Summary
Overview
Work History
Skills
Timeline
Generic

Jeremy Parr

Allen Park,MI

Summary

Detail-oriented Forman/ crew lead that brings extensive construction background and specialized experience on challenging projects. Smoothly leads team members to meet goals, maximize performance, and maintain important safety standards. Knowledgeable about applicable codes and industry best practices.

I also take pride in being on time and doing everything I can to provide the best possible job

Overview

8
8
years of professional experience

Work History

Owner

Kingsway Painting
Allen Park, MI
01.2023 - Current

Foreman

Pro Image Inc
, MI
11.2022 - Current
  • Applied paints using brushes, rollers or spray guns to interior and exterior walls, ceilings, doors and other surfaces.
  • Collaborated with clients to determine color schemes for various projects.
  • Reported project progress, site problems and labor status to supervisors.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Supervised a team of 3-4 painters, providing guidance on techniques, product usage, and equipment operation.
  • Performed regular maintenance checks on tools used in painting jobs.
  • Monitored equipment operation during extraction process to detect problems.
  • Managed multiple tasks simultaneously while ensuring deadlines were met.
  • Prepared and planned worksites to help jobs run smoothly.
  • Performed final walkthroughs of each job and prepared reports.
  • Addressed customer complaints promptly and professionally.
  • Delegated work to staff, setting priorities and goals.
  • Kept production team moving forward for progress in daily site operations.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Ordered materials such as paint supplies and protective coverings as needed.
  • Provided direction to employees regarding job assignments and scheduling of personnel hours.
  • Trained new hires on proper use of tools and safety procedures related to their job duties.
  • Resolved conflicts between staff members quickly in order to maintain a positive working environment.

Painter

Pro Image Inc
, MI
05.2019 - Current
  • Assessed work areas to determine safety measures required before beginning the job.
  • Performed minor repairs, such as caulking windowsills, before painting them.
  • Completed diverse repairs on commercial and residential buildings and equipment.
  • Mixed and applied paints, varnishes and sealants to promote lasting finish.
  • Used power and hand tools safely and effectively.
  • Painted walls and other surfaces using traditional and sprayer methods and worked efficiently to complete jobs within required timeframes.
  • Chose correct brushes and materials for jobs and purchased from vendors.
  • Primed, smoothed and cleaned trim, walls and ceilings to prepare for painting tasks.
  • Smoothed surfaces using sandpaper, scrapers or sanding machines.
  • Cleaned and properly stored paint equipment and supplies at end of each workday.
  • Selected appropriate paint colors based on customer preferences.
  • Cleaned up job sites after completion of projects.
  • Sprayed prepared surfaces with specified amounts of primers and finish coatings.
  • Mixed and matched paint, stain or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
  • Prepared surfaces by washing, scraping, sanding, and patching holes.

Painter

Drywall by Rufus
Detroit, MI
04.2018 - 05.2019
  • Cleaned and smoothed surfaces prior to painting.
  • Sanded woodwork prior to staining or painting.
  • Performed minor repairs, such as caulking windowsills, before painting them.
  • Removed pictures, door knobs or electric switch covers prior to painting.
  • Chose correct brushes and materials for jobs and purchased from vendors.

Skills

  • Schematics and Blueprints
  • Operations Supervision
  • Construction Management
  • Effective Communication
  • Project Planning
  • Teamwork and Collaboration
  • Cost Estimation
  • Work Planning and Prioritization
  • Workplace Safety
  • Critical Thinking
  • Interpersonal and Written Communication
  • Heavy Lifting

Timeline

Owner

Kingsway Painting
01.2023 - Current

Foreman

Pro Image Inc
11.2022 - Current

Painter

Pro Image Inc
05.2019 - Current

Painter

Drywall by Rufus
04.2018 - 05.2019
Jeremy Parr