Summary
Overview
Work History
Education
Certification
Timeline
Generic

Joel rhorer

Rockwall,TX

Summary

Experienced plasterer with a strong record of delivering smooth, high-quality finishes, precise surface preparation, and dependable work on residential and commercial job sites. Known for attention to detail, reliability, and completing deadlines without sacrificing quality.

Overview

1
1
Certification
28
28
years of professional experience

Work History

plasterer

Baker Triangle
mesquite , TX
06.2023 - Current
  • Applied plaster finishes across Baker Triangle job sites.
  • Mixed plaster materials for interior and exterior wall surfaces.
  • Prepared surfaces by cleaning, patching, and leveling substrates.
  • Installed lath, mesh, and corner bead for plaster applications.
  • Troweled smooth coats to match project specifications
  • Repaired cracks, holes, and damaged wall sections
  • Followed safety procedures and kept Baker Triangle work areas clean
  • Coordinated with foremen and trades to support project schedules
  • Mixed and applied plaster to walls, ceilings, and floors of buildings.
  • Cleaned up work areas after job completion.
  • Worked collaboratively with other tradespeople on construction sites.
  • Completed all jobs within specified deadlines without compromising quality standards.

owner

Rhorer Custom Plastering llc
Boonville, Missouri
01.2018 - 07.2022
  • Developed and implemented project schedules to ensure timely completion of all tasks.
  • Coordinated resources and timelines to optimize workflow and meet client deadlines.
  • Facilitated regular team meetings to enhance collaboration and address project challenges.
  • Established clear communication channels to ensure team alignment and project updates.
  • Cultivated strong client relationships through regular check-ins and feedback sessions.
  • Addressed client concerns promptly to ensure satisfaction and foster long-term partnerships.
  • Monitored project progress to uphold high standards of craftsmanship and quality.
  • Directed custom plastering projects for Rhorer Custom Plastering LLC residential and commercial clients.
  • Coordinated crew schedules, work assignments, and daily job site priorities.
  • Prepared project estimates and reviewed scope with customers.
  • Supervised surface preparation, plaster application, and finish quality.
  • Managed material ordering, deliveries, and supply inventory.
  • Enforced jobsite safety practices and equipment handling standards.
  • Communicated with contractors, suppliers, and homeowners throughout projects.
  • Resolved worksite issues and guided crews through changing project needs.
  • Managed daily operations of business, including hiring and training staff.
  • Ensured compliance with local, state, and federal regulations.
  • Oversaw budgeting and financial management.
  • Identified new opportunities for growth, expansion, and diversification.
  • Provided direction and guidance to employees.
  • Promoted business on social media platforms to maximize brand identity and generate revenue.
  • Developed strategic plans to increase profitability and efficiency.
  • Reviewed legal documents related to business operations.

Plasterer superintendant

Quality Drywall
Columbia, Missouri
04.2015 - 03.2018
  • Applied plaster coats on Quality Drywall interior walls and ceilings.
  • Mixed plaster materials to match Quality Drywall finish requirements.
  • Smoothed surfaces with trowels for Quality Drywall renovation projects.
  • Repaired cracks and holes in Quality Drywall wall systems.
  • Prepared surfaces for plaster adhesion on Quality Drywall job sites.
  • Matched texture and finish styles for Quality Drywall clients.
  • Protected surrounding areas during Quality Drywall plaster installations.
  • Coordinated with drywall crews to complete Quality Drywall finishing work.
  • Mixed and applied plaster to walls, ceilings, and floors of buildings.
  • Cleaned up work areas after job completion.
  • Prepared surfaces by cleaning, filling holes and cracks, sanding, taping joints and applying primers.
  • Repaired existing plasterwork in older buildings.
  • Mixed substances or compounds needed for each task.
  • Smoothed rough spots on wall surfaces using trowels and other hand tools.
  • Measured and cut plasterboard to fit into walls or ceilings.
  • Mixed mortar by operating mixing drills and tools.
  • Worked collaboratively with other tradespeople on construction sites.
  • Utilized scaffolding when necessary during repair projects.
  • Adhered strictly to health and safety regulations at all times while working on site.
  • Used a variety of hand tools such as knives, saws, chisels, floats.
  • Operated power and hand sanders to prepare surfaces for pasting.
  • Completed all jobs within specified deadlines without compromising quality standards.
  • Used hammers and masonry saws to construct, repair and demolish concrete walls and bases.
  • Applied undercoat material to interior walls prior to the application of decorative finishes.
  • Protected structures or surfaces near work areas to avoid damage or excess debris.
  • Selected the right type of plaster depending on the substrate being covered.
  • Installed metal frames for suspended ceilings.
  • Completed range of projects such as ornamental and flat plaster applications.
  • Inspected existing structures for damage before beginning repairs.
  • Assessed project plans with supervisors in order to determine materials needed and timeline expectations.
  • Communicated with clients to convey estimated time, materials, and labor for desired project.
  • Placed plastic sheeting over furniture and fixtures in order to protect them from dust particles created during work activities.
  • Illustrated strong knowledge base of industry best practices such as choosing most optimal tools and materials for each project.
  • Installed lath strips onto walls for added support for plasterwork.
  • Properly installed exterior insulation finishes through accurate reading of blueprints and schematics.
  • Prepared materials and work area according to design and specification documents.
  • Instructed apprentices in proper techniques used when applying plaster products.
  • Loaded and unloaded materials by lifting, pushing, and pulling heavy material loads.
  • Applied protective coatings such as paint or varnish to finished surfaces.
  • Trained team members in proper installation methods to meet project quality and efficiency standards.
  • Operated boom lifts and scissor lifts to apply products to walls.
  • Mentored new team members and cultivated a safe and team-oriented atmosphere.
  • Attended safety meetings regularly in order to stay abreast of safety regulations applicable to the job site environment.
  • Inspected and machines to verify conformance to product specifications.
  • Applied prefabricated insulation systems to building exteriors over existing walls, covering surfaces with insulation boards, reinforcing mesh and base coats.
  • Sprayed acoustic materials and textured finishes over walls and ceilings for aesthetic and technical purposes.
  • Coordinated drywall crews, subcontractors, and site activities for Quality Drywall projects.
  • Reviewed blueprints and specifications to direct framing and hanging work.
  • Scheduled deliveries, labor, and material flow across active job sites.
  • Monitored safety practices and enforced jobsite compliance standards.
  • Inspected installation quality and confirmed punch list corrections.
  • Communicated daily progress with clients, foremen, and project managers.

