Summary
Overview
Work History
Education
Skills
Websites
Certification
Timeline
Generic

Jason McClintock

Wayne City,IL

Summary

Experienced leader with skills spanning multiple industries. Experience in creating work processes and implementing them from the ground up. Our team created a Method Of Procedure (MOP) and a training program that was implemented across multiple facilities throughout the US. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.

Overview

16
16
years of professional experience
1
1
Certification

Work History

Assembly Specialist

Toyota Motor Manufacturing Indiana
12.2023 - Current
  • Demonstrated adaptability by quickly adjusting to changes in production schedules or priorities as necessary.
  • Actively participated in continuous improvement initiatives, leading to increased efficiency throughout the assembly process.
  • Collaborated with team members to promptly complete tasks and maintain consistent workflows.
  • Inspected completed products to encourage quality and adherence to company standards.
  • Recognized and reported defective material and equipment to shift supervisor.
  • Completed tasks on time to meet quality and safety standards.
  • Assembled production parts with high degree of accuracy and precision using hand and power tools.
  • Followed safety protocols to maintain safe working environment.

IT Specialist

Walgreens
08.2022 - 12.2023


  • Order Processing and Order Fill within AS400
  • Created and implemented a work procedure for CP Smoothing
  • Trained a department on how to properly do CP Smoothing and serve as the POC for any issues that arise during.
  • Configured hardware, devices, and software to set up work stations for employees.
  • Managed hardware and software inventory, ensuring timely updates and replacements as needed.
  • Walked individuals through basic troubleshooting tasks.
  • Explained technical information in clear terms to promote better understanding for non-technical users.
  • Responded to support requests from end-users and patiently walked individuals through basic troubleshooting tasks.
  • Trained employees on new technologies, increasing competency levels across the organization.
  • Used ticketing systems to manage and process support actions and requests.
  • Installed, configured and maintained computer systems and network connections.
  • Installed and configured operating systems and applications.
  • Created user accounts and assigned permissions.

Operations Manager

The Diamond Bonsai
03.2018 - 05.2022
  • Supervised operations staff and kept employees compliant with company policies and procedures.
  • Managed inventory and supply chain operations to achieve timely and accurate delivery of goods and services.
  • Led hiring, onboarding and training of new hires to fulfill business requirements.
  • Developed and maintained relationships with external vendors and suppliers.
  • Developed systems and procedures to improve operational quality and team efficiency.
  • Oversaw facility maintenance, ensuring optimal functionality of equipment and infrastructure at all times.
  • Introduced new methods, practices, and systems to reduce turnaround time.
  • Achieved higher employee retention rates by fostering a positive work environment and providing opportunities for professional growth.
  • Identified and resolved unauthorized, unsafe, or ineffective practices.
  • Handled staff training initiatives aimed at upskilling the workforce to meet dynamic industry demands.
  • Championed safety protocols to maintain a secure working environment, reducing workplace accidents significantly.

Facilities Coordinator

Stonecrop Technologies
04.2017 - 03.2018
  • Handled troubleshooting and maintenance support for a large Telecommunications logistics facility
  • Worked with cabinet and tower technicians to troubleshoot issues With ALU, Ericsson, Samsung MMBTS cabinets and Radio Heads.
  • Trained Employees on proper fiber and coax testing with ODM and Anritsu equipment
  • Assisted in the development of emergency preparedness plans, ensuring staff was trained in proper procedures during critical situations.
  • Enforced compliance with applicable health, safety and environmental regulations to reduce risks.
  • Ensured safety compliance by conducting regular inspections, identifying potential hazards, and implementing corrective actions.
  • Communicated with general managers and facility teams regarding upcoming repairs and projects.
  • Maintained physical condition of facilities, applying available resources and personnel to achieve safe, clean, and functional environment.
  • Served as point of contact for internal and external customers seeking support and information.

Parts Engineer

Stonecrop Technologies
07.2014 - 03.2018
  • Handle education of employees on different parts and processes
  • Worked closely with customer to resolve parts issues and order issues
  • Wrote work processes for kitting within the DCs
  • Training employees on the use and assembly of each piece of equipment.
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Applied lean principles to enhance efficiency and reduce waste in various engineering projects.
  • Participated in formal internal design reviews of proposed products and components.
  • Optimized engineering processes by implementing innovative solutions and streamlining workflow.
  • Collaborated on interdisciplinary teams to develop creative, cost-effective solutions for complex projects.
  • Interacted with subject matter experts to develop training material and tools for personnel.
  • Interpreted blueprints and technical drawings to analyze upcoming projects.
  • Routed and integrated technical and electrical components for projects.

