Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Joe Salinas

Austin,TX

Summary

Skilled civil engineer with four years of experience in engineering aspects, such as plan set preparation, drawings and specifications to complete construction engineering tasks. Professional presence with the ability to work independently with little supervision. Motivated individual who is committed to delivering the highest quality service in fast paced and constantly changing environments.

Overview

4
4
years of professional experience
1
1
Certification

Work History

Roadway Design EIT

Seiler-Lankes Group
11.2020 - Current
  • Prepared plan sheets in accordance to TxDOT's PS&E manual.
  • Prepared plan sets for 30%, 60%, 90% and Final submittals.
  • Prepared plan set portfolios for various projects using Bluebeam.
  • Designed horizontal alignments, profiles, ditches, driveways, traffic control plans, signs and pavements markings complaint with latest standards using geopak and/or ORD.
  • Lead several small projects, such as chevrons installation, and sidewalk and pedestrian signal posts installation projects.
  • Created templates for corridor models.
  • Developed 3D corridor models for cross sections and earthwork.
  • Kept track of quantities using Microstation dgns and Excel spreadsheets.
  • Worked with Senior Engineers to identify adequate bid items for cost estimates.
  • Worked with Senior Engineers to prepare cost estimates.
  • Supervised and assigned work to new EITs and interns.
  • Trained new EITs and interns on how to use Microstation and Geopak.

Project Engineer

Roy Jorgensen Associates
07.2019 - 11.2020
  • Assisted in providing estimates for new contract bids.
  • Drafted drawings using AutoCAD for change orders, snow and ice season plans, and asset locations.
  • Closely monitored project highway maintenance operations for contract compliance, quality control initiatives and operational corrective actions.
  • Supervised fieldwork to ensure work was up to standard as well as measured productivity data for future bidding rates, and work cost analysis.
  • Coordinated with field supervisors, and crew leaders to develop a schedule and planned it accordingly to accomplish work within budget limits, and due dates.
  • Coordinated with Project Managers to analyze accomplishments/schedule progress, budget standing, and safety issues.
  • Provided engineering contract management support including invoice review, customer report preparation, revenue analysis, costs analysis, and roadway asset inventory reporting.
  • Kept informed on relevant technical DOT legislation impacting the organization’s contract obligations, asset maintenance industry and performance-based contracting

Education

Bachelor of Science - Civil Engineering

University of Texas At Austin
Austin, TX
05.2018

Skills

  • MS Office
  • Microstation
  • Geopak
  • Open Roads Designer
  • Estimating
  • Bidding
  • Bluebeam Studio

Certification

  • EIT Certified (Texas #66159)
  • ORD Certified Training (32 hours) via Mesa Integrated Solutions

Languages

Spanish
Native or Bilingual
Portuguese
Limited Working

Timeline

Roadway Design EIT

Seiler-Lankes Group
11.2020 - Current

Project Engineer

Roy Jorgensen Associates
07.2019 - 11.2020

Bachelor of Science - Civil Engineering

University of Texas At Austin
Joe Salinas