Summary
Overview
Work History
Education
Skills
Certification
References
Training
Timeline
Generic

Jeremy Maddox

Midland,Texas

Summary

High Energy pipeline professional with twenty plus years experience, adept in handling customer requirements and deadlines while maintaining a safe working environment.

Overview

18
18
years of professional experience
5
5
Certifications

Work History

Pipeline Inspector

BWS Inspection
04.2021 - Current

EOG Resources gathering systems
Multiple jobs of various sizes with multiple contractors
Steel, Poly, Fiberglass and FlexSteel: 4" to 24"
Inspection included but not limited to:

  • In field training with Peanut McAdams:
  • Hot tap (steel)
  • Hot tap/squeeze (poly)
  • Right of way clearing
  • Line spotting
  • Live line excavations
  • Stringing pipe
  • As Builds
  • Weld mapping
  • Red lining alignment sheets
  • Inspection of welds
  • Reviewing Data Loggers
  • Coating
  • Lowering in
  • Pad & Backfill
  • Hydro Testing
  • Nitrogen blankets
  • Cleaning and drying lines (Pigging)
  • Final Cleanup and Restoration
  • Building job books

Utility Inspector

CTL Corp.
04.2019 - 02.2021

White Water Midstream

  • WWM - Tornado NGL 19 miles of 10"
  • WWM - Sendero Gas 15 miles of 36"
  • WWM - Preakness Gas 6 miles of 20"
  • WWM - Preakness NGL 22 miles of 12"
  • WWM - Tiger Lateral 2 miles of 16"
  • WWM - Crestwood Lateral 2,800' of 10"
  • WWM - AB42 43 miles of 42" and 10 miles of 30"
  • WWM - BANGL Midland Lateral 30 miles of 16"

Utility Inspector

BWS Inspection Services
04.2019 - 07.2019

3 Bear Energy gathering system

Multiple Projects with multiple lines per ditch
Inspection From Routing to Final Tie-ins and Final Cleanup
• Poly pipe
• Steel Pipe
• Flex Steel Pipe
• Installing Lact Units
• Line Routing
• SWD Hookups
• Pressure Testing - Hydro and Pneumatic


Utility Inspector

Natural Energy Field Services
12.2018 - 04.2019

Kinder Morgan Gulf Coast Express
126 miles of 42" NGL includes the following;
• Line Spotting
• Cutting grade
• Ditching
• Excavation of foreign lines
• Jeeping of the pipe
• Coating repairs on the pipe
• Lowering In
• Tie-ins
• Padding and Backfill

Utility Inspector

CTL Corp.
06.2018 - 11.2018

DCP Red Bluff Loop
110 miles of 20" NGL includes the following;
• Right of Way clearing
• Line spotting
• Ditching
• Excavation of live lines,
• Tie-ins
• Padding
• Torquing
• Fencing
• Pigging
• Nitrogen fill
• Hydro testing
• Line commissioning
• Final Cleanup
• Final inspection

Operations Manager

EZ Pipeline Padding
09.2012 - 06.2018
  • Supervise all padding and trenching jobs
  • Record and conduct safety meetings
  • Supervise all rentals, leases, and sales of equipment
  • Responsible for making sure all customer requirements and safety
    guidelines are met
  • Jobs included 2 inch to 42 inch Steel, Poly, Fiberglass, Flex Steel

Superintendent/Heavy Equipment Operator

Wilbros
02.2006 - 09.2012
  • Supervise pipeline job from start to completion
  • Installation of 4 inch to 20 inch Steel Pipelines
  • Installation of 2 inch to 36 inch Poly Pipelines
  • Installation of 4 inch to 12 inch Fiberglass Pipelines
  • Installation of 4 inch Flex Steel lines
  • Experienced in Poly Fusion, Fast Fusion machines, Mcelroy Fusing
    machines. lowering in, Tie-ins, Padding, Backfilling
    Excavation of live lines, anomaly digs, benching and shoring, placing
    anodes, hydro-testing
  • Excavation of contaminated soil and remediation of same
  • Worked with Texas Railroad Commission to assure all jobs performed
    within state requirement

Education

General Studies -

Midland High School

Skills

Ability to multitaskundefined

Certification

API 1169 Certification Number 81308

References

  • Martin Smith, CTL Corp, Chief Superintendent, 918-822-3664
  • Tony Irvin, CTL Inspection, Assistant Chief, 832-330-7836
  • Mike Wheeler, BWS Inspection Services, Utility Inspector, 432-559-0368
  • Dennis "Dink" Thompson, CIS Inspection, Lead Inspector, 432-770-2152

Training

  • Confined space entry
  • H2S
  • Excavation safety
  • Personal protection
  • Electrical safety
  • API 1169
  • Veriforce OQs
  • Safeland PEC
  • OSHA 30-Hour

Timeline

Pipeline Inspector

BWS Inspection
04.2021 - Current

Utility Inspector

CTL Corp.
04.2019 - 02.2021

Utility Inspector

BWS Inspection Services
04.2019 - 07.2019

Utility Inspector

Natural Energy Field Services
12.2018 - 04.2019

Utility Inspector

CTL Corp.
06.2018 - 11.2018

Operations Manager

EZ Pipeline Padding
09.2012 - 06.2018

Superintendent/Heavy Equipment Operator

Wilbros
02.2006 - 09.2012

General Studies -

Midland High School
API 1169 Certification Number 81308
OSHA 30-Hour
Safeland PEC
Veriforce OQs - 001, 201, 202, 213, 401, 404, 405, 412, 426, 427, 501, 607, 619, 703
Kinder Morgan CBT's, Kinder Morgan OQ's
Jeremy Maddox