Summary
Overview
Work History
Education
Skills
Timeline
Manager

John Anderson

Cumberland,WI - Wisconsin

Summary

Production worker where my knowledge of SRW and Inventory control can be utilized to increase production and help me gain experience.

Overview

23
23
years of professional experience

Work History

Super Abrasive Making

3M
Cumberland, WI - Wisconsin
09.2021 - Current

-Plating carrier for use in creating other materials.

- Maintain tanks

-Repair jigs and change thieves

-TTO certified


Super Abrasive Converting

3M
Cumberland, WI - Wisconsin
09.2020 - 09.2021

-Packing of belts, discs, mineral and roloc

SRW

3M
Cumberland, WI - Wisconsin
10.2017 - 09.2020

Warehouse order picking

staging of loads in proper location

loading and unloading of semi trailers

staging of loads on dock

receiving loads

moving trailers in and out

licensed on Raymond lift, pallet truck, CRC lift, forklift, and lift in warehouse

Woodworker

Shell Lake Woodcrafters
Shell Lake, WI
12.2011 - 10.2017
  • Performed year end inventory counts in multiple areas
  • Maintained inventory levels of materials
  • Completed general finish work and sanding.
  • Measured and cut materials in adherence to schematic drawings.
  • Demonstrated in-depth knowledge of sanders, saws and routers.
  • Constructed custom built designs according to specifications.
  • Chose appropriate lumber and supplies for projects based on wood species, project type, client needs and budgets.
  • Read and interpreted blueprints and construction documents to determine project directives.
  • Inspected and maintained equipment to repair and keep in peak condition.
  • Compared and matched color, grain and texture to select wood, veneer and laminate materials.
  • Counted materials inventory daily to identify low stock and plan orders.
  • Constructed standard and custom items from wood.
  • Oversaw and monitored team to coach new employees and instruct staff on job requirements and safety procedures.

Carpenter

Dependable Carpenters
Cumberland, WI - Wisconsin
12.2006 - 12.2011
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Organized project work by reading blueprints and assessing job specifications to determine optimal plans.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Completed precise joining and high-quality finish work by properly anchoring and bracing structures.
  • Installed paneling on walls to deaden sound, complete decorations or absorb shock based on individual customer requirements.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Installed drywall, ceilings, trim and fabricated replacement trim and moldings.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Calculated dimensions and amount of needed materials by accurately measuring job site and structures.

General Laborer

Derrick Construction
New Richmond, WI
05.2005 - 12.2006
  • Loaded, unloaded and moved material to and from storage and production areas.
  • Assisted team members with tasks that require group effort.
  • load and unload materials
  • inventory control of cabinet materials
  • maintain wood trim counts

Heat Treat Operator

American Tool
Cumberland, WI - Wisconsin
07.1997 - 06.2003
  • Checked and adjusted controls to achieve necessary temperatures and heating times.
  • Inspected and sampled completed products to evaluate production quality.
  • maintained inventory levels for other machines
  • Performed monthly inventory counts

Education

Wood Techniques Certificate - Contruction

WITC Rice Lake
Rice Lake, WI
05.2005

Skills

  • Strong Problem Solver
  • Cross-Functional Team Collaboration
  • Time Management
  • Results and Deadline-Driven
  • Log Files
  • Inventory Control
  • Keeping Records

Timeline

Super Abrasive Making

3M
09.2021 - Current

Super Abrasive Converting

3M
09.2020 - 09.2021

SRW

3M
10.2017 - 09.2020

Woodworker

Shell Lake Woodcrafters
12.2011 - 10.2017

Carpenter

Dependable Carpenters
12.2006 - 12.2011

General Laborer

Derrick Construction
05.2005 - 12.2006

Heat Treat Operator

American Tool
07.1997 - 06.2003

Wood Techniques Certificate - Contruction

WITC Rice Lake
John Anderson