Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Jason Jones

Paoli,IN

Summary

Accomplished CNC Mill Machinist at Jasper Group with expertise in precision measuring and adaptive machining. Enhanced product quality and reduced cycle times through effective collaboration and innovative tooling selection. Recognized for reliability and attention to detail, consistently exceeding project deadlines while fostering a positive team environment.

Overview

9
9
years of professional experience

Work History

CNC Mill Machinist

Jasper Group
05.2025 - Current
  • Maintained a safe working environment by adhering to all safety protocols and procedures during machine operation.
  • Assisted in training new employees on CNC mill operation, ensuring consistent quality standards across the team.
  • Reduced material waste by carefully selecting appropriate tooling and fixtures for each job.
  • Improved product quality by meticulously setting up and operating CNC mills for precision machining.
  • Collaborated with engineering team to develop optimized milling programs, resulting in reduced cycle times and increased throughput.
  • Contributed to on-time delivery of projects by effectively managing workload and prioritizing tasks according to deadlines.
  • Minimized downtime through effective communication with maintenance technicians regarding equipment malfunctions or necessary repairs.
  • Boosted team morale by fostering a positive work environment, actively participating in group discussions, and sharing best practices with colleagues.
  • Perfect Attendance

Heavy Equipment Operator

Weihe Construction
06.2023 - 09.2023
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Performed Preventative Maintenance Regularly
  • Adhered to heavy equipment safety and operation protocols, resulting in minimal complaints or incidents.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Met project demands consistently through careful and consistent operation of heavy equipment.
  • Adapted quickly to changing project requirements or unexpected obstacles encountered during the course of work assignments.
  • Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.
  • Operated machining equipment safely with team of operators.
  • Played a key role in successful project completions by maintaining open lines of communication with supervisors and team members, ensuring timely adjustments to work strategies when needed.
  • Contributed to a positive work environment through effective teamwork, communication, and adherence to safety protocols.
  • Remove debris and leveled ground to prepare job sites for construction projects.
  • Moved equipment between job locations using truck and trailer.
  • Demonstrated commitment to safety by consistently wearing appropriate personal protective equipment and following all established protocols.
  • Boosted overall project efficiency by effectively planning machine movements and coordinating with other operators onsite.
  • Mitigated potential hazards by promptly reporting unsafe conditions or damaged equipment to supervisors.
  • Collaborated with team members to complete complex projects, utilizing strong communication skills and problem-solving abilities.
  • Assisted team in setting up and dismantling equipment and tools to use for construction.

Tower Technician

Wanzek Construction, Inc.
12.2018 - 04.2019

New Install and repair work.


Connector Tower Hand

Renewable Energy Solutions
05.2016 - 08.2018
  • Improved safety standards by conducting regular equipment inspections and maintenance for tower climbing tasks.
  • Enhanced team efficiency by providing comprehensive training on tower climbing techniques and safety protocols.
  • Performed 5-7 installations per week.
  • Collaborated with cross-functional teams to address technical issues and challenges during project execution.
  • Exceeded customer expectations by consistently completing projects ahead of schedule without compromising quality or safety standards.
  • Ensured timely completion of projects through effective task delegation and coordination among team members.
  • Played an integral part in the continuous improvement of company processes and procedures by sharing insights from on-the-job experiences and attending industry conferences to stay abreast of emerging trends.
  • Performed thorough post-installation inspections to ensure proper equipment alignment, signal strength optimization, and compliance with regulatory guidelines.
  • Assisted in the troubleshooting and repair of existing tower systems, ensuring optimal functionality and performance.
  • Bolted equipment into place using hand and power tools.
  • Lifted equipment into position using cranes, rigging tools and gin poles.
  • Determined required installation methods and assembled proper tools and equipment to complete projects to specifications.
  • Performed tower construction at heights of 300 feet while maintaining focus on safety.
  • Drove truck and trailer to and from job sites, up to 2 hour drives.
  • New installs and repairs
  • Ground man-Tower Hand
  • Heavy Machine Operator

Education

GED -

Perry Meridian
Indianapolis, IN
04-2006

Skills

  • Machine setup
  • Precision measuring
  • Tolerance analysis
  • Machining operations
  • Tool selection
  • Adaptive machining
  • In-process inspection
  • Blueprints reading
  • Mechanical troubleshooting
  • Equipment set up
  • Parts fabrication
  • Schematics reading
  • Equipment calibration
  • Machine calibration
  • CNC mill operation
  • Tool safety
  • Measurement tools
  • Teamwork and collaboration
  • Time management
  • Attention to detail
  • Reliability
  • Material handling
  • Industrial safety
  • Decision-making
  • Paperwork and documentation
  • Safety procedures
  • Deadline oriented
  • Task prioritization
  • Equipment operation
  • Self motivation
  • Work prioritization
  • Computer literacy
  • Professionalism
  • Product inspection
  • Quality control
  • Preventive Maintenance
  • Mathematical proficiency
  • Equipment monitoring

Accomplishments

Perfect Attendance

$1.50 raise

have operated six different machines that perform different tasks

have obtained fork lift certification

Timeline

CNC Mill Machinist

Jasper Group
05.2025 - Current

Heavy Equipment Operator

Weihe Construction
06.2023 - 09.2023

Tower Technician

Wanzek Construction, Inc.
12.2018 - 04.2019

Connector Tower Hand

Renewable Energy Solutions
05.2016 - 08.2018

GED -

Perry Meridian