Dedicated and adaptable professional with a proactive attitude and the ability to learn quickly. Strong work ethic and effective communication skills. Eager to contribute to a dynamic team and support organizational goals.
-Fabricated and installed ridgid conduit sizes 3/4" - 3" for new power and control circuits, from new MCC to field disconnects.
-Pulled power and control wires through conduit from sizes #12 AWG-750 kcmil.
-Terminations of power cables at field disconnects and MCC breakers.
-Terminations of control cables at PLC and control panels.
-Install lights and change ballasts for existing lights throughout the facility; troubleshoot and repair as necessary.
-Used testing equipment like a multimeter and an insulation tester to troubleshoot motor control circuits and power cables for motors.
-Read wiring schematics and diagrams to troubleshoot and wire new power and control circuits.
-Used man lift and scissor lift to work at heights for new conduit installations.
-Used safe work practices when working on 120v control and 480v power circuits.
-Installed new 480v distribution panel for heat trace circuits
-Installed new differential pressure transmitters, helped install tubing and calibrate transmitters
-Inspected electrical components to identify hazards, defects, or potential repairs in compliance with codes.
-Reviewed drawings to determine electrical component and wiring locations.
-Removed existing corroded power panels and replaced with new stainless steel panels throughout facility
-Disconnected wiring inside old panels and rewired circuits onto new panel breakers
-Installed and wired new transformer for trailers
-Assisted in house electricians with disconnecting old mov wiring and rewired new movs according to new wiring diagrams
-Removed iso phase and neutral bussing inside generator to perform testing
-Removed brushes from generator, cleaned and replaced worn parts as necessary
-Used loto procedures to safely work on all electrical components and equipment for entire duration of shutdown
-Disconnected and reconnected motor leads for fin fans and wired up vibration switches
-Cleaned and inspected transformers for defects and worn parts
-Read p&ids to locate exact instrument locations
-Fabricate and install supports and cable tray to motors, start stops and instruments
-Pulled cables from MCC to motors for power and controls
-Pulled cables from PLC to field instruments
-Installed and wired new led lights through out facility
-Wired up lighting contactor for all new lights
-Used insulation tester on motor leads and 480v power cables
-Documented information for QC paperwork
-Wired up motors, panels, field instruments and PLC according to wiring diagrams and schematics
-Troubleshoot motor controls for overload trips and other issues
-Bent and installed EMT and Rigid conduit sizes 3/4" to 2" using a hand bender, an electric bender, and a Chicago bender.
-Installed junction boxes and pull boxes for conduits and new camera systems
-Used hammer drill, anchors, and hand tools to support conduit and boxes
-Pulled cat 6 cables and fiber cables through conduit for new cameras
-Performed preventative maintenance on motors and ups batteries
-Changed oil on motors 480v- 4160v
-Tested insulation on motor leads and power cables
-Document and record test results
-Change lights and fixtures replace and repair lights as necessary
-Troubleshoot motor control circuits and lighting circuits using electrical schematics.
-Test run emergency generators on a monthly basis, inspect for loose or worn parts
-Perform trip testing on vibration switches on cooling fan motors, repair replace as necessary
-Disconnect and reconnect motor leads for electrical and mechanical maintenance
-Open and close breakers and fuses, 480v-4160v.
-Used loto procedures and proper PPE to safely repair and replace electrical components
-Used wiring diagrams and schematics to properly troubleshoot motor control and power circuits
-Calibrate instruments using Haart communicator
-Bent and installed tubing for various instruments
-Use of testing equipment to properly diagnose and troubleshoot electrical circuits
-Field installations
-Diagnostic Testing
-Electrical Repairs
-New Construction
-NCCER Certified
-Electrical Troubleshooting
-Safety procedures and regulations
-Electrical maintenance
-Bilingual
-Electrical drawings, schematics, single line diagrams
-Power and control wiring
-PLC wiring
-Instrumentation calibrations
-Tubing bending and installations
-Conduit bending and installations
-Transformer wiring
-MOV wiring
-Lighting circuits
-NCCER Industrial Electrician
-NCCER Industrial Electrician