Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Javier Reyna

Glendora,CA

Summary

Dynamic and results-driven professional with extensive experience at Western States Contracting, excelling in team leadership and safety compliance. Proven ability to enhance project efficiency through effective communication and quality assurance, while operating heavy machinery and implementing process improvements that reduced downtime by 20%. Committed to fostering a collaborative work environment.

Overview

16
16
years of professional experience
1
1
Certification

Work History

Laborer Operator

Nation Electric
Covina, CA
06.2023 - 03.2026
  • Operated heavy machinery for construction and maintenance tasks efficiently.
  • Assisted team in executing electrical installations and repairs safely.
  • Maintained tools and equipment, ensuring readiness for daily operations.
  • Followed safety protocols to minimize risks and enhance workplace safety.
  • Collaborated with crew members to complete projects within deadlines.
  • Conducted routine inspections of work sites for quality assurance purposes.
  • Implemented process improvements that streamlined workflow and boosted productivity.
  • Supported team members by sharing knowledge of proper tool usage, safety procedures, and other essential skills for job success.
  • Assisted in the successful completion of various construction projects, contributing to a safe and productive work environment.
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Kept machinery in proper working order by repairing and replacing malfunctioning parts.
  • Contributed to timely project completions with effective collaboration among team members and efficient task execution.
  • Promoted a positive working environment by fostering open communication between team members and demonstrating strong leadership skills when necessary.
  • Performed frequent heavy lifting up to Number pounds, climbing and working in confined spaces to achieve company goals.
  • Safeguarded company assets with strict adherence to security protocols while operating heavy machinery or handling sensitive materials.
  • Interpreted blueprints and executed plans to complete construction projects to specifications.
  • Enhanced project efficiency by consistently completing tasks within established deadlines and meeting quality standards.
  • Operated industrial equipment and hand tools for company in Type industry.
  • Reduced equipment downtime by performing regular maintenance and troubleshooting issues as they arose.
  • Implemented innovative solutions for complex problems encountered on the job site, streamlining processes for increased productivity.
  • Improved worksite organization through meticulous attention to detail in material management, storage, and disposal.
  • Consistently met or exceeded production goals due to strong technical aptitude combined with an unwavering commitment to operational excellence.
  • Adhered to heavy equipment safety and operation protocols, resulting in minimal complaints or incidents.
  • Strictly adhered to company safety procedures, noticeably decreasing job site accidents.
  • Increased overall project safety by diligently adhering to established guidelines and promptly addressing potential hazards.
  • Delivered reliable customer service by addressing client inquiries professionally and resolving issues promptly whenever possible.
  • Demonstrated flexibility and adaptability by quickly learning new tasks or technologies as needed to keep pace with evolving industry requirements.
  • Maximized equipment lifespan through regular preventative maintenance, ensuring optimal performance during operation.
  • Streamlined daily operations with expert time management skills that allowed for more efficient use of resources such as labor hours and equipment availability.
  • Remove debris and leveled ground to prepare job sites for construction projects.
  • Operated machining equipment safely with team of operators.
  • Performed thorough pre-shift and post-shift inspections and accurately completed equipment logs and reports.
  • Met project demands consistently through careful and consistent operation of heavy equipment.
  • Moved equipment between job locations using truck and trailer.
  • Assisted team in setting up and dismantling equipment and tools to use for construction.
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials onto trucks and trailers.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Cleaned and maintained tools, equipment and worksites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Assisted in digging, trenching and backfilling trenches and foundations.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Mixed and poured concrete for variety of projects.
  • Provided labor support to carpenters, masons and other skilled trades.

