Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Jeffery Torrey Jr

Johnstown,OH

Summary

Adept at leading teams in high-stakes environments, I significantly enhanced safety and productivity at Complete General Construction by mastering advanced surveying and ensuring strict OSHA compliance. Skilled in both technical aspects like HVAC and fostering a positive work culture, my approach consistently surpasses project goals, demonstrating a unique blend of technical proficiency and leadership.

Overview

6
6
years of professional experience
1
1
Certification

Work History

Lead Pipe Layer

Complete General Construction
Columbus, OH
03.2023 - Current
  • Utilized advanced surveying techniques for precise alignment of pipes in accordance with design specifications.
  • Installed and repaired wet and dry utility pipe, sanitary and storm water sewer structures and pipe systems.
  • Increased safety on job sites by enforcing strict adherence to OSHA regulations and conducting regular safety meetings.
  • Monitored fellow workers to promote safety and productivity.
  • Promoted a positive work culture among team members by prioritizing respect, open communication, and professional development opportunities.
  • Consistently met or exceeded project goals by effectively managing resources, optimizing workflow, and maintaining open lines of communication with all stakeholders.

Pipe Layer

Double Z Construction Company
Columbus, OH
05.2020 - 12.2022
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Demonstrated strong problem-solving abilities by addressing unexpected complications during pipe installation processes.

Maintenance Technician

Dietz Property Management Group
Blacklick, OH
06.2018 - 05.2020
  • Operated varied hand and power tools to complete repairs.
  • Used problem-solving skills to alleviate issues efficiently with minimal supervision.
  • Troubleshot equipment breakdowns and performed preventive maintenance.
  • Followed work orders and specifications for machine and equipment replacement, repair, or maintenance.
  • Completed daily, weekly, and monthly checklists on building equipment to maintain records of scheduled maintenance procedures.
  • Aquired HVAC Certification

Skills

  • Framing
  • Drywall
  • Concrete
  • Use of power tools
  • Ability to read and understand both forms of measurement (10th rule/tape measure)
  • Build forms
  • Read and understand grade
  • Bluprints
  • Electrical
  • Painting
  • Hvac

Certification

Hvac

Timeline

Lead Pipe Layer

Complete General Construction
03.2023 - Current

Pipe Layer

Double Z Construction Company
05.2020 - 12.2022

Maintenance Technician

Dietz Property Management Group
06.2018 - 05.2020

Hvac

Jeffery Torrey Jr