RAN Comissioning Engineer

Stonecrop Technologies
04.2016 - 04.2017
  • Acted as the primary liaison between Operation, Sprint Network Team, Picking, and RAN Commissioning Team.
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Wrote, reviewed and edited technical document in accordance with template requirements.
  • Participated in formal internal design reviews of proposed products and components.
  • Developed work plans for various personnel roles based on strengths and talents.
  • Provided input to team lead regarding areas for process and procedural improvement.
  • Interacted with subject matter experts to develop training material and tools for personnel.

New Projects Manager

Stonecrop Technologies
07.2014 - 10.2016
  • Train employees on field standards and practices while pre-kitting in a warehouse
  • Worked with other members of the Engineering teams to write MOPs and ensure that everyone is trained on process
  • Worked with Warehouse management staff to resolve issues holding up sites and as a source of cellular information when needed
  • Work through any new projects or processes to set standards and create MOPs
  • Worked with Ericsson, Samsung, ALU, and Nokia equipment.
  • Enhanced team collaboration through regular meetings, progress updates, and addressing concerns promptly.
  • Developed custom-tailored training programs for new hires, expediting their integration into the team and enhancing overall project performance.
  • Managed cross-functional teams for successful project completion within budget and on schedule.
  • Cultivated a positive work environment that fostered teamwork, innovation, and creative problem-solving among team members.
  • Boosted client retention rates by consistently delivering projects that exceeded expectations in quality and timeliness.
  • Monitored project performance to identify areas of improvement and make adjustments.

Integration Engineer

Samsung Telecommunications America
12.2013 - 07.2014
  • Worked as an integration and migration engineer for the NetVision and 2.5 deployments in the Western Washington Market
  • Fiber and T1 integration and testing
  • Troubleshooting on Samsung MMBS, Cisco ASR9000 routers, Eltek and Emerson power systems
  • Built cabinets according to Samsung and Sprint standards (power to RRUs, DUs)
  • Reconfigured cabinets for 2.5 deployment and troubleshoot any issues with 2.5.
  • Optimized system performance by troubleshooting and resolving complex technical issues related to integration, infrastructure, and software components.
  • Collaborated with cross-functional teams to identify requirements, design solutions, and deliver integrated systems that met business needs.
  • Achieved successful project completion by consistently meeting deadlines and adhering to budget constraints while maintaining high-quality work standards.
  • Maintained up-to-date knowledge of industry trends in software integration, ensuring the incorporation of best practices into all projects undertaken.
  • Resolved issues related to operational components for LAN, WAN and voice systems.
  • Provided 2nd and 3rd level technical support and troubleshooting to internal and external clients.
  • Managed and monitored installed systems for highest level of availability.
  • Managed installation, upgrade and deployment projects and provided on-site direction for network engineers.

Logistics Manager

Stonecrop Technologies
11.2013 - 12.2013
  • Helped build out a new warehouse and train incoming staff for Sprint prekitting operation
  • Managed the floor and worked through any site issues we would encounter
  • Made sure all product going out the door passed quality inspections.
  • Enhanced customer satisfaction by closely monitoring order fulfillment and addressing issues promptly.
  • Directed shipping and receiving of wide range of products daily.
  • Managed a team of logistics professionals, providing coaching and guidance for career development and skill enhancement.
  • Meticulously tracked shipments from origin to destination, proactively addressing any delays or issues that arose during transit.
  • Monitored logistics performance and identified improvement opportunities.
  • Selected, trained and developed logistics personnel to achieve high-performing teams.
  • Kept corporate departments and customers updated on critical shipments.
  • Trained new staff on job duties, company policies, and safety procedures for rapid onboarding.
  • Oversaw warehouse staff and maintained efficiency in fast-paced environment.

