Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jessie Danley

Flat Rock,AL

Summary

Adept at navigating the complexities of both residential and commercial construction, I honed my skills in drywall installation and team collaboration at Timothy Hinkles Construction. My proactive approach led to innovative solutions that enhanced project outcomes, demonstrating a 25% improvement in efficiency without compromising safety or quality. Motivated construction laborer committed to learning and implementing skilled trades and meeting customer needs. Follows instructions and leads others with equal proficiency. Cultivates productive working relationships and instills confidence and trust. Hardworking laborer known for high productivity and efficient task completion. Skilled in operating heavy machinery, adhering to safety protocols, and performing physical labor under various conditions. Excel at communication, teamwork, and adaptability, ensuring smooth workflow and project success.

Overview

10
10
years of professional experience

Work History

Laborer

Timothy Hinkles Construction
Bridgeport, AL
02.2020 - Current
  • Lubricated, cleaned or repaired machinery or equipment.
  • Prepared surfaces prior to painting by sanding, scraping, patching holes, and filling cracks with putty or plaster.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Operated and maintained a variety of equipment including hand and power tools.
  • Followed all safety procedures when handling hazardous materials in the laboratory setting.
  • Poured concrete foundations for structures such as buildings or bridges according to blueprints provided.
  • Cleaned work area after job completion ensuring all debris is properly disposed of.
  • Contributed innovative ideas and solutions to enhance team performance and outcomes.

Laborer

Jenkins Masonry
Chattanooga, TN
04.2018 - 02.2020
  • Prepared surfaces prior to painting by sanding, scraping, patching holes, and filling cracks with putty or plaster.
  • Followed all safety procedures when handling hazardous materials in the laboratory setting.
  • Poured concrete foundations for structures such as buildings or bridges according to blueprints provided.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Operated and maintained a variety of equipment including hand and power tools.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Prepared items for transportation installing bracing, padding and strapping to prevent damage.
  • Operated pallet jacks and forklifts to load and unload supplies and materials.
  • Assembled scaffolding around construction sites for use by laborers during high-rise building projects.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Coordinated phases of construction projects from inception to completion.
  • Worked with team members to ensure efficient workflow throughout the day.
  • Operated equipment with strong focus on safety and ground communication.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Unloaded freight from containers and organized them for storage in designated areas.
  • Collaborated with team members to complete assigned tasks and meet tight deadlines.
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Used picks and shovels to dig, spread and level dirt and gravel.
  • Performed physical activities requiring heavy lifting, walking and standing for long periods of time.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Demonstrated best safety practices working at heights and lifting various objects.
  • Loaded or unloaded building materials to distribute machinery or tools.
  • Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
  • Operated various power tools such as drills and saws safely while following manufacturer's instructions.
  • Lifted objects weighing up to 50 pounds without assistance when necessary.
  • Cut materials into specified sizes for installation using tile cutters and power saws.
  • Mixed, poured, and spread concrete, asphalt gravel, and other materials.
  • Stacked and arranged products on pallets according to size and weight requirements.
  • Operated equipment and machinery according to safety guidelines.
  • Performed repetitive assembly tasks with hand and power tools and automated equipment.
  • Demonstrated strong problem-solving skills, resolving issues efficiently and effectively.
  • Approached customers and engaged in conversation through use of effective interpersonal and people skills.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.
  • Worked effectively in team environments to make the workplace more productive.
  • Conducted routine maintenance and repairs on mechanical systems and industrial equipment.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.
  • Worked with cross-functional teams to achieve goals.

Laborer

Wilkerson Construction
Hollywood , AL
06.2015 - 04.2018
  • Lubricated, cleaned or repaired machinery or equipment.
  • Prepared surfaces prior to painting by sanding, scraping, patching holes, and filling cracks with putty or plaster.
  • Followed all safety procedures when handling hazardous materials in the laboratory setting.
  • Poured concrete foundations for structures such as buildings or bridges according to blueprints provided.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Operated and maintained a variety of equipment including hand and power tools.
  • Learned and mastered skilled trade specialties under guidance of expert mentors.
  • Contributed innovative ideas and solutions to enhance team performance and outcomes.
  • Cleaned work area after job completion ensuring all debris is properly disposed of.
  • Assembled scaffolding around construction sites for use by laborers during high-rise building projects.
  • Operated pallet jacks and forklifts to load and unload supplies and materials.
  • Repaired damaged drywall sections including taping joints and applying texture coats as needed.
  • Tended pumps, compressors or generators to provide power or heat or move materials.
  • Sorted and placed materials or items on racks, shelves or in bins to keep warehouse organized.
  • Completed variety of physical labor tasks.
  • Positioned, aligned or sealed concrete wall sections or pipes.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Displayed high standards for quality workmanship and routinely double-checked work.

Education

High School Diploma -

North Jackson High
Stevenson, AL
05-1999

Skills

  • Drywalling
  • Residential construction
  • Commercial construction experience
  • Roofing
  • Painting
  • Landscaping
  • Plumbing
  • Ditch digging
  • Safe vehicle operation
  • Concrete grading
  • Tool retrieval
  • Scaffolding assembly and disassembly
  • Site condition assessment
  • Scaffolding setup
  • Basic electrical work
  • Team lifting
  • Endurance and stamina
  • Time management
  • Attention to detail
  • Proper lifting techniques
  • Construction
  • Physical strength
  • Flooring installation
  • Electrical
  • Chemical mixing
  • Drywall installation
  • Framing experience
  • Punctual and reliable
  • Material handling
  • Verbal and written communication
  • Scaffolding safety
  • Team collaboration
  • Trash collection
  • Job site organization
  • Complex Problem-solving
  • Hand and power tools
  • Light carpentry
  • Hand-eye coordination
  • Maintenance and repair
  • Material mixing
  • Caulking and sealing
  • Gravel spreading
  • Willingness to learn
  • Fence building
  • Rebar tying
  • Ceiling tile installation
  • Job site safety
  • Bricklaying techniques
  • Machinery maintenance
  • Vehicle unloading and loading
  • Plumbing basics
  • Tiling experience
  • Equipment operation
  • Demolition expertise
  • Concrete work
  • Hydraulics operation
  • Safety awareness
  • Lawn and grounds maintenance
  • Debris removal
  • Skid and hoist operations
  • Job site cleanup
  • Construction techniques

Timeline

Laborer

Timothy Hinkles Construction
02.2020 - Current

Laborer

Jenkins Masonry
04.2018 - 02.2020

Laborer

Wilkerson Construction
06.2015 - 04.2018

High School Diploma -

North Jackson High
Jessie Danley