journeyman plasterer

Operative Plasterers' & Cement Masons' Local 518
Independence, Missouri
03.2002 - 06.2009
  • Applied multiple plaster techniques to ensure durability and visual appeal of installations.
  • Executed high-quality plaster finishes on various surfaces to achieve desired aesthetics.
  • Mixed and applied plaster to walls, ceilings, and floors of buildings.
  • Utilized diverse plastering materials to meet project specifications and client expectations.
  • Prepared walls, ceilings, and surfaces for plaster application.
  • Mixed and prepared plaster compounds to achieve optimal consistency and performance.
  • Applied plaster coats on union job sites for Local 518 projects.
  • Soothed, patched, and finished surfaces for clean final appearance.
  • Repaired cracks and damaged plaster on commercial and residential sites.
  • Repaired existing plasterwork in older buildings.
  • Mixed cement, gypsum, and finish materials to job specifications.
  • Measured and cut plasterboard to fit into walls or ceilings.
  • Smoothed, patched, and finished surfaces for clean final appearance.
  • Utilized scaffolding when necessary during repair projects.
  • Cleaned tools, work areas, and materials after each shift.
  • Cleaned up work areas after job completion.
  • Participated in team meetings to discuss project goals and address any challenges.
  • Coordinated with team members to streamline workflow and enhance project efficiency.
  • Collaborated with Local 518 crews to coordinate daily plastering tasks.
  • Conducted regular safety inspections to identify and mitigate potential hazards.
  • Implemented safety protocols to maintain a secure and compliant job site environment.
  • Adhered strictly to health and safety regulations at all times while working onsite.
  • Used a variety of hand tools such as knives, saws, chisels, floats.
  • Mixed substances or compounds needed for each task.
  • Mixed mortar by operating mixing drills and tools.
  • Adhered strictly to health and safety regulations at all times while working on site.
  • Used hammers and masonry saws to construct, repair and demolish concrete walls and bases.
  • Operated power and hand sanders to prepare surfaces for pasting.
  • Applied undercoat material to interior walls prior to the application of decorative finishes.
  • Protected structures or surfaces near work areas to avoid damage or excess debris.
  • Installed metal frames for suspended ceilings.
  • Selected the right type of plaster depending on the substrate being covered.
  • Completed range of projects such as ornamental and flat plaster applications.
  • Inspected existing structures for damage before beginning repairs.
  • Completed range of projects such as ornamental and flat plaster applications.
  • Inspected existing structures for damage before beginning repairs.

Midwest Plastering llc

owner
Prairie Home, Missouri
09.1998 - 03.2003
  • Executed day-to-day duties with accuracy and efficiency, ensuring smooth operations.
  • Proposed innovative ideas and solutions that improved team collaboration and project results.
  • Collaborated with cross-functional teams to align on project objectives. to achieve goals.

Education

High School Diploma -

Kemper Military School And College
Boonville, MO
06-1995

Certification

  • commercial drivers license class A
  • OSHA 40
  • EIFS application certified

Timeline

plasterer

Baker Triangle
06.2023 - Current

owner

Rhorer Custom Plastering llc
01.2018 - 07.2022

Plasterer superintendant

Quality Drywall
04.2015 - 03.2018

journeyman plasterer

Operative Plasterers' & Cement Masons' Local 518
03.2002 - 06.2009

Midwest Plastering llc

owner
09.1998 - 03.2003

High School Diploma -

Kemper Military School And College
Joel rhorer