Take measurements with dial calipers and feeler gauges

Safety Relief Valve Technician

Turkey Point Power Station
04.2023 - 04.2023
  • Company Overview: Westinghouse/BHI Energy
  • Uninstall, test, and reinstall safety relief valves
  • Run DWP package software
  • Westinghouse/BHI Energy

Safety Relief Valve Technician

St. Lucie Power Station
02.2023 - 03.2023
  • Company Overview: Westinghouse/BHI Energy
  • Uninstall, test, and reinstall safety relief valves
  • Run DWP package software
  • Westinghouse/BHI Energy

Mechanic

Surry Nuclear Power Station
10.2022 - 12.2022
  • Overhaul Main Steam PORV actuator;
  • Bettie Ball Valve and actuator
  • Leslie Actuator Diaphragm and Stem seal replacement
  • Rebuild site glass

ITP Closure Tech

Vogtle
03.2022 - 09.2022
  • Close out work order packages to send to Document Control
  • Data entry in Maximo and Excel

Jr Valve Technician

Turkey Point Power Station
10.2021 - 11.2021
  • Company Overview: BHI Energy
  • Uninstall, test, and reinstall safety relief valves
  • Run EWP and DWP package software
  • BHI Energy

Jr Valve Technician

St. Lucie Power Station
08.2021 - 09.2021
  • Company Overview: BHI Energy
  • Pack and consolidate valves
  • Disassemble Pressure Seal Valves
  • Open and inspect Check Valves
  • Perform blue checks
  • Torque bolting
  • Take measurements with dial calipers and feeler gauges
  • Install valves
  • BHI Energy

Valve Technician

Highly Technological Piping Company
06.2019 - 06.2021
  • Disassemble valves
  • Testing Safety Relief Valves
  • Inspect/clean stuffing box
  • Inspect seating surfaces for wear marks
  • Perform blue checks
  • Take measurements using dial calipers and micrometers
  • Run tubing
  • Test valves for seat leakage

Jr Valve Technician

St. Lucie Power Station
04.2021 - 05.2021
  • Company Overview: BHI Energy
  • Pack and consolidate valves
  • Disassemble Pressure Seal Valves
  • Open and inspect Check Valves
  • Perform blue checks
  • Torque bolting
  • Take measurements with dial calipers and feeler gauges
  • BHI Energy

Insulator

North Anna Nuclear Power Station
02.2021 - 03.2021
  • Perform installation, removal, and repair of insulating materials on various equipment
  • Fabricate material used for installation

Eddy Current Tech

Vogtle Nuclear Power Station
08.2020 - 08.2020
  • Ran, and setup ultrasonic cables
  • Helped interpret Lamb wave via program

Jr Valve Technician

Turkey Point Power Station
04.2020 - 05.2020
  • Company Overview: BHI Energy
  • Pack and consolidate valves
  • Disassemble Pressure Seal Valves
  • Open and inspect Check Valves
  • Perform blue checks
  • Torque bolting
  • Take measurements with dial calipers and feeler gauges
  • Assemble valves
  • Repacked and repaired T-handle Hancock
  • Assist in rigging via chain fall and setting up rigging
  • BHI Energy

Jr Valve Technician

Pointe Beach Power Station
03.2020 - 03.2020
  • Removed, repaired, and installed:
  • Gate, globe, plug, and butterfly
  • Properly torqued flanges and bonnets using
  • Performed Diaphragm swaps/stop nut settings on Grinnell valves
  • Performed blue checks on isolation, and check valves

Pipefitter

Dominion Surry Power Station
10.2019 - 11.2019
  • Support welders
  • Grind/prep metal in the shop
  • Demolition of pipe
  • Tack weld

Pipefitter

Comanche Peak Nuclear Power Plant
04.2019 - 05.2019
  • Support welders
  • Grind/prep metal in the shop
  • Demolition of pipe

Eddy Current Tech

Susquehanna Steam Electric Station
03.2019 - 04.2019
  • Ran, and setup ultrasonic cables
  • Helped interpret Lamb wave via program

Pipefitter

Dominion Surry Power Station
10.2018 - 11.2018
  • Support welders
  • Grind/prep metal in the shop
  • Demolition of pipe

Laborer

Dominion Surry Power Station
03.2018 - 04.2018
  • Offer support to Dominion employees as needed
  • Provide flood and confined space monitoring
  • Fire watch

Utility

Dominion North Anna Power Station
09.2017 - 10.2017
  • Offer support to Dominion employees as needed
  • Provide flood and confined space monitoring
  • Fire watch

Education

Pipe Welding -

Georgia Trade School
08.2017

Structural Plate - Tungsten Inert Gas Welding

South Coast Welding Academy
02.2017

Skills

  • Safety Relief Valves
  • Pressure Seal Valves
  • EWP & DWP Software
  • Maximo
  • Primavera 6 Advanced

Certification

  • EPRI – MM03.01b (Globe Valves)
  • MM03.01c (Check Valves)
  • MM03.01D (Ball, Butterfly, and Plug Valves)
  • OSHA 30 Hour Construction Industry Outreach

Timeline

Valve Technician

Oconee Nuclear Station
04.2024 - 05.2024

AOV Technician

Susquehanna Steam Electric Station
03.2024 - 04.2024

Valve Technician

Pointe Beach Power Station
03.2024 - 03.2024

Valve Technician

St. Lucie Nuclear Power Station
03.2024 - 03.2024

Lead Valve Technician

Millstone Nuclear Power Station
10.2023 - 11.2023

Mechanic I

Surry Nuclear Power Station
10.2023 - Current

Safety Relief Valve Technician

Turkey Point Power Station
04.2023 - 04.2023

Safety Relief Valve Technician

St. Lucie Power Station
02.2023 - 03.2023

Mechanic

Surry Nuclear Power Station
10.2022 - 12.2022

ITP Closure Tech

Vogtle
03.2022 - 09.2022

Jr Valve Technician

Turkey Point Power Station
10.2021 - 11.2021

Jr Valve Technician

St. Lucie Power Station
08.2021 - 09.2021

Jr Valve Technician

St. Lucie Power Station
04.2021 - 05.2021

Insulator

North Anna Nuclear Power Station
02.2021 - 03.2021

Eddy Current Tech

Vogtle Nuclear Power Station
08.2020 - 08.2020

Jr Valve Technician

Turkey Point Power Station
04.2020 - 05.2020

Jr Valve Technician

Pointe Beach Power Station
03.2020 - 03.2020

Pipefitter

Dominion Surry Power Station
10.2019 - 11.2019

Valve Technician

Highly Technological Piping Company
06.2019 - 06.2021

Pipefitter

Comanche Peak Nuclear Power Plant
04.2019 - 05.2019

Eddy Current Tech

Susquehanna Steam Electric Station
03.2019 - 04.2019

Pipefitter

Dominion Surry Power Station
10.2018 - 11.2018

Laborer

Dominion Surry Power Station
03.2018 - 04.2018

Utility

Dominion North Anna Power Station
09.2017 - 10.2017

Structural Plate - Tungsten Inert Gas Welding

South Coast Welding Academy
  • EPRI – MM03.01b (Globe Valves)
  • MM03.01c (Check Valves)
  • MM03.01D (Ball, Butterfly, and Plug Valves)
  • OSHA 30 Hour Construction Industry Outreach

Pipe Welding -

Georgia Trade School
Jasmine S. Allen