Overview
Work History
Timeline
Generic

Jeramey R. Wieloch

Wexford,PA

Overview

16
16
years of professional experience

Work History

Maintenance Foreman

Turner Industrial
Pittsburgh, PA
02.2025 - Current
  • Maintained open communication between different work groups and trades to effectively complete tasks in an organized, time-efficient, and cost-effective manner
  • Worked closely with supervision and planners to develop time tables, material lists, and man power requirements to begin tasks on time and complete within the schedule
  • Created a culture of communication between Superintendents, Engineers, Foremen, and work groups to ensure that critical information reached the necessary personnel
  • Plans and designs structures, using layout equipment and methods to determine correct placement
  • Reference drawings and manuals for equipment specs, troubleshooting information, and regular maintenance schedules.

Outage General Foreman

Turner Industrial
Pittsburgh, PA
02.2025 - Current
  • Supervise and direct multiple crews from various disciplines to ensure that tasks are completed within the designed deadline while ensuring safety standards are met
  • Manage on-site project execution to meet budget, and schedule needs
  • Communicate effectively with engineers, rotating specialists, other contractors, vendors, and the end user to keep an efficient job flow along with constant open lines of communication.
  • Pre-outage planning to ensure the materials and tooling are on-site to start the project on time and finish by the deadline without logistical delays.

Planner (Pennsylvania Chemicals)

Graham Industrial
Pittsburgh, PA
03.2024 - 02.2025
  • Coordinate production workflow for all active (and future) millwright tasks to be completed
  • Determine manpower, equipment and raw material needed to cover the production demand in the future.
  • Plan and prioritize operations to ensure maximum performance of employees and minimum delay of finished tasks.

Routine Maintenance (Pennsylvania Chemicals) Millwright Steward

Graham Industrial
Pittsburgh, PA
07.2023 - 02.2025
  • Represents and defends the interest of his fellow Millwrights
  • Ensures that all collective bargaining agreements are being enforced on a daily basis, ensures employer is compliant with federal, state, and local laws.
  • Handles and negotiates any and all grievances that may arise in a timely and professional manner.
  • Fosters open communication through all channels of the organization ensuring that all working groups and supervision are able to understand one another’s business needs.

Routine Maintenance (Pennsylvania Chemicals) Millwright Foreman

Graham Industrial
Pittsburgh, PA
04.2022 - 07.2024
  • Maintained open communication between different work groups and trades to effectively complete tasks in an organized, time-efficient, and cost-effective manner
  • Worked closely with supervision and planners to develop time tables, material lists, and man power requirements to begin tasks on time and complete within the schedule
  • Created a culture of communication between Superintendents, Engineers, Foremen, and work groups to ensure that critical information reached the necessary personnel
  • Plans and designs structures, using layout equipment and methods to determine correct placement
  • Reference drawings and manuals for equipment specs, troubleshooting information, and regular maintenance schedules.

Millwright General Foreman

Great Arrow Builders ECU (Pennsylvania Chemicals)
Pittsburgh, PA
10.2018 - 07.2021
  • Instilled a culture of leadership at all levels while training a world class work force in the use of precision optics, laser alignment tools, and layout techniques
  • Established a peer run safety program that was recognized with a safety award on the Global Safety Day (March 27, 2019)
  • Planned, mobilized, and executed major works that were considered critical path with a quality product while maintaining safety at a high standard, such as; setting, leveling, and aligning CGC, ERC, and PRC compressor trains
  • Maintained open communication between different work groups and trades to effectively complete tasks in an organized, time-efficient, and cost-effective manner
  • Created a culture of communication between Superintendents, Engineers, Foremen, and work groups to ensure that critical information reached the necessary personnel
  • Worked closely with supervision and planners to develop time tables, material lists, and man power requirements to begin tasks on time and complete within the schedule

Millwright Foreman

Great Arrow Builders CoGen (Pennsylvania Chemicals)
Pittsburgh, PA
04.2018 - 10.2018
  • Set generator, load gear, and turbine sole plates to strict API standards for elevation, levelness, and flatness
  • Set the first rotating equipment across the entire project through quality work and meeting established timelines
  • Trained a world class work force in the use of precision optics, laser alignment tools, and layout techniques
  • Discovered, monitored, and tracked an unusual settlement of machinery foundations to help formulate a long-term solution to ensure the life span of the rotating equipment to be placed upon the foundations

Vice President

Local 443
Pittsburgh, PA
04.2024 - Current
  • Run meetings in the absence of the President
  • Ensure that meetings run smoothly from the floor and that all members voices are heard
  • Develop programs within the local to build strength and unity within its membership
  • Discuss, vote on, and recommend bi-law changes and edicts to ratify contracts

Trustee

Local 443
Pittsburgh, PA
01.2019 - 04.2024
  • Validate financial records against expenditures to verify money was spent legally within the bi-laws as reported by the minutes
  • Develop programs within the local to build strength and unity within its membership
  • Discuss, vote on, and recommend bi-law changes and edicts to ratify contracts

Social Defense Committee Chairman

Local 443
Pittsburgh, PA
08.2018 - Current
  • Manage the social defense bank account and assets
  • Organize and preside over committee meetings
  • Plan, organize, and execute an annual family picnic, Labor Day parade social, and membership attendance/recognition awards
  • Create membership-based scholarship program for present college applicants

Millwright

Local 443 (2235)
Pittsburgh, PA
05.2010 - Current
  • Analyzed conditions as found while assessing damages to determine an appropriate course of action
  • Coordinated with multiple crafts and customer to meet production deadlines
  • Inventoried parts required for the necessary repairs to ensure they were on hand when needed
  • Set up and verified the functionality of safety barriers/equipment in compliance with OSHA regulations; Lock Out Tag Out (LOTO), Job Hazard Analysis (JHA), Personal Protective Equipment (PPE), Fall Protection
  • Prioritized projects/activities and interpreted technical blueprints, drawings, manuals, and schematics to map work procedures, schedule timelines, and complete all actions within established timeframes.
  • Minimized and eliminated production downtime by forecasting potential issues and planning for future evolutions
  • Actively encourage my team to participate in safety meetings and emergency response activities including site specific safety programs
  • Serve as a positive mentor/leader while performing all activities by creating a positive work environment and elevating team morale
  • Communicated status/progress reports daily to all individuals involved in production and scheduling

Timeline

Maintenance Foreman

Turner Industrial
02.2025 - Current

Outage General Foreman

Turner Industrial
02.2025 - Current

Vice President

Local 443
04.2024 - Current

Planner (Pennsylvania Chemicals)

Graham Industrial
03.2024 - 02.2025

Routine Maintenance (Pennsylvania Chemicals) Millwright Steward

Graham Industrial
07.2023 - 02.2025

Routine Maintenance (Pennsylvania Chemicals) Millwright Foreman

Graham Industrial
04.2022 - 07.2024

Trustee

Local 443
01.2019 - 04.2024

Millwright General Foreman

Great Arrow Builders ECU (Pennsylvania Chemicals)
10.2018 - 07.2021

Social Defense Committee Chairman

Local 443
08.2018 - Current

Millwright Foreman

Great Arrow Builders CoGen (Pennsylvania Chemicals)
04.2018 - 10.2018

Millwright

Local 443 (2235)
05.2010 - Current
Jeramey R. Wieloch