Summary
Overview
Work History
Education
Timeline
Skills
Generic

Joel Perez

Phoenix,AZ

Summary

Detailed Foreman skilled in planning, assigning and directing work tasks. Team-oriented professional with strong commitment to maintaining safe, clean job sites. Dedicated to quality and clear communication.

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.

Experienced in fast-paced environments and adaptable to last-minute changes. Thrives under pressure and consistently earns high marks for work quality and speed.

Experienced and dependable general worker with a proven track record of efficiently completing tasks in various settings. Skilled in manual labor, equipment operation, and maintaining a clean and organized workspace. Safety-conscious with a strong work ethic and the ability to adapt to different environments. Ready to contribute to a dynamic team and make a positive impact.

Adaptable professional with a quick-learning ability and a talent for adjusting to new environments. Skilled in rapidly acquiring new knowledge and applying it effectively. Driven by a passion for continuous learning and successfully navigating change.

Overview

24
24
years of professional experience

Work History

Shotcrete Foreman / nozzlemen/Concrete Finisher

Shasta Pools
Phoenix, Arizona
02.2022 - 08.2025
  • Supervised construction teams for residential pool installations and renovations.
  • Coordinated daily operations to ensure project timelines and safety standards were met.
  • Trained new crew members on equipment use and safety protocols.
  • Inspected tools, materials, and equipment to ensure quality standards were met.
  • Provided guidance, direction, and technical assistance to crew members.
  • Supervised activities of personnel assigned to various tasks during construction jobs.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Managed workers at various experience levels in construction and restoration projects.
  • Monitored job progress and ensured completion within budget constraints.
  • Tracked and reported units and labor hours prior to submission of timecards.
  • Kept production team moving forward for progress in daily site operations.
  • Reported project progress, site problems and labor status to supervisors.
  • Mixed concrete according to specifications for optimal consistency and strength.
  • Finished concrete surfaces with trowels and floats for smoothness and durability.
  • Ensured proper curing techniques to maintain quality of finished concrete.
  • Maintained equipment and tools in safe, working condition for daily tasks.
  • Leveled and smoothed freshly placed concrete with a straight edge or float.
  • Finished surfaces by hand-troweling or machine-troweling for a smooth finish.
  • Used numerous types of power tools and other equipment daily.
  • Poured concrete into forms using pump hose and leveled.
  • Positioned wire mesh and rebar to reinforce concrete.

Education

Ged
Phoenix, AZ

Timeline

Shotcrete Foreman / nozzlemen/Concrete Finisher

Shasta Pools
02.2022 - 08.2025

Ged

Skills

  • Concrete mixing
  • Surface finishing
  • Safety compliance
  • Equipment maintenance
  • Team leadership
  • Time management
  • Problem solving
  • Effective communication
  • Crew training
  • Attention to detail
  • Performance evaluation
  • Project deadlines
  • Teamwork and collaboration
  • Multitasking and organization
  • Timesheet review
  • Raw materials
  • Hand and power tools
  • Job site management
  • Physical stamina
  • OSHA compliance
  • Performance monitoring
  • Dimensions and measurements
  • Task delegation
  • Materials estimating
  • Tool maintenance
  • Project management
  • Work Planning and Prioritization
  • Dedicated work ethic
  • Schematics and blueprints
  • Daily reporting
  • Project leadership
  • Crew supervision
  • Equipment operation
  • Material ordering
  • Project reporting
  • Crew leadership
  • Decision-making
  • Commercial construction experience
  • Budget development
  • Residential construction
  • Heavy lifting
  • Commercial and residential projects
Joel Perez