Motivated commissioning technician skilled in workflow coordination and effective communication. Successfully collaborated with teams to execute commissioning plans, demonstrating a proactive approach to problem-solving and project management.
Overview
4
4
years of professional experience
Work History
Commissioning Technician
Balfour Beatty Infrastructure
Houston, Texas
12.2023 - 01.2026
Performed equipment inspections to ensure compliance with safety standards.
Supported setup and calibration of machinery, ensuring alignment with project specifications.
Conducted troubleshooting to identify and resolve system malfunctions.
Coordinated with teams to implement commissioning plans and procedures, enhancing project execution.
Documented processes and findings in detailed reports for project tracking.
Oversaw inventory of tools and equipment, facilitating streamlined workflow and readiness.
Managed multiple projects simultaneously while adhering to tight deadlines.
Communicated with project managers to coordinate commissioning activities effectively.
Executed on-site commissioning tasks for various equipment, ensuring proper installation and functionality.
Maintained records related to all aspects of commissioning work performed including test results, inspection findings and corrective actions taken.
Inspected piping systems for leaks or malfunctions during installation processes.
Repaired damaged piping systems using industry-standard techniques and materials.
Use hand tools such as saws, drills, wrenches, threaders, to perform tasks related to the job at hand.
Observed safe work rules and utilized fall protection and PPE.
Collaborated with other tradespeople such as electricians or plumbers to complete installations.
Install supports for pipes to keep them in place during installation process.
Drilled and tapped holes for installation of studs.
Installed piping systems for plumbing for both domestic and HVAC lines.
Test plumbing systems for leaks using air pressure gauges or other testing devices.
Repair or replace worn parts such as seals and bearings on pumps and valves.
Used valve keys and wrenches to turn valves and shut off water from pipe sections.
Conducted pressure tests on pipelines and equipment for integrity verification.
Prepared hydrostatic testing setups, ensuring proper alignment and safety measures.
Road Construction Laborer
J.D. Abrams, L.P.
Houston, Texas
01.2022 - 12.2023
Operated concrete mixing equipment for consistent material preparation.
Assisted in pouring and leveling concrete surfaces for various projects.
Employed various tools to ensure accurate spreading and leveling of concrete for project specifications.
Prepared surfaces for concrete application, ensuring optimal adhesion and finish.
Finished concrete surfaces to achieve high standards of smoothness and durability.
Collaborated with team members to streamline workflow on job sites.
Prepared and cleaned tools and equipment before and after tasks.
Completed day-to-day duties accurately and efficiently.