Summary
Overview
Work History
Education
Skills
Certification
Languages
Computer Skills
Timeline
Generic

Jesus Meraz Gutierrez

Modesto,CA

Summary

Highly motivated and detail-orientated assistant superintendent with 8 years of experience in the commercial construction industry, specializing in tilt-up warehouse projects. Proven, track record in supporting successful projects from groundbreaking through completion, dealing directly with owners, tenants, contractors and governing agencies. Skilled in coordinating subcontractors, managing daily field operations with problem solving onsite issues and driving efficient workflows in fast paced environments.

Overview

8
8
years of professional experience
1
1
Certification

Work History

Superintendent

Switch Data Center
Reno , Nevada
06.2025 - Current
  • Supervised daily operations in large-scale data center to ensure efficiency and safety.
  • Implemented stringent safety protocols to safeguard staff and equipment integrity.
  • Monitored all owner-provided equipment for compliance and operational readiness.
  • Completed projects in multiple phases, adhering to timelines and budget constraints.

Superintendent

Boyce Road Trailer Yard
Fremont, CA
09.2024 - 06.2025
  • Developed 106 semi-truck and trailer parking stalls and 10 auto parking stalls equipped with four EV chargers.
  • Installed infrastructure to support future truck charging stations.
  • Constructed chain link and decorative fencing surrounding entire site.
  • Implemented four motor-operated driveway gates for enhanced security.
  • Integrated multiple bioswale retention systems for effective stormwater management.
  • Established onsite lighting to ensure safety and visibility.
  • Created offsite sidewalks to improve accessibility for pedestrians.
  • Managed project valued at $9.5 million, ensuring quality and compliance.

Assistant Superintendent

Catellus Distribution Center
Stockton, CA
06.2024 - 09.2024
  • Executed complete build-out of remote restrooms using CMU block, including mechanical, plumbing, and electrical systems.
  • Achieved full ADA compliance for restroom access.
  • Implemented fire alarm systems as part of safety protocols.
  • Participated in a project with an overall value of around $80 million, focusing on a $200,000 scope.

Superintendent

Amazon Tenant Improvement
Simi Valley, CA
04.2024 - 06.2024
  • Initiated project setup, establishing job trailer, storage containers, temporary fencing, and power supply using generators.
  • Executed 6,000 square-foot office build-out including ADA compliant restrooms, kitchen breakroom, office spaces, conference room, janitor's closet, and remote restrooms.
  • Conducted interior floor scrubber dump for effective waste management.
  • Performed saw cutting and demolition of dock pits to facilitate new electrical dock leveler installation.
  • Installed roof and concrete wall insulation to enhance energy efficiency.
  • Developed infrastructure for new HVAC system installation in warehouse.
  • Managed project valued between $10 million and $15 million over a two-month period.

Superintendent

Mcarthy Business Park Tilt-Ups
Gilroy, CA
06.2023 - 03.2024
  • Filled superintendent role five months into project, ensuring seamless transition.
  • Executed construction of typical tilt-up warehouses with storefronts and multiple dock doors.
  • Oversaw overhead fire sprinkler protection installation across all buildings.
  • Managed design and setup of interior electrical and fire alarm rooms.
  • Supervised exterior fire pump rooms constructed with durable concrete panels.
  • Directed development of trash enclosures featuring protective canopies.
  • Implemented efficient TPO roofing membrane system for weatherproofing.
  • Incorporated multiple bioswale retention basins to manage site runoff.

Superintendent

Zephyr Tenant Improvement
Stockton, CA
10.2022 - 12.2022
  • Executed interior improvements, including kitchen-equipped break room and ADA-compliant restrooms.
  • Constructed conference room and office spaces to enhance functionality.
  • Cut and demolished over 10 dock pits, installing new electrical dock leveler packages.

Assistant Superintendent

Overton Moor Properties Tilt-up
Stockton, CA
01.2022 - 10.2022
  • Led comprehensive coordination efforts among trades given restricted site access for project.
  • Oversaw construction of dual warehouses with storefronts promoting customer engagement.
  • Orchestrated installation of multiple mechanical dock doors for improved logistics efficiency.
  • Implemented overhead fire sprinkler system equipped with dedicated fire pump for maximum safety.
  • Developed one-hour rated rooms for fire pump, fire alarm, and electrical systems per regulations.
  • Achieved successful completion of $30 million project while maintaining high-quality standards.
  • Facilitated collaboration with surrounding businesses to ensure minimal disruption during construction.
  • Enhanced delivery management systems in response to complex site dynamics.

