Summary
Overview
Work History
Education
Personal Information
Timeline
Generic
Jawed Alam

Jawed Alam

QA/QC Manager
Doha,Qatar

Summary

Verifying the implementation and operation of the quality assurance and control systems, by planning and conducting internal quality audits and inspection activities on head/corporate office and site offices. Verifying that the company quality policy, is fully understood, implemented, operated and maintained.

Overview

31
31
years of professional experience
7
7
years of post-secondary education

Work History

QA/QC Manager

Urbacon Contracting & Trading LLC
Doha, Baladiyat ad Dawhah
09.2019 - Current
  • Supervises the Quality Control functions/activities of a project or its parts, including Quality Control inspection schedules and the collection of Quality Records
  • Supports the Construction Manager in dealing with the Client for all the Quality matters
  • Assesses the implementation of the Quality Plan and Quality Control Plans on the site
  • Allocates Quality Control personnel to the various areas of site activity
  • Supervises inspections, reports and the documentation issued by inspectors, collect and file the required Quality Records
  • Evaluates the qualifications of third-party technicians with regard to the activities assigned
  • Evaluates the qualifications of inspection personnel
  • Supports the construction roles in the management and control of subcontractors
  • Supports and participate to all the internal/external audits
  • Coordinates the relevant Tracking Systems for correct identification of materials
  • Supervises the correct equipment calibration management activities
  • Supports the Operation and Non-Destructive Test-NDT qualification activities
  • Cooperates to issue the Construction Procedures (CP)
  • Cooperates with the Project Quality Engineer (PQE) to analyses of non-conformities
  • Supervises inspection of defect renewal and execution

Sr. QA/QC Engineer

INSHA Trading and contracting Co Doha Qatar
09.2017 - 08.2019
  • Raise the departmental RFI after the confirmation of ongoing activity from operation team and submit to consultants for next day inspection once inspection finished acknowledging to relevant operation about status
  • Raise the MIR once received the delivery note from store, confirm from approved material approval request, and submit to consultants for inspection, after the completion of inspection aware to concern operation member about status
  • Coordinate with 3rd party lab and consultants for witness of client representative during trial mixing of concrete and other material tests
  • Coordinate with 3rd party and consultants to be conduct the required field test at site prior to initiate the next activity
  • Prepare and maintain the concrete pouring records according to structure wise also prepare the cube crushing request form and send to lab
  • Receive the RFI from subcon review and submit to consultant for inspection once inspection finished informing to subcon about consultant comments for next activity
  • Once receive the SORs, NCRs from client, consultants follow up and close out with in specific time duration
  • Conduct the pre-start meeting prior to start the any activity on site, as Quality Toolbox meeting
  • Coordinate with operation team, subcon and brief the correct procedure/method to deliver the better-quality work and to avoid the wastage of materials
  • Verify and prepare the Method statement Inspection and Test Plan for the implementation during work to be maintain the quality
  • During the inspection once completed work came in observation as per not specification/standard then issue the SORs to relevant team
  • Keep updated files of inspection and logs to keep track with status of the activities
  • Conduct the internal audit with sub-contractors and submit report to QA/QC unit head
  • Besides of above once receive any queries related to project execution always ready to survive on specific time
  • For emergency inspection to keep up maintain the continued progress, on the base of delivery note offer to client to acquire the inspection and later raise the RFI for approval
  • Develop and maintain the RFI logs, FDT log, Concrete log and Asphalt log for application, installation, and materials as record that on the occasion it could be detailed to clarify the construction issues if occurred during handing over

Sr. QA/QC Engineer

Group 3 Trading and Contracting
01.2013 - 08.2017
  • Preparation for approval and implementation of the Quality Plan, Method Statements, ITPs
  • Raise the departmental IR after the confirmation of ongoing activity from operation team and submit to consultants for next day inspection once inspection finished acknowledging to relevant operation about status
  • Coordinate with 3rd party lab and consultants for witness of client representative during trial mixing of concrete and other material tests
  • Verification and Inspection of delivered materials as per Project Specs and approved material approval request, Co-ordination with Independent labs for conducting different test such as compression, tensile, soil and degree of compaction tests
  • Ensure that all materials and construction are in accordance with the requirements for the completeness accuracy and approved shop drawing
  • Prepare logs status of request for inspection, material submittal/approved, approved drawings and updates
  • Participate in weekly progress and QC Meetings, Supervision of Quality Inspectors for different Inspection activities
  • Get the approval of notice to pour from consultant and prepare the concrete pouring program, prior to concreting operation
  • Investigate consultant complains and non-conformance issues when occurred at site, share technical awareness regarding construction, modification, and structural repairs with construction personnel
  • At the edge of project completion prepared the final dossier with coordination of consultant and submitted for Baladiya visit and QCDD approval

Sr. QA/QC Engineer

National Construction Pvt Ltd.
05.2009 - 12.2012
  • Conformation of materials and equipment’s delivered at site as per client recommended vendor and specification, raise the protocol for the inspection and verification of materials, equipment’s by client prior to implementation in the project execution and maintain the record for billing
  • Make arrangement of samples and send to client recommended lab to be conducted the trial mix design for structural, non-structural concrete and basic required tests of steel and other construction materials, coordinate and cooperate to client for approved external provider for the bore hole and PLT, CPLT tests
  • Inform to client and cooperate during inspection of all various stages of civil works to be maintained the client developed quality standard for batter quality of work, follow up and get the counter sign with client on protocol after completion of each activity
  • On project completion prepare dossier for pre-guarantee (PG) test and handover

