Dynamic asbestos removal specialist with a proven track record at JJ&S Asbestos Remover. Adept at ensuring safety compliance while efficiently managing time and resources. Recognized for strong teamwork and problem-solving skills, consistently delivering results in high-pressure environments. Committed to maintaining organized workspaces and adhering to industry standards.
Work History
Asbestos Remover
5 Months
JJ&S Asbestos Remover | 07.2025 - 12.2025
Self-motivated, with a strong sense of personal responsibility.
Worked effectively in fast-paced environments.
Skilled at working independently and collaboratively in a team environment.
Proven ability to learn quickly and adapt to new situations.
Managed time efficiently in order to complete all tasks within deadlines.
Asbestos Worker
5 Months
AMPCo | 01.2025 - 06.2025
Removed asbestos-containing materials following containment and abatement procedures.
Set up negative air units, barriers, and decontamination equipment for safe work zones.
Inspected work areas for compliance with respirator, PPE, and exposure-control requirements.
Mixed, applied, and sealed asbestos materials using approved tools and safety protocols.
General Laborer
1 Year 5 Months
JTR Construction | 07.2023 - 12.2024
Assisted with site cleanup, debris removal, and material staging to maintain organized work areas.
Loaded and unloaded construction materials while following safe lifting and handling procedures.
Prepared tools and equipment for daily tasks, supporting efficient crew operations.
Followed safety guidelines and wore required PPE to reduce jobsite hazards.
Demolition Laborer
1 Year 8 Months
Swinterton | 04.2023 - 12.2024
Removed debris, concrete, and framing materials from active demolition sites
Operated hand tools and demolition equipment to dismantle structures safely
Set up barricades, signage, and dust-control measures around work zones
Sorted recyclable materials and disposed waste according to site procedures
Hardware Framer
6 Years 3 Months
Trademark Construction | 04.2007 - 07.2013
Installed wall, floor, and roof framing components according to blueprints and specifications.
Measured and cut lumber using saws, levels, and framing tools for accurate fit.
Assembled framing structures while maintaining alignment, plumb, and code compliance.
Secured sheathing, joists, and studs using nails, screws, and fastening equipment.