Detail-oriented construction professional with extensive project management experience. Proven track record of leading teams to meet performance goals while ensuring compliance with safety standards and regulations. Expertise in project scheduling, safety compliance, and effective communication, resulting in timely and budget-conscious project completions. Committed to delivering high-quality work and consistently exceeding expectations in all assignments.
Overview
2027
2027
years of professional experience
Work History
Carpenter Foreman
Panelized Sructures
Reno
12.2020 - Current
Oversee construction of hybrid roof structures ranging from 100,000 to 700,000 square feet.
Lift, align, and secure heavy materials over 60 feet during roof construction and installation of trusses, rafters, sheathing, and structural components.
Interpret blueprints and building plans for precise roofing design implementation.
Inspect completed work for quality assurance and compliance with industry standards.
Supervised crew members, providing guidance and technical support to ensure project success.
Collaborated with subcontractors to maintain adherence to project timelines and quality standards.
Implemented process improvements that consistently enhanced productivity and reduced downtime.
Use various tools including saws, drills, and nail guns to enhance assembly efficiency.
Follow and reinforce OSHA safety protocols while performing physically demanding tasks at heights.
Operator/Laborer
Sierra Nevada Construction
Reno
2009 - 2013
Prepared construction sites by clearing and grading land, ensuring operational readiness.
Operated heavy equipment such as graders, rollers, bulldozers, excavators, asphalt pavers, loaders, skid steerers and dump trucks while adhering to safety guidelines.
Executed excavation for foundations and drainage systems, ensuring compliance with project specifications.
Coordinated traffic control by erecting signs and barricades around active sites.
Utilized jackhammers to break up asphalt for road improvements.
Conducted maintenance on road construction machinery, ensuring optimal performance and reliability.
Installed storm sewer drainage systems, adhering strictly to design specifications for effective water management.
Followed strict safety protocols throughout all phases of road construction.
Foreman Electrician
RC Electric LLC and TNT Electric LLC
Reno
2003 - 2009
Led a team of electricians, driving on-time completion of tasks while managing budget constraints.
Oversaw installation of electrical systems in residential and commercial settings, guaranteeing adherence to safety standards.
Partnered with project managers to devise effective electrical layouts and timelines.
Ensured compliance with code through interpretation of requirements for wire and conduit sizes.
Executed quality control protocols to verify that installations met all regulatory standards.
Developed detailed wiring system plans, ensuring all documentation remained accurate and current.
Analyzed technical diagrams to support precise project execution.
Oversaw project details and adhered to diagnosis, wiring and OSHA regulations.
Established and enforced work standards and procedures, enhancing compliance and safety across the team.
Trained and assessed team members on daily tasks, facilitating skill development and performance improvement.
Kept production team moving forward for progress in daily site operations.