Work Preference
Professional Summary
Overview
Work History
Education
Skills
Certification
Timeline
Open To Work

JEFFREY PATIN

Brown and Root
New Orleans,LA
JEFFREY PATIN

Work Preference

Job Search Status:

Open to work

Desired start date:

Immediately

Desired Job Title

Crew ChiefCrew ChiefCrew ChiefCrew ChiefField Engineer, Layout

Work Type

Full TimeContract Work

Location Preference

On-Site

Location:

New Orleans, LA

Open to relocation:

Yes

Important To Me

Career advancementCompany Culture
1
Certification
27
years of professional experience

Strong work standards in resolving client Scope, proven a leader in generating revenue And adding value to the name I work under. I believe in creating a STABLE professional work Environment, and that starts with what we do in the field, My knowledge is rooted from conventional practices, and I have developed -with the advancing field. Creating a effective routine that focuses on consistent checks, clear detailed field notes, and reviewing job progress using the data collector map. A Consistent routine is the key, this accounts for any data missed, reduces stress and decision making, and eliminates go backs.

Work History

Crew Chief

10 Months
Brown and Root | 09.2025 - 07.2026
  • Led field survey crew operations while keeping exact layout, documentation, and quality control on active industrial job sites.
  • Operated Top-con total stations and Sonia GPS equipment with Carlson data collectors for layout, data collection, and field verification.
  • Performed 3D laser scanning, three-wire leveling, and digital leveling to meet plant tolerance requirements.
  • Monitored tanks during stage loading and kept detailed field notes to support project tracking and communication.
  • Calculated and laid out offshore pile locations with attention to accuracy, safety, and production needs.

Crew Chief

11 Months
LANDMARK Surveying | 10.2024 - 09.2025
  • Safely functioned as a one- or two-person survey crew while keeping productivity, accuracy, and job-site awareness.

Crew Chief

5 Years 8 Months
BFM LLC | 04.2019 - 12.2024
  • Functioned as a one-person survey crew while managing field data, equipment, and survey responsibilities for engineering plan development and new construction.
  • Laid out utilities, boundaries, topographic surveys, cross sections, and construction stakeout work with a focus on accuracy and consistency with project plans.
  • Performed settlement plate monitoring, hydrographic surveys using HYPACK, laser scanning, and drone technology.
  • Operated Leica GPS and total station equipment and used Leica Captivate software to manage survey data.
  • Started and oversaw large projects, ensured field accuracy, kept detailed notes, and communicated with construction crews to support job integrity.
  • Maintained Part 104 drone certification to support aerial survey and project documentation needs.

Crew Chief

4 Years 2 Months
L&L Surveying | 02.2015 - 04.2019
  • Directed and supervised all field work for one- to three-person survey teams, including daily setup, task assignments, and field quality checks.
  • Adjusted and operated Top-con GPT, robotic total stations, Spectra Focus robotic instruments, and Trimble R8 GPS equipment.
  • Calculated dimensions, footage, profiles, component specifications, property boundaries, and lot corners using field maps, data collectors, and calculators.
  • Performed angle and distance checks, recovered monuments and survey marks, and supported exact measurements, notes, and sketches.
  • Prepared and conducted topographic and contour surveys, documenting site features and relevant field conditions.
  • Operated and kept survey vehicles and equipment while supporting field labor including brush cutting, staking, and tape measurements.

Field Engineer, Layout

10 Months
James Construction | 04.2014 - 02.2015
  • Managed, planned, and supported layout and as-built operations for underground pipe construction at the CF Industries plant expansion.
  • Adjusted and operated Sokkia robotic total station equipment with Carlson data collection software.
  • Calculated exact X, Y, and Z coordinates from engineering plans to support exact layout and installation.
  • Set stakes and grades, verified tolerances, and communicated field changes to resolve conflicts and maintain project accuracy.

Grade Checker / Crew Chief

2 Years 7 Months
Bloomdale Construction | 05.2010 - 12.2012
  • Served as a layout specialist, grade checker, and crew chief responsible for keeping slope and settlement plate tolerances.
  • Utilized Trimble GPS and TerraModel software to keep survey control and support exact field layout.
  • Conferred with supervisors to confirm project details, testing needs, and evaluation requirements for site conditions.
  • Reported field issues and negotiated changes to resolve conflicts while keeping work aligned with project requirements.

