Summary
Overview
Work History
Education
Skills
Timeline
Generic

JASON MCMILLIN

Louisville,KY

Summary

Have been in the fabrication and welding field for over 20 years. Have roughly 9 years of supervision experience in various of settings such as fabrication shops or powerplant shut downs to new construction of massive mega projects.

Overview

21
21
years of professional experience

Work History

Piping Supervisor

Spirit Construction
Fort Smith, AR
06.2024 - 01.2026

Started with spirit as a piping foreman building new construction paper mills. Was promoted to general foreman after completing the first project with them. Ran a shutdown at a paper mill in Brunswick Ga for them . Relocated to Ohio to do another paper mill new construction with them . Running multiple crews in various stages of construction up to commissioning of the project.

  • Analyzed drawings and specifications to ensure accurate installation of piping systems.
  • Developed reports detailing completed tasks, outstanding work, and potential project delays.
  • Resolved any discrepancies between field conditions versus engineering documents.
  • Conducted regular safety meetings with crew members to discuss job hazards and safe work practices.
  • Investigated any nonconforming materials or products discovered on-site.
  • Maintained inventory of necessary materials needed for successful completion of the projects.
  • Assisted in resolving conflicts between subcontractors regarding the scope of work or schedule issues.
  • Communicated project updates to stakeholders and ensured alignment with the timelines.
  • Collaborated with engineers to resolve design and installation issues efficiently.
  • Inspected completed installations for quality assurance and compliance with specifications.
  • Trained new staff on proper equipment handling and safety protocols.
  • Coordinated workflow and schedules for piping crew to optimize project timelines.
  • Coordinated with teams to ensure compliance with safety regulations and standards.
  • Supervised installation of piping systems in industrial construction projects.

Piping Supervisior

Bronco Industrial
02.2024 - 09.2024
  • Built a new construction expansion in the Alcoa aluminum facility for Kaiser materials.
  • Managed several crews with many employees at this facility.
  • Mainly all SS piping for utility lines and services.

Pipefitter Journeyman/ Qc

Turner Industries
Lake Charles, LA
07.2019 - 03.2020
  • Started as a journeyman pipefitter that turned into a quality control position with turner and eventually their specialty welding services department at the sasol location building a petrochemical plant.

Piping Foreman

Performance Contractors
Lake Charles Historic District, LA
07.2017 - 05.2019
  • Built 2 petrochemical plants in Lake Charles including sasol and Phillips 66 before switching companies in the same area.
  • Managed multiple crews throughout the project as we completed several units.

Welder Foreman

Full Metal Solutions
Jeffersonville, IN
07.2016 - 06.2017
  • Led welding and quality control department, ensuring high standards in production processes.
  • Manufactured various of products from steel mills to barge builders and aluminum extrusion plants.

Pipefitter Journeyman

Performance Contractors
Sioux City, IA
03.2015 - 06.2016
  • Built and assembled a very large petrochemical plant for cf industries.
  • Stainless piping, chrome as well as carbon steel.
  • Primarily built the boiler systems on this job.

Welder

Carman Industries
Jeffersonville, IN
10.2012 - 01.2015
  • Welding food grade stainless hoppers and various vibratory conveyors, vertical spiral material movers etc in all shapes and sizes up to 40 tons.
  • Mig, tig, Flux core in stainless carbon and a mix of both.
  • I was promoted to shop supervisor over welding and fabrication dept roughly 1 year after hire.

Welder Fabricator

Fiba Cryogenics
10.2006 - 12.2011
  • Job performed - tig, mig, flux core welding assembling cryogenic tanks and pressure vessels, various types of containers and mobile units, all built from stock metal in house with complex piping and plumbing all asme and x-rayed or dye checked.

Welder Assembler

Fontaine Truck Equipment
02.2006 - 09.2006
  • Job performed - mig and tig welding, assembling various types of fleet and commercial vehicles.

Welder Assembler

Manning Truck Equipment
07.2005 - 12.2005
  • Job performed - stick and mig welding, assembling dump trucks and many various types of commercial vehicles, complex wiring and assembly process performed daily.

Welder/Fitter Foreman

MXD Process
Jeffersonville, USA
  • Fitted and welded stainless steel tanks, hoppers, and mixers to ensure structural integrity and compliance with ASME code.
  • Performed ASME code work on food grade, full polish materials in various sizes and grades to uphold safety and quality standards.
  • Managed team of welders and fabricators to meet project specifications and deadlines.
  • Oversaw daily operations of fabrication department.

Education

Journeyman - Pipe Fitting

NCCER
06.2017 - 06.2017

Doss High School
Louisville , Ky

Skills

  • Piping installation
  • Installation oversight
  • Blueprint interpretation
  • Safety compliance
  • Project management
  • Team leadership
  • Worker supervision
  • Problem solving
  • Effective communication

Timeline

Piping Supervisor

Spirit Construction
06.2024 - 01.2026

Piping Supervisior

Bronco Industrial
02.2024 - 09.2024

Pipefitter Journeyman/ Qc

Turner Industries
07.2019 - 03.2020

Piping Foreman

Performance Contractors
07.2017 - 05.2019

Journeyman - Pipe Fitting

NCCER
06.2017 - 06.2017

Welder Foreman

Full Metal Solutions
07.2016 - 06.2017

Pipefitter Journeyman

Performance Contractors
03.2015 - 06.2016

Welder

Carman Industries
10.2012 - 01.2015

Welder Fabricator

Fiba Cryogenics
10.2006 - 12.2011

Welder Assembler

Fontaine Truck Equipment
02.2006 - 09.2006

Welder Assembler

Manning Truck Equipment
07.2005 - 12.2005

Welder/Fitter Foreman

MXD Process

Doss High School
JASON MCMILLIN