Foreman

Western States Contracting
Las Vegas, NV
02.2020 - 06.2023
  • Supervised daily operations to ensure compliance with safety regulations and project specifications.
  • Coordinated task assignments among crew members to optimize productivity and workflow efficiency.
  • Implemented quality control measures, improving project outcomes and minimizing rework instances.
  • Trained new employees on best practices and equipment usage for enhanced team performance.
  • Conducted site inspections to assess progress, ensuring adherence to timelines and standards.
  • Developed and maintained project schedules, facilitating timely completion of construction tasks.
  • Collaborated with project managers to address challenges, providing solutions that met client expectations.
  • Led safety meetings, fostering a culture of safety awareness and risk mitigation among team members.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
  • Raised overall crew proficiency with ongoing skill development initiatives targeting areas identified for improvement.
  • Successfully mitigated risks associated with complex projects by conducting thorough risk assessments and implementing appropriate contingency plans.
  • Managed equipment maintenance schedules to minimize downtime due to mechanical failure or repairs.
  • Implemented efficient work processes to boost overall productivity while reducing costs.
  • Optimized resource utilization for cost savings, carefully monitoring material usage and labor allocations.
  • Facilitated seamless handovers between shifts by maintaining clear documentation of completed tasks and outstanding items requiring attention.
  • Developed robust quality control system, significantly reducing rework and customer complaints.
  • Achieved deadlines consistently, planning resources effectively and adjusting priorities as needed.
  • Ensured compliance with all regulatory requirements, conducting thorough audits and making necessary adjustments.
  • Improved client satisfaction with meticulous oversight of project requirements and quality standards.
  • Optimized equipment usage, scheduling regular maintenance and updates to prevent downtime.
  • Reduced material waste significantly, implementing stringent inventory management and usage tracking systems.
  • Elevated safety standards, conducting regular training sessions and safety audits.
  • Strengthened vendor relationships, ensuring consistent supply and quality of materials.
  • Ensured project milestones were met, overseeing scheduling and execution of construction phases.
  • Enhanced team skills with targeted training programs, addressing gaps and fostering professional development.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Supported construction and extraction workers to facilitate timely completion of projects.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Investigated and reported on accidents, injuries and near-miss incidents.

Pipefitter

NPL
Las Vegas, NV
08.2018 - 02.2020
  • Assembled and installed piping systems according to specifications and safety standards.
  • Interpreted blueprints and technical drawings to ensure accurate pipe placement and fittings.
  • Conducted regular inspections of piping systems for leaks, ensuring operational integrity.
  • Collaborated with project teams to streamline installation processes, enhancing workflow efficiency.
  • Implemented process improvements that reduced material waste during installations and repairs.
  • Oversaw compliance with safety regulations, fostering a culture of workplace safety among team members.
  • Coordinated with subcontractors to facilitate timely completion of projects while maintaining quality standards.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Threaded pipes using piping machines.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Facilitated smooth project execution by interpreting isometric drawings for accurate installation or modification of piping systems.
  • Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Demonstrated versatility in skillset by working with various types of pipes such as PVC, copper, steel, cast iron among others.
  • Utilized specialized tools and equipment for precise pipefitting processes, ensuring optimal results for each project.
  • Replaced faulty parts and repaired structural damages to pipes and related components.
  • Contributed to successful project outcomes by working closely with plumbers, steamfitters, and welders on diverse job sites.
  • Optimized material usage by accurately measuring and calculating required materials for each project, minimizing waste.
  • Supported fellow team members in their tasks, fostering a collaborative work environment that prioritized both safety and efficiency.
  • Maintained high-quality standards through consistent attention to detail while fitting pipes according to building code requirements.
  • Consistently met client expectations through timely completion of projects while maintaining high levels of quality control checks throughout the process.
  • Reduced project completion time by interpreting blueprints, sketches, and specifications to accurately plan pipefitting installations.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Connected piping systems to water heaters, boilers, pumps and auxillary equipment to complete installations.
  • Inspected and tested existing pipe systems to identify system defects and malfunctions.
  • Continuously expanded knowledge of industry best practices through participation in professional development courses and workshops.
  • Performed preventive maintenance to clean, adjust and lubricate piping systems and parts.
  • Collaborated effectively with supervisors to ensure that all necessary permits were obtained before commencing work on new projects.
  • Maximized system longevity through routine preventative maintenance checks on existing piping infrastructure within various industrial settings.
  • Enhanced team performance with strong leadership in collaborative projects, setting clear goals and expectations.
  • Reduced material waste by accurately measuring and planning pipe routes, contributing to cost savings.
  • Streamlined material procurement process, reducing downtime and boosting productivity on critical tasks.
  • Collaborated with engineers to design piping systems that met project specifications and budget constraints, delivering high-quality results.
  • Increased system longevity with selection and installation of appropriate pipe supports and insulation materials.
  • Facilitated smoother project transitions by maintaining detailed documentation of piping layouts and modifications.
  • Enhanced safety on job sites by strictly adhering to OSHA regulations and conducting regular safety audits.
  • Delivered custom fabrication projects within tight deadlines, utilizing precise cutting and welding techniques to meet specific requirements.
  • Implemented innovative pipe bending methods to preserve pipe strength and functionality, extending system lifespan.
  • Cut and threaded pipe to specifications, ensuring seamless integration into existing systems for increased efficiency.
  • Achieved zero leaks on completed installations, meticulously testing and adjusting systems as needed.
  • Conducted comprehensive pressure tests to ensure integrity of piping systems, enhancing system reliability.
  • Measured, threaded, and cut materials to correct angles.
  • Planned pipe system layout, installation and repair according to specifications.
  • Filled pipe systems with water and air to determine location of leaks.
  • Used clamps and brackets to attach pipes to walls, structures, and fixtures.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.
  • Reviewed blueprints and project specifications to determine correct plumbing solutions.
  • Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Tested and operated hydraulic and pneumatic equipment for heating and cooling systems.
  • Assisted with repairs to steam, drainage, and sewer lines.
  • Operated ground microphones and listening discs to locate hidden water line leaks.

