Overview
Work History
Education
Skills
Timeline
Generic

Jeffrey Green

Flooring Installation Ex,construction
Hockley,TX

Overview

29
29
years of professional experience
4
4
years of post-secondary education

Work History

Lead Flooring Installer,construction

SD Rock N Flooring
San Diego, CA
11.1992 - 02.2022
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Observed safety regulations on job sites to minimize accidents.
  • Assisted in constructing roads, bridges and other infrastructure projects to respond to economic, fiscal and environmental changes.
  • Followed blueprints and diagrams to complete projects according to specifications.
  • Installed drywall, flooring and other interior finishes to create finished and functional living and work spaces.
  • Conducted daily site inspections to identify potential safety hazards.
  • Worked with contractors and other tradespeople to meet project specifications and deadlines.
  • Swept, scraped, and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
  • Removed existing flooring to prepare Type and Type floor surfaces for new flooring.
  • Inspected completed installations to verify adherence to quality standards and customer specifications.
  • Followed detailed blueprints and plans to achieve proper fit and design of installed flooring.
  • Installed hardwood, laminate and vinyl flooring for multiple residential and commercial clients.
  • Professionally sanded and sealed floors to complete installation process.
  • Cut and trimmed flooring to fit around obstacles and within tight spaces.
  • Applied adhesive substances to properly secure flooring and support longevity.
  • Coordinated with subcontractors to facilitate on-time delivery of supplies and flooring materials.
  • Conducted accurate measurements and calculations to verify proper layout and installation.

Education

None - Social And Philosophical Foundations of Education

Abraham Lincoln High School
Brooklyn, NY
06.1977 - 05.1981

Skills

Trim work

undefined

Timeline

Lead Flooring Installer,construction

SD Rock N Flooring
11.1992 - 02.2022

None - Social And Philosophical Foundations of Education

Abraham Lincoln High School
06.1977 - 05.1981
Jeffrey Green Flooring Installation Ex,construction