Accomplished welder with extensive experience specializing in stick welding and fabrication of hydronic chill water piping and oil and gas piping. Demonstrated exceptional attention to detail and proficiency in blueprint reading, ensuring high-quality results under pressure. Proven ability to deliver high quality welds that meet rigorous inspection standards.
Stick welding hydronic chill water piping and pipefitting we were building data centers
Stick welding a bunch of 36 inch carbon hydronic Chill water piping for UT heath research hospital
I was welding and fabricating 12 carbon steel hydronic chill water piping . Setting chill water pumps. Setting chillers,tying in piping to chillers
The job was 42 inch steel fabrication job every weld was X-rayed and checked by inspectors . The reason for that it had to be able withstand 25000 pounds of pressure
This job was a chiller change out quick hot job small 4 inch carbon hydronic piping fabrication
Stick Welding fabrication, and welding on a pipeline