Subcontractor
Prince Pipeline Integrity
10.2021 - 12.2024
- Managed site preparation, ran traffic crews, maintaining safe working conditions throughout the duration of each job.
- Operated Hydro excavation equipment, Bridge Units, Bucket trucks, Excavators, skid steers, and sandblasting equipment
- Applied cathodic protection on gas mains and made sure voltage was within regulation standards
- Stripped and reapplied new coating on gas mains
- sand blasted gas lines and preformed UT tests to determine inner wall thicknesses
- Hydro excavated inside regulator buildings to locate control lines, sense lines, chart lines, and distribution lines
- Built retaining walls for Regulator buildings
- Installed and flushed irrigation systems
- Preformed body work, painted and maintained company vehicles/ equipment
- Received employee of the year for 2022-2023