Performed lateral lining and installed new mainline piping with precision.
Conducted on-site inspections of host pipe with push camera.
Implemented blue light cured liner post-cleaning and after producing pre-lining video.
Wet liner and insert it into the inverter for host pipe setup.
Cut out laterals after liner installation.
Operated heavy machinery including loaders and excavators.
Performed excavation to connect and replace compromised pipes with Schedule 40 PVC.
When doing a patch job, I would put the ambient cure pactch on a plug, push it into the line and inflate the plug and keep the air regulated until the patch is cured to the host pipe.