Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jason Cloud

Hanceville,AL

Summary

Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Capable Construction Laborer experienced in operating and maintaining equipment to support job site needs. Physically strong and fit with good time management abilities and

dexterity to support skilled work.

Overview

7
7
years of professional experience

Work History

Stamping Press Operator

Reliance Worldwide
Cullman, AL
08.2020 - Current
  • Set up and operated stamping press according to specifications.
  • Adjusted presses, dies and punches as necessary to achieve desired results.
  • Inspected parts for accuracy of dimensions and conformance to quality standards.
  • Loaded material into hoppers or onto feed tables.
  • Verified part tolerances using gauges such as calipers, micrometers.
  • Monitored machine operations to detect malfunctions or out-of-tolerance machining, and adjusted machines as necessary.
  • Maintained records of production volumes and scrap rates.
  • Ensured that safety protocols were adhered to at all times in the work area.
  • Troubleshot problems with machinery when they occurred.
  • Repaired worn or damaged parts on stamping press machines using hand tools such as files, grinders, hammers.
  • Cleaned work areas regularly to maintain a safe working environment.
  • Communicated with supervisors regarding equipment repairs or replacement needs.
  • Assisted other team members with tasks such as loading raw materials into hoppers or unloading finished products from conveyors.
  • Followed established procedures for operating the stamping press safely.
  • Adhered to all company policies related to quality control processes.
  • Provided training to new employees on proper operation of stamping press machines.
  • Assisted in developing standard operating procedures for the stamping press department.
  • Verified dimensions of work piece and made adjustments if necessary.
  • Cleaned and lubricated presses and components using oil, solvents and rags.
  • Removed printed materials from presses for transport to storage or finishing areas.
  • Operated equipment at required speed to drive proper alignment and registration.
  • Promoted safety within department and followed protocols to maximize safety and prevent risk.
  • Leveraged preventive maintenance techniques to maintain or adjust equipment.
  • Updated job knowledge by participating in educational and training opportunities.
  • Set up and operated progressive presses to produce materials to customer specifications.
  • Installed, adjusted, dismantled, reassembled and removed parts and equipment such as rollers, dies, printing plates and blankets.
  • Troubleshot press when product defects occurred and immediately remedied issues.
  • Performed basic equipment repairs and replaced parts.
  • Understood and complied with plant environmental, health and safety, environmental and OSHA regulatory requirements.
  • Notified supervisors of malfunctions, nonconformances or quality issues.
  • Operated and set tools on various machines and kept machines running to required levels.
  • Transported materials and finished products between departments.
  • Monitored machine operations and observed control panels and gauges to identify malfunctions.
  • Synchronized machine speeds to complete complex or multi-step processes.
  • Trained new employees on company and safety standards, providing assistance and remediation with issues.
  • Read and interpreted operation and parameter sheets to effectively complete each job.

Contractor

Joe Gamble
Birmingham, AL
02.2017 - 08.2020
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Installed formwork for concrete structures according to specifications.
  • Repaired damaged structures with appropriate materials including wood and metal components.
  • Built temporary supports during construction processes such as shoring up beams or columns until they are set in place permanently.
  • Transported materials from one site location to another using trucks or trailers.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Measured distances accurately using tape measures or laser measuring devices.
  • Conducted regular maintenance checks on all tools used during construction process ensuring that they were properly functioning at all times.
  • Cleaned job sites daily removing debris, dirt and hazardous materials safely.
  • Coordinated with other workers onsite to ensure efficient completion of tasks.
  • Provided assistance to supervisors when needed completing additional duties as assigned.
  • Ensured compliance with local codes regarding building regulations.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Completed general carpentry, electrical, mechanical, HVAC and plumbing installations and repairs.
  • Utilized electrical, plumbing and HVAC expertise to complete projects and adhere to timelines.
  • Used picks and shovels to dig, spread and level dirt and gravel.
  • Used wheelbarrow to move debris and material to designated areas on jobsite.
  • Built and disassembled scaffolds, bracing and barricades to assist in vertical construction activities.
  • Used trowels and floats to smooth and finish freshly poured cement or concrete.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Assisted with diverse construction challenges to help team and customer.
  • Measured, marked or recorded openings or distances to construction layout areas.

Education

GED -

Wallace State Community College - Hanceville
Hanceville, AL

Skills

  • Machine Operation
  • Equipment Calibration
  • Press maintenance
  • Measurement tools
  • Blueprint Interpretation
  • Safety Management
  • Preventive Maintenance
  • Quality Control
  • Work Order Interpretation
  • Production Monitoring
  • Active Listening
  • Equipment Operation
  • Multitasking
  • Modifications and adjustments
  • Problem-solving aptitude
  • Attention to Detail
  • Product Inspection
  • Reliability
  • Time Management
  • Adaptability and Flexibility
  • Professionalism
  • Team building
  • Self Motivation
  • Organizational Skills
  • Time management abilities
  • Problem-Solving
  • Team Collaboration
  • Over Head Crane Experience
  • Decision-Making
  • ForkLift Experience
  • Heavy Equipment Operation
  • Scaffold building
  • Power Tool Operation
  • Traffic routing
  • Window Installation
  • Demolition
  • Framing
  • Carpentry
  • Flooring Installation
  • Scaffolding Setup
  • Worksite safety
  • HVAC Systems
  • Cabinet installation
  • Material Transport
  • Construction
  • Mortar mixing
  • Concrete mixing
  • Hand tool expertise
  • Welding
  • Fire prevention

Timeline

Stamping Press Operator

Reliance Worldwide
08.2020 - Current

Contractor

Joe Gamble
02.2017 - 08.2020

GED -

Wallace State Community College - Hanceville
Jason Cloud