QA/QC Engineer

Granit Construction Co
03.2007 - 04.2009
  • Project materials quality inspections for compliance with GASCO Engineering Standards, prior to implement in the project execution
  • Raise request for inspection (RFI) to consultants 24 hours prior to execute the activities
  • Prepare the method statement, inspection test plan and submit for approval, maintain the master lists of approved documents included drawings, technical quarries, approved material approval request, PQP at the job site for better quality assurance
  • Solution of site instructions from client/consultants and coordination to client for the solution of issued technical quarries
  • Execute the NCR (non-conformance report) within 48 hours when occurred at site
  • End of project prepare the final dossier under guideline of QC manager and handover to consultant, client

QA/QC Engineer

TEKFEN
04.2004 - 02.2007
  • Raise material inspection request for compliance with Saudi Aramco Engineering Standards & Materials Specifications as per MMS system prior to install in the project execution, cooperate to store in charge for the staking of project material during unloading to avoid the contamination and damages
  • Coordinate with site engineers at different locations and raise the RFI to Project client representative a day before to execute the activity and next day during inspection cooperate to representative along to perform the quality to get the approval of raised RFI
  • Witness in-front of client representative once technician measure the slump and concrete temperature prior to start the pouring operation
  • Execute and close the SOR, NCR in 24 to 48 hours when takes place at job sit
  • Maintain the RFI in proper sequence for each activity and register the raised RFI in same sequence for better quality assurance
  • After completion of project prepare the final dossier under the direction of QC manager according to client/ project management team (PMT) suggestions to receive the project completion certificate

QA/QC Engineer

Saudi Aramco
12.2000 - 03.2004
  • Project materials quality inspections for compliance with Saudi Aramco Engineering Standards & Materials Specifications as per MMS system prior to install in the project execution and quality assurance for the Project of Major Maintenance, Renovation, construction, setout
  • Raise material inspection request for compliance with Saudi Aramco Engineering Standards & Materials Specifications as per MMS system prior to install in the project execution, cooperate to store in charge for the staking of project material during unloading to avoid the contamination with soil and damages
  • Coordinate with site engineers at different locations and raise the request for inspection (RFI) to Project Inspection Department (PID) a day before to execute the activity and next day during inspection cooperate to PID along to perform the quality to get the approval of raised RFI
  • Witness in front of project inspection department (PID) once technician measure the slump and concrete temperature prior to start the concreting operation
  • Execute and close the SOR, NCR in 24 to 48 hours when takes place at job sit
  • Maintain the RFI in proper sequence for each activity and register the raised RFI in same sequence for better quality assurance
  • Make arrangement for walk through prior to handover takeover project and shoot the punch list whatever comes in observation during walk through

Site Engineer

Fluor Arabia Limited
09.1997 - 11.2000
  • Responsible for supervising, execution, and a day ahead material, manpower planning for progressive performance to achieve the management decided target
  • Coordinate with construction manager for the solution of any confusion in drawing design details prior to application during execution
  • Cooperate and share the execution ideas with deployed skilled and unskilled manpower for convenience work done to maintain the positive progress and quality during construction, at the end of day submit the progress report along to list of coworkers’ numbers and tools equipment

Site Engineer

Global Builders and Developers
07.1994 - 08.1997
  • Responsible to execute the work as per structural, architectural drawings, estimate and measure the quantity of materials to evaluate with estimated required quantity and actual consumed
  • Requesting the required tools, equipment’s and supervise the skill, un skill assigned manpower for the construction of apartment and communicate with consultants for the resolution of any difficulty at site
  • Checking the accuracy of formwork, reinforcement placement, clear cover and extra steel wherever required prior to start the concreting operation
  • Follow to vendors for the supply of required assets on time after the released LPO, submit daily manpower and work progress report to management

Education

B. Tech - Civil Engineering

J.R Narayan Vidhyapeth Rajasthan University
India
01.2009 - 01.2012

Diploma - Civil Engineering

Maharashtra Technical Board
Mumbai
01.1990 - 01.1994

Personal Information

  • Date of Birth: 01/05/69
  • Nationality: India
  • Marital Status: Married

Timeline

QA/QC Manager

Urbacon Contracting & Trading LLC
09.2019 - Current

Sr. QA/QC Engineer

INSHA Trading and contracting Co Doha Qatar
09.2017 - 08.2019

Sr. QA/QC Engineer

Group 3 Trading and Contracting
01.2013 - 08.2017

Sr. QA/QC Engineer

National Construction Pvt Ltd.
05.2009 - 12.2012

B. Tech - Civil Engineering

J.R Narayan Vidhyapeth Rajasthan University
01.2009 - 01.2012

QA/QC Engineer

Granit Construction Co
03.2007 - 04.2009

QA/QC Engineer

TEKFEN
04.2004 - 02.2007

QA/QC Engineer

Saudi Aramco
12.2000 - 03.2004

Site Engineer

Fluor Arabia Limited
09.1997 - 11.2000

Site Engineer

Global Builders and Developers
07.1994 - 08.1997

Diploma - Civil Engineering

Maharashtra Technical Board
01.1990 - 01.1994
Jawed AlamQA/QC Manager