Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

Javier Chavez

Los Angeles,CA

Summary

Dedicated and adaptable professional with a proactive attitude and the ability to learn quickly. Strong work ethic and effective communication skills. Eager to contribute to a dynamic team and support organizational goals.

Overview

5
5
years of professional experience
1
1
Certification

Work History

Electrician

Mountain Power Inc.
Mojave , CA
04.2024 - 09.2024

-Fabricated and installed ridgid conduit sizes 3/4" - 3" for new power and control circuits, from new MCC to field disconnects.

-Pulled power and control wires through conduit from sizes #12 AWG-750 kcmil.

-Terminations of power cables at field disconnects and MCC breakers.

-Terminations of control cables at PLC and control panels.

-Install lights and change ballasts for existing lights throughout the facility; troubleshoot and repair as necessary.

-Used testing equipment like a multimeter and an insulation tester to troubleshoot motor control circuits and power cables for motors.

-Read wiring schematics and diagrams to troubleshoot and wire new power and control circuits.

-Used man lift and scissor lift to work at heights for new conduit installations.

-Used safe work practices when working on 120v control and 480v power circuits.

-Installed new 480v distribution panel for heat trace circuits

-Installed new differential pressure transmitters, helped install tubing and calibrate transmitters

-Inspected electrical components to identify hazards, defects, or potential repairs in compliance with codes.

-Reviewed drawings to determine electrical component and wiring locations.

Electrician

PTR
El Segundo , CA
03.2024 - 04.2024

-Removed existing corroded power panels and replaced with new stainless steel panels throughout facility

-Disconnected wiring inside old panels and rewired circuits onto new panel breakers

-Installed and wired new transformer for trailers

-Assisted in house electricians with disconnecting old mov wiring and rewired new movs according to new wiring diagrams

-Removed iso phase and neutral bussing inside generator to perform testing

-Removed brushes from generator, cleaned and replaced worn parts as necessary

-Used loto procedures to safely work on all electrical components and equipment for entire duration of shutdown

-Disconnected and reconnected motor leads for fin fans and wired up vibration switches

-Cleaned and inspected transformers for defects and worn parts

Electrician

Matrix Services
Newberry Springs , CA
01.2023 - 06.2023

-Read p&ids to locate exact instrument locations

-Fabricate and install supports and cable tray to motors, start stops and instruments

-Pulled cables from MCC to motors for power and controls

-Pulled cables from PLC to field instruments

-Installed and wired new led lights through out facility

-Wired up lighting contactor for all new lights

-Used insulation tester on motor leads and 480v power cables

-Documented information for QC paperwork

-Wired up motors, panels, field instruments and PLC according to wiring diagrams and schematics

-Troubleshoot motor controls for overload trips and other issues

Electrician

Irish Communications
Tehachapi , CA
05.2022 - 08.2022

-Bent and installed EMT and Rigid conduit sizes 3/4" to 2" using a hand bender, an electric bender, and a Chicago bender.

-Installed junction boxes and pull boxes for conduits and new camera systems

-Used hammer drill, anchors, and hand tools to support conduit and boxes

-Pulled cat 6 cables and fiber cables through conduit for new cameras

Electrician

Phillips 66
Wilmington , CA
05.2019 - 05.2022

-Performed preventative maintenance on motors and ups batteries

-Changed oil on motors 480v- 4160v

-Tested insulation on motor leads and power cables

-Document and record test results

-Change lights and fixtures replace and repair lights as necessary

-Troubleshoot motor control circuits and lighting circuits using electrical schematics.

-Test run emergency generators on a monthly basis, inspect for loose or worn parts

-Perform trip testing on vibration switches on cooling fan motors, repair replace as necessary

-Disconnect and reconnect motor leads for electrical and mechanical maintenance

-Open and close breakers and fuses, 480v-4160v.

-Used loto procedures and proper PPE to safely repair and replace electrical components

-Used wiring diagrams and schematics to properly troubleshoot motor control and power circuits

-Calibrate instruments using Haart communicator

-Bent and installed tubing for various instruments

-Use of testing equipment to properly diagnose and troubleshoot electrical circuits

Education

GED -

Huntington Park High School
Huntington Park, CA
06-2005

Skills

-Field installations

-Diagnostic Testing

-Electrical Repairs

-New Construction

-NCCER Certified

-Electrical Troubleshooting

-Safety procedures and regulations

-Electrical maintenance

-Bilingual

-Electrical drawings, schematics, single line diagrams

-Power and control wiring

-PLC wiring

-Instrumentation calibrations

-Tubing bending and installations

-Conduit bending and installations

-Transformer wiring

-MOV wiring

-Lighting circuits

Languages

English
Professional
Spanish
Professional

Certification

-NCCER Industrial Electrician

Timeline

Electrician

Mountain Power Inc.
04.2024 - 09.2024

Electrician

PTR
03.2024 - 04.2024

Electrician

Matrix Services
01.2023 - 06.2023

Electrician

Irish Communications
05.2022 - 08.2022

Electrician

Phillips 66
05.2019 - 05.2022

-NCCER Industrial Electrician

GED -

Huntington Park High School
Javier Chavez