Crew Chief / Field Engineer

1 Year 11 Months
T. Baker Smith | 01.2008 - 12.2009
  • Directed and supervised a two-person crew performing construction layout under contract with James Construction at Marathon GME.
  • Used Topcon total stations and Carlson data collection to perform traverse closures and horizontal and vertical adjustments.
  • Computed and provided layout data needed to stake drainage boxes and pipe for construction.
  • Navigated to KRMS sites to install settlement rods and support field monitoring requirements.
  • Operated and kept survey vehicles, watercraft, and field equipment while supporting safe and exact job-site operations.

Crew Chief

1 Year 8 Months
Krebs, LaSalle, Lemieux | 04.2006 - 12.2007
  • Directed and supervised team members while planning and conducting surveys for new project sites.
  • Adjusted and operated Topcon total station equipment and kept accurate field data using notes, sketches, Recon data collectors, and HP 48 tools.
  • Collected and provided information needed to complete both existing and new survey assignments.
  • Performed calculations to decide X, Y, and Z coordinates and support exact field layout.
  • Conducted surveys to name natural features, man-made improvements, dimensions, footage, and part specifications.

Instrument Man / Crew Chief

7 Months
Landsource Inc | 09.2005 - 04.2006
  • Worked as an instrument man and crew chief after moving to New Roads following Hurricane Katrina.
  • Adjusted and operated Leica robotic total stations and Leica GPS equipment for field survey assignments.
  • Directed and followed survey work instructions for team members to complete field tasks safely and accurately.
  • Performed field labor including cutting brush, setting stakes and hubs, and carrying equipment.
  • Managed and cared for survey equipment while completing survey requests as needed to support project completion.

Crew Chief

11 Months
Krebs, LaSalle, Lemieux | 10.2004 - 09.2005
  • Directed and supervised members of the survey team while aiding with daily field planning and execution.
  • Adjusted and operated survey instruments and performed calculations to figure out X, Y, and Z coordinates.
  • Prepared and conducted topographic and contour surveys, including site features and relevant field information.
  • Read measurements and descriptive data using notes and sketches and kept exact field documentation.
  • Set and recovered stakes and planned surveys to locate new project sites.

Crew Chief

10 Months
BFM | 12.2003 - 10.2004
  • Directed and supervised a two- to three-person survey crew on field assignments.
  • Collected information needed to carry out new surveys using maps, notes, sketches, and existing field records.
  • Read and measured descriptive data using field notes and sketches to support accurate survey deliverables.
  • Supported survey layout, field measurements, equipment operation, and job-site coordination for project needs.
  • Maintained survey equipment and vehicles to keep field operations safe, organized, and productive.

Instrument Man / Crew Chief

4 Years 7 Months
MJB Surveyors | 05.1999 - 12.2003
  • Conferred with clients and landmen to evaluate sites and prepare oil well drill locations for construction staking.
  • Searched for and located section corners for oil pool unit surveys.
  • Ran and adjusted horizontal and vertical control to support accurate field survey work.
  • Conducted surveys to locate natural and man-made features and document field conditions.
  • Adjusted and operated survey instruments while managing and caring for survey equipment and vehicles.

Education

No Degree - Construction Management

Delgado Community College | New Orleans, LA

High School Diploma

Catholic High of Pointe Coupee | New Roads, LA | 05.1993

Skills

Zero accidents
support safe work environment
Excellent communication skills
Attention to detail
Ability to collaborate effectively
Providing high-quality care
Manage Survey data and interpret Engineering plans
Time management
Resourceful job planning

Certification

FAA PART 107 remote pilot license

Timeline

Crew Chief

Brown and Root
09.2025 - 07.2026Read More

Crew Chief

LANDMARK Surveying
10.2024 - 09.2025Read More

Crew Chief

BFM LLC
04.2019 - 12.2024Read More

Crew Chief

L&L Surveying
02.2015 - 04.2019Read More

Field Engineer, Layout

James Construction
04.2014 - 02.2015Read More

Grade Checker / Crew Chief

Bloomdale Construction
05.2010 - 12.2012Read More

Crew Chief / Field Engineer

T. Baker Smith
01.2008 - 12.2009Read More

Crew Chief

Krebs, LaSalle, Lemieux
04.2006 - 12.2007Read More

Instrument Man / Crew Chief

Landsource Inc
09.2005 - 04.2006Read More

Crew Chief

Krebs, LaSalle, Lemieux
10.2004 - 09.2005Read More

Crew Chief

BFM
12.2003 - 10.2004Read More

Instrument Man / Crew Chief

MJB Surveyors
05.1999 - 12.2003Read More

Delgado Community College

No Degree from Construction Management
Read More

Catholic High of Pointe Coupee

High School Diploma
Read More
JEFFREY PATIN