Laborer

Arizona Pipeline
Las Vegas, NV
05.2016 - 07.2018
  • Operated heavy machinery to assist in pipeline construction and maintenance.
  • Collaborated with team members to ensure adherence to safety protocols on job sites.
  • Conducted routine inspections on equipment, identifying maintenance needs proactively.
  • Assisted in trenching and backfilling operations, ensuring proper alignment of pipelines.

Landscaper

Escalera Landscape and Maintenance
Las Vegas, NV
10.2013 - 04.2016
  • Operated landscaping equipment to maintain and enhance outdoor spaces.
  • Executed landscape design plans, ensuring aesthetic appeal and functionality.
  • Trained new staff on safety protocols and efficient landscaping techniques.
  • Supervised team members to optimize workflow and project completion.
  • Developed strategies for sustainable maintenance practices, reducing resource waste.
  • Resolved client concerns promptly, fostering strong relationships and repeat business.
  • Maintained grounds by trimming, weeding, and general clean-up.
  • Removed weeds, hazards, and debris from common pathways to improve usability.
  • Used trimmers and chainsaws for grounds maintenance, brush clearing, and tree removal and thinning.
  • Enhanced customer satisfaction by providing high-quality landscaping services and maintaining clear communication throughout the project.
  • Managed inventory of tools, equipment, and materials to ensure proper allocation of resources for each project.
  • Constructed hardscape elements like patios, walkways, retaining walls, outdoor kitchens, fire pits, water features for enhanced functionality of outdoor spaces.
  • Provided exceptional customer service during consultations to assess property needs accurately and recommend suitable landscaping solutions.
  • Optimized irrigation systems for water conservation efforts while maintaining healthy lawns and gardens.
  • Assisted clients in selecting appropriate plants based on climate conditions, soil types, and desired aesthetics.
  • Utilized power tools and landscaping machines to maintain outdoor areas.
  • Removed tree stumps, roots and debris for cohesive landscape appearance.
  • Maintained gardening tools by replacing blades and fluids.
  • Assisted with irrigation system maintenance and repair.
  • Developed and implemented strategies for water conservation.

