Flooring-installer Jt Floor Covering Installations *Owner
03.2003 - Current
Maintained excellent communication, cleanliness, and safety standards on work sites and projects, boosting customer satisfaction ratings .
Measured, cut, and installed tack-free strips along baseboards or walls.
Followed detailed blueprints and plans to achieve proper fit and design of installed flooring.
Installed floor coverings and edgings, using thresholds and carpet bindings to complete finish work.
Cut and trimmed flooring to fit around obstacles and within tight spaces.
Utilized saws, nail guns and routers to safely complete flooring installation projects.
Professionally sanded and sealed floors to complete installation process.
Inspected completed installations to verify adherence to quality standards and customer specifications.
Coordinated with subcontractors to facilitate on-time delivery of supplies and flooring materials.
Applied adhesive substances to properly secure flooring and support longevity.
Conducted accurate measurements and calculations to verify proper layout and installation.
Installed hardwood, laminate and vinyl flooring for multiple residential and commercial clients.
Operated hand tools and machines to cut material and achieve proper fit around obstructions.
Formed tight and secure joints by removing excess materials and connecting individual pieces.
Assessed high-traffic areas and planned flooring layout and seam placement to suit expected traffic patterns.
Supplied accurate measurements and estimates for projects.
Recorded measurements and devised plans to match installation specifications.
Worked with different adhesives to join foundation, flooring and wall materials.
Readied surfaces to accept coverings by sweeping away materials, correcting flows and applying special treatments.
Operated sit-down forklift to unload and load carpet rolls and flooring skids into work vans.
Spread adhesive cement over floor to prevent board joint wearing.
Swept, scraped, and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
Removed existing flooring to prepare floor surfaces for new flooring.
Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.
Show Description