Results-driven Project Superintendent with expertise in project management, safety compliance, and team coordination. Proven track record in overseeing complex projects, optimizing workflows, and achieving quality control standards. 20 years experience in all types of DSA projects from mod's to ground ups and retrofits. Lean construction tactics and fast passed summer burs as well. Ie, 7 week 8.5 mill current project we are completing at Cumberland Elementary School. Complete roof top AC units replacement. All new interior and exterior lighting, flooring and all buildings exterior paint. Ground ups for Lynbrook HS and Fremont union School district office maintenance and operations buildings. are the two previous completed projects.
Typical tasks
1 RFP proposal prep Includes site investigation Logistics plan Site safety, manpower and challenges lists to PM & PE
2 Proposal interviews with district / Client for upcoming project
3 Bluebeam constructability session and comments pre district proposal Typically on 50% or 75% CD’s Sometimes includes BIM and CAD plan coordination with design and project team
4 List out Pre-Bid RFI’s to PM and design team
5 Build bid and construction draft schedules Drafts built in MS Project Then converted into P-6 Conversion typically done by PM Review durations and constraints list
6 Build site safety and orientation plan with Safety Dept
7 Build detailed construction schedule
8 100% DSA Approved drawings constructability review and comments
9 Participate in Scopes for each trade Typically, with PM’s and PE’s
10 Post bid interviews participation Q&A
11 Submittal reviews for all trades
000
12 Typical Daily project tasks
1 3:30 to 4am on site to get through project emails and list out the day’s tasks for self-performed crews as well as subs
2 Stretch and Flex with crew
3 CAD review on Civil, architectural and structural
4 Create / draft RFI’s, add sketches and options of solutions with in the RFI’s to keep production moving forward and schedule on task
5 Assist Foreman with layout Teach how to pull layout from CAD file with self-performed team Software used is True view, Navisworks loaded on my laptop by IT department
6 Staking and utility coordination
7 Scope reviews with trade foreman 1stday on site
8 Daily Schedule review and weekly update with PM, PE & Foreman
9 Production review with subs Usually during foreman’s meetings
10 Start daily project journal and crew time entry on CMiC
11 Weekly site safety inspections in Hammer-tech
12 RFI response and reviews Post RFI’s on hard copy red lines
13 Build and edit Foreman’s meeting agenda
14 Tail Gate safety meeting
15 Create and sketch RFI’s with PE or PM as project moves
16 Conduct weekly foreman’s meetings
17 Inspection requests with IOR Stand same inspections
18 Assist project team with change order reviews and negotiations' set up