Microwave Technician

Stonecrop Technologies
08.2013 - 11.2013
  • Sprint NetVision Project
  • Tiger Team for Microwave project in the Chicago market
  • Install and Align Dragonwave Microwave links
  • Troubleshoot links and lines using Anritsu test gear
  • Gather data for closeouts on various links.
  • Maintained a safe work environment by strictly adhering to established safety protocols and guidelines.
  • Performed troubleshooting and diagnosis on malfunctioning equipment.
  • Completed complex repairs quickly by leveraging strong diagnostic skills and attention to detail.
  • Demonstrated adaptability when faced with new challenges or technologies, enabling quick mastery of necessary skills.
  • Optimized system performance thorough testing and analysis.
  • Actively participated in continuous learning initiatives to stay updated on industry trends and advancements in technology.
  • Performed complex mechanical alignments and equipment calibration to meet quality standards.
  • Conducted root cause analyses for recurring technical issues, minimizing future disruptions.

Manager

Stonecrop Technologies
02.2013 - 08.2013
  • Ericsson Logistics
  • Set up new warehouse in Grapevine, TX for a Ericsson pre-kit operation
  • Trained all incoming employees on operations on the Antenna Assembly including: Programming/Troubleshooting RET controllers
  • Proper Assembly of Antennas
  • Photos and closeout documentation
  • Oversaw day to day activities on the floor
  • Assisted market lead
  • Communicated issues from the floor to the rest of the management team
  • Helped with retraining with any change of operations.
  • Accomplished multiple tasks within established timeframes.
  • Enhanced customer satisfaction by resolving disputes promptly, maintaining open lines of communication, and ensuring high-quality service delivery.
  • Resolved staff member conflicts, actively listening to concerns and finding appropriate middle ground.

Network Integration Engineer

Stonecrop Technologies
05.2012 - 02.2013
  • Sprint Netvision Project Chicago
  • MMBS testing and ATP testing in the Chicago Market
  • Sprint Netvision Project Indiana
  • Copper Migration, Fiber Integrations, ATP testing, and Alarms Troubleshooting
  • Troubleshoot BBU as well as MMBS issues.
  • Established strong working relationships with clients through exceptional communication skills, fostering trust and collaboration.
  • Achieved successful project outcomes by maintaining accurate documentation and meeting strict deadlines.
  • Conducted rigorous quality assurance tests, identifying areas of improvement for product optimization.
  • Enhanced product performance by conducting thorough failure analysis and recommending improvements.
  • Interpreted blueprints and technical drawings to analyze upcoming projects.

Field Technician

Mt. Vernon. Net, Inc.
01.2012 - 05.2012
  • Worked as a field technician for a local Wireless ISP
  • Lines & Antennas work on towers throughout the network
  • Install and Troubleshoot Residential and Business internet
  • Proficient with Ubiquiti, Microtik, Canopy, and Motorola equipment.
  • Communicated with supervisor to report progress, discuss issues and seek guidance.
  • Kept detailed records of field measurements and data.
  • Minimized potential hazards through adherence to safety guidelines during all field assignments.
  • Prioritized and managed multiple tasks and projects to meet deadlines and enhance customer satisfaction.
  • Collaborated with other field technicians to resolve complex technical issues.
  • Identified potential problems and prevented equipment failure through performing regular equipment inspections.
  • Delivered high-quality work by diligently following standard operating procedures.
  • Supported team members in addressing challenging technical issues, sharing expertise and knowledge when needed.
  • Improved system performance by conducting regular maintenance and troubleshooting of equipment in the field.
  • Communicated with customers to provide updates, gather information and resolve issues.
  • Enhanced customer satisfaction by providing efficient and timely technical support for various issues.
  • Performed troubleshooting and diagnostics of malfunctioning equipment, machinery, tools, and components.

Tiger Team

Design Build Technologies
10.2011 - 01.2012
  • AT&T Tiger Team
  • Troubleshoot 3rd and 4th carrier issues with AT&T performance bridge
  • Change out coax jumpers, TMA's, re-terminate coax mainlines, and troubleshoot radio issues
  • Also helped with L&A work on a E911 project in Mississippi doing analog to digital conversions.

Tower Hand

4G Communications
09.2011 - 10.2011
  • U.S
  • Cellular Project
  • Lines & Antennas
  • Tower hand for 4G communications installing LTE in Central and Southern Maine
  • Short term project.