Technician

Premier Pest Control
Las Vegas, NV
07.2010 - 10.2013
  • Conducted thorough inspections to identify pest issues and recommend appropriate treatment solutions.
  • Applied various pest control methods, ensuring compliance with safety regulations and environmental standards.
  • Maintained accurate records of service calls, treatments performed, and customer feedback for continuous improvement.
  • Trained junior technicians on best practices in pest identification and treatment techniques to enhance team performance.
  • Developed and implemented effective pest management strategies tailored to individual client needs, improving satisfaction rates.
  • Collaborated with clients to educate them about preventative measures, fostering long-term relationships and trust.
  • Monitored inventory levels of pest control products, ensuring timely restocking to minimize service disruptions.
  • Analyzed service data trends to identify opportunities for process improvements and increased operational efficiency.
  • Maintained a safe work environment by strictly adhering to established safety protocols and guidelines.
  • Performed troubleshooting and diagnosis on malfunctioning equipment.
  • Completed complex repairs quickly by leveraging strong diagnostic skills and attention to detail.
  • Demonstrated adaptability when faced with new challenges or technologies, enabling quick mastery of necessary skills.
  • Optimized system performance thorough testing and analysis.
  • Actively participated in continuous learning initiatives to stay updated on industry trends and advancements in technology.
  • Conducted root cause analyses for recurring technical issues, minimizing future disruptions.
  • Elevated data security, implementing robust cybersecurity measures across all systems.
  • Ensured reliable network connectivity, closely monitoring system performance and making adjustments as needed.
  • Streamlined inventory management, ensuring optimal levels of spare parts and materials at all times.
  • Supported project management teams with expert technical advice, contributing to successful project completions.
  • Enhanced safety protocols, conducting regular inspections and safety drills for technical team.
  • Improved system efficiency by implementing regular maintenance schedules for all technical equipment.
  • Increased equipment lifespan, performing preventive maintenance and timely repairs.
  • Conducted detailed diagnostics to identify issues, leading to decrease in system downtimes.
  • Reduced response times to technical issues, implementing prioritized troubleshooting protocol.
  • Enhanced team productivity with thorough training on new technologies and procedures.
  • Achieved significant energy savings by installing and maintaining energy-efficient systems.
  • Streamlined communication, introducing centralized platform for logging and tracking technical issues.
  • Facilitated seamless software upgrades, minimizing disruptions to daily operations.
  • Optimized operational workflows by integrating cutting-edge technology solutions.
  • Tested systems, noting issues and completing preventive maintenance.
  • Diagnosed and repaired problems with electrical and mechanical systems.
  • Tended to machines, troubleshot malfunctions and completed basic repairs to keep equipment fully functional and well-maintained.
  • Inspected, evaluated and calibrated electrical and mechanical systems and components.
  • Managed maintenance activities, supervised staff, and inspected equipment.
  • Researched and implemented new technologies and equipment.
  • Followed established procedures for inspection of belts, drives and motors, performing needed maintenance.
  • Spread out articles or materials and examined for holes, tears and other defects.
  • Patched holes, sewed tears and ripped seams or darned defects using needles and thread or sewing machines.
  • Completed preventive maintenance on machines to enhance production and maintain quality.

Education

High School Diploma -

Jhon Muir High School
Pasadena, CA
05.2003

Skills

  • Power tool usage
  • OSHA compliance
  • Materials handling
  • Equipment operations
  • Loading and unloading
  • Heavy equipment operation
  • Hand tool proficiency
  • Power tool use
  • Backfilling operations
  • Equipment operation
  • Excavation techniques
  • First aid training
  • Demolition work
  • Construction site safety
  • Quality assurance
  • Soil compaction
  • Team support
  • Concrete mixing
  • Traffic control
  • Hazardous materials handling
  • Form setting
  • Vehicle maintenance
  • Trench shoring
  • Safety control
  • Load securing
  • Teamwork and collaboration
  • Following directions
  • Decision-making
  • Construction background
  • Repair and maintenance
  • Effective communication skills
  • Safety compliance
  • Safe equipment operation
  • Machinery inspection
  • Front end loader operations
  • Clean driving record
  • Equipment inspection
  • Good judgement
  • Materials movement
  • Debris removal
  • Valid Driver's license
  • Heavy lifting
  • Daily vehicle inspections
  • Commercial construction experience
  • Team leadership
  • Equipment logs
  • Site prep
  • Loader operation
  • Road construction
  • Communicating job status
  • OSHA 10 certification
  • Preventive Maintenance
  • Backhoe operation
  • Compactor operation
  • Inclement working conditions
  • Loader controls
  • Boomtruck operation
  • Residential construction
  • OSHA certification
  • Bucket truck operation
  • Safety policies and procedures
  • Verbal and written communication
  • Team coordination
  • Blueprint reading
  • Safety inspections
  • Ditch digging

Certification

OSHA 30 , CPR certified, machine operator, gas pipe fitter certification for gas replacements and installation.

Languages

English
Native or Bilingual

Timeline

Laborer Operator

Nation Electric
06.2023 - 03.2026

Foreman

Western States Contracting
02.2020 - 06.2023

Pipefitter

NPL
08.2018 - 02.2020

Laborer

Arizona Pipeline
05.2016 - 07.2018

Landscaper

Escalera Landscape and Maintenance
10.2013 - 04.2016

Technician

Premier Pest Control
07.2010 - 10.2013

High School Diploma -

Jhon Muir High School