Assistant Superintendent

Prologis IPC10
Tracy, CA
01.2020 - 01.2021
  • Executed role of superintendent on $20 million tilt-up warehouse project ensuring quality control.
  • Coordinated construction of multiple storefronts situated at key areas of building.
  • Utilized steel fibers in slab mix design, eliminating need for rebar reinforcements.
  • Managed installation of more than 30 mechanical dock doors, complemented by large dock apron.
  • Designed and implemented overhead fire sprinkler system along with fire alarm system.
  • Constructed one-hour rated fire pump room and electrical room framed with metal studs and sheetrock.

General Laborer

Tilt up Warehouse
Tracy, CA
02.2018 - 01.2020
  • Maintained clean, organized jobsite to enhance safety and efficiency.
  • Installed safety railing around roof perimeter to prevent falls.
  • Assisted multiple trades with tasks to ensure timely project completion.
  • Conducted routine inspections and maintenance on stair tower scaffolding.
  • Orientated subcontractors new to project to align with standards.
  • Executed punch list items to finalize project deliverables.
  • Tracked equipment rentals and coordinated returns at project conclusion.

General Laborer

Amazon Distribution Center
Stockton, CA
09.2017 - 02.2018
  • Installed t-posts and snow fences around all bioswales and secured areas on site.
  • Maintained erosion control measures, ensuring clean construction entrances and debris-free installations.
  • Conducted general housekeeping inside and outside of building throughout project duration.
  • Ensured safe work environment for all subcontractors and personnel on site.
  • Pumped water from low areas during rainy season to prevent flooding issues.
  • Utilized gradall for efficient relocation, loading, and unloading of materials.

General Laborer

Amazon Fulfillment Center
Sacramento, CA
05.2017 - 09.2017
  • Contributed to completion of over one million square foot warehouse project as laborer.
  • Executed general housekeeping tasks while adhering to strict safety practices.
  • Utilized power tools and heavy equipment for tasks including installation of safety railings.
  • Operated forklifts to transport materials for subcontractors and clear debris efficiently.
  • Assisted with loading and unloading materials to maintain workflow continuity.
  • Coordinated temporary laborers for miscellaneous site tasks, ensuring efficient operations.
  • Collaborated with multiple subcontractors and Amazon vendors throughout project lifecycle.
  • Completed significant portions of punch list items, demonstrating strong self-performance capabilities.

Education

High School Diploma -

Turlock High School
Turlock, CA

Skills

  • Project management
  • Safety compliance
  • Scheduling and planning
  • Field operations oversight
  • Quality control
  • Subcontractor coordination
  • Building codes compliance
  • Construction scheduling
  • Equipment operator
  • Blueprint interpretation
  • Site inspection
  • Scheduling and overseeing all building, public works inspections

Certification

  • Osha 30
  • CPR/First Aid

Languages

Spanish
Native/ Bilingual

Computer Skills

  • P6 Primavera Software
  • Procore
  • Bluebeam

Timeline

Superintendent

Switch Data Center
06.2025 - Current

Superintendent

Boyce Road Trailer Yard
09.2024 - 06.2025

Assistant Superintendent

Catellus Distribution Center
06.2024 - 09.2024

Superintendent

Amazon Tenant Improvement
04.2024 - 06.2024

Superintendent

Mcarthy Business Park Tilt-Ups
06.2023 - 03.2024

Superintendent

Zephyr Tenant Improvement
10.2022 - 12.2022

Assistant Superintendent

Overton Moor Properties Tilt-up
01.2022 - 10.2022

Assistant Superintendent

Prologis IPC10
01.2020 - 01.2021

General Laborer

Tilt up Warehouse
02.2018 - 01.2020

General Laborer

Amazon Distribution Center
09.2017 - 02.2018

General Laborer

Amazon Fulfillment Center
05.2017 - 09.2017

High School Diploma -