High Energy pipeline professional with twenty plus years experience, adept in handling customer requirements and deadlines while maintaining a safe working environment.
EOG Resources gathering systems
Multiple jobs of various sizes with multiple contractors
Steel, Poly, Fiberglass and FlexSteel: 4" to 24"
Inspection included but not limited to:
White Water Midstream
3 Bear Energy gathering system
Multiple Projects with multiple lines per ditch
Inspection From Routing to Final Tie-ins and Final Cleanup
• Poly pipe
• Steel Pipe
• Flex Steel Pipe
• Installing Lact Units
• Line Routing
• SWD Hookups
• Pressure Testing - Hydro and Pneumatic
Kinder Morgan Gulf Coast Express
126 miles of 42" NGL includes the following;
• Line Spotting
• Cutting grade
• Ditching
• Excavation of foreign lines
• Jeeping of the pipe
• Coating repairs on the pipe
• Lowering In
• Tie-ins
• Padding and Backfill
DCP Red Bluff Loop
110 miles of 20" NGL includes the following;
• Right of Way clearing
• Line spotting
• Ditching
• Excavation of live lines,
• Tie-ins
• Padding
• Torquing
• Fencing
• Pigging
• Nitrogen fill
• Hydro testing
• Line commissioning
• Final Cleanup
• Final inspection