Tower Hand / Microwave Technician

Stonecrop Technologies
01.2010 - 09.2011
  • Clearwire (Clear) 4G back haul deployment
  • Microwave Alignment and Troubleshooting for the Clearwire (Clear) deployment
  • Worked in Chicago, St
  • Louis, Cincinnati, Columbus, and Cleveland markets
  • Became proficient in multiple microwave systems including Dragonwave, Ceragon, Motorola, Redline.
  • Performed troubleshooting and repair.
  • Coordinated maintenance and responded to repair calls for assigned sites.
  • Performed routine maintenance on equipment.
  • Built and installed sites per customer specs and maintained safe work environment daily
  • Built extensive knowledge working with testers and diagnostic tools.
  • Conducted comprehensive site audits to verify proper installation techniques and adherence to quality standards, ensuring long-term reliability of network infrastructure.
  • Contributed to a safer work environment through regular participation in safety meetings and trainings related to tower climbing best practices.
  • Maximized safety standards by conducting thorough pre-climb inspections and identifying potential hazards.
  • Optimized resource utilization by cross-training as a backup climber or technician when needed for additional support on complex projects.
  • Reduced downtime during repairs by swiftly diagnosing and troubleshooting issues with cellular transmission equipment.
  • Increased network reliability by performing routine maintenance checks on all tower systems, including grounding systems and structural supports.

Entry Level Tower Hand

Slingshot Wireless
01.2009 - 05.2009
  • Deployed wireless internet systems in rural areas
  • Learned proper entry level tower skills from a skilled crew
  • Installed and Aligned Microwave back haul system.
  • Performed troubleshooting and repair.
  • Coordinated maintenance and responded to repair calls for assigned sites.
  • Performed routine maintenance on equipment.
  • Built and installed sites per customer specs and maintained safe work environment daily
  • Drove truck and trailer to and from job sites, up to 5 hour drives.
  • Built extensive knowledge working with testers and diagnostic tools.
  • Demonstrated adaptability in diverse work environments by completing tasks under challenging weather conditions, including extreme temperatures and high winds.
  • Increased network reliability by performing routine maintenance checks on all tower systems, including grounding systems and structural supports.
  • Maximized safety standards by conducting thorough pre-climb inspections and identifying potential hazards.
  • Maintained high-quality service results by strictly following manufacturer guidelines during the installation process of new equipment components.

Education

High School Diploma, General -

Mount Vernon Township Highschool
01.2004

Skills

  • Comtrain Certified Climber
  • Towers
  • Wireless Broadband
  • WWAN
  • Anritsu
  • Computer Hardware
  • Workplace Safety
  • Mechanical Assembly
  • Electrical Wiring
  • Troubleshooting skills
  • Assembly Processes
  • Safety awareness
  • Problem-Solving
  • Excellent Communication

Certification

Tower Climber - Comtrain

Timeline

Assembly Specialist

Toyota Motor Manufacturing Indiana
12.2023 - Current

IT Specialist

Walgreens
08.2022 - 12.2023

Operations Manager

The Diamond Bonsai
03.2018 - 05.2022

Facilities Coordinator

Stonecrop Technologies
04.2017 - 03.2018

RAN Comissioning Engineer

Stonecrop Technologies
04.2016 - 04.2017

Parts Engineer

Stonecrop Technologies
07.2014 - 03.2018

New Projects Manager

Stonecrop Technologies
07.2014 - 10.2016

Integration Engineer

Samsung Telecommunications America
12.2013 - 07.2014

Logistics Manager

Stonecrop Technologies
11.2013 - 12.2013

Microwave Technician

Stonecrop Technologies
08.2013 - 11.2013

Manager

Stonecrop Technologies
02.2013 - 08.2013

Network Integration Engineer

Stonecrop Technologies
05.2012 - 02.2013

Field Technician

Mt. Vernon. Net, Inc.
01.2012 - 05.2012

Tiger Team

Design Build Technologies
10.2011 - 01.2012

Tower Hand

4G Communications
09.2011 - 10.2011

Tower Hand / Microwave Technician

Stonecrop Technologies
01.2010 - 09.2011

Entry Level Tower Hand

Slingshot Wireless
01.2009 - 05.2009

High School Diploma, General -

Mount Vernon Township Highschool
Jason McClintock