Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jeffery Martin

Port Neches,TX

Summary

Hardworking Maintenance Machanic bringing 35+ years of experience performing diverse maintenance and repair duties. Dedicated to maintaining optimal equipment functionality by managing routine and complex equipment and facility matters. Strong knowledge of hand and power tool operation and safety measures. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills.

Overview

35
35
years of professional experience

Work History

Millwright//Maintenance Technician

I-corp
03.2021 - Current
  • Created durable and long-lasting structures to withstand industrial environment demands.
  • Inspected and examined all machinery and equipment to detect malfunctions or irregularities.
  • Implemented standard safety procedures to prevent hazards related to industrial machinery and equipment.
  • Conducted comprehensive inspections of machinery to identify potential problems and ensure optimal performance.
  • Adhered to all workplace safety policies, regulations and compliances.
  • Ensured proper lubrication of moving components by adhering to a strict preventive maintenance schedule based on manufacturer recommendations.
  • Reviewed technical documentation such as blueprints, schematics, and manuals to accurately assess equipment conditions or plan for maintenance activities.
  • Read blueprints to safely and efficiently assemble equipment worth up to $[Amount].
  • Contributed to cost savings initiatives by sourcing alternative parts suppliers or implementing energy-efficient solutions where appropriate.

Millwright

Martin Midstream
03.2015 - 03.2021
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Positioned steel beams to support bedplates of machines and equipment using blueprints and schematic drawings.
  • Read blueprints to safely and efficiently assemble equipment worth up to $[Amount].
  • Disassembled machinery parts and categorized properly before moving to storage.
  • Optimized equipment lifespan through proactive monitoring of wear patterns and making adjustments as needed.
  • Improved workplace safety with diligent adherence to protocols, lockout/tagout procedures, and hazard identification.
  • Estimated time and materials for projects to assist management in making informed decisions on project budgets.
  • Contributed to cost savings initiatives by sourcing alternative parts suppliers or implementing energy-efficient solutions where appropriate.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.

Electrical Apprentice

M&I Electric
01.2015 - 02.2017
  • Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.

Pumper/Machanic

LNVA
03.1989 - 05.2013
  • Contributed to the overall success of the team by effectively communicating with other pumpers, operators, and supervisors regarding well performance issues.
  • Conducted daily inspections of surface equipment and pumps to identify and address seal leaks, improper priming and other minor operational inefficiencies.
  • Reported actual or potential environmental incidents immediately to supervisors to assist in minimizing harmful outcomes and quickly restoring order.
  • Demonstrated commitment to team success by consistently arriving punctually for shifts and remaining flexible during periods of increased workload or staffing shortages.
  • Ensured compliance with environmental regulations by properly disposing of produced water and reporting any spills or leaks immediately.
  • Safeguarded company assets, immediately reporting security violations to supervisors to prevent or mitigate corporate loss.
  • Aided in the identification of potential hazards by regularly reviewing safety procedures and attending mandatory training sessions.
  • Increased efficiency in data collection by maintaining accurate records of daily production rates, pressure readings, and fluid levels.

Education

Lamar

Skills

  • Maintenance recordkeeping
  • Soldering
  • Mechanical Troubleshooting
  • Fabrication
  • Blueprint Reading
  • Vibration analysis
  • Pneumatic controls
  • Troubleshooting
  • Equipment set up
  • Blueprint Interpretation
  • Equipment Installation
  • Preventive Maintenance
  • Coupling installation
  • Fastener Selection
  • Torque specifications
  • Work Planning
  • Equipment Inspection
  • Machinery Maintenance
  • Parts Installation
  • Power Tools Operation
  • Equipment Assembly
  • Industrial Mechanics
  • Rigging Techniques
  • Equipment Preparation
  • Mechanical tools

Timeline

Millwright//Maintenance Technician

I-corp
03.2021 - Current

Millwright

Martin Midstream
03.2015 - 03.2021

Electrical Apprentice

M&I Electric
01.2015 - 02.2017

Pumper/Machanic

LNVA
03.1989 - 05.2013

Lamar
Jeffery Martin