Summary
Overview
Work History
Education
Skills
Languages
Timeline
Solar Panel Installer, Lead

John Cespedes

Cward Electric
Bristol,CT
2027
years of professional experience
2
Languages

Safety-focused solar professional with experience leading crews, coordinating daily installs, and keeping job sites organized. Strong problem-solving, decision-making, and attention to detail support accurate panel placement, system readiness, and quality results in challenging conditions.

Work History

Solar Panel Installer, Lead

8 Years 2 Months
Cward Electric | Coventry, CT | 09.2018 - 11.2026
  • Installed solar panels on residential and commercial roofs for Cward Electric projects.
  • Supported daily installation of 20-40 solar panels on active job sites.
  • Assembled racking systems and secured panel arrays with hand and power tools.
  • Connected panels, inverters, and junction boxes to electrical systems.
  • Inspected roof layouts and measured placement for safe panel installation.
  • Tested wiring connections and checked system readiness before startup.
  • Followed OSHA safety rules and fall protection procedures on active job sites.
  • Installed solar panels safely in extreme hot and cold weather, in confined crawl spaces, and on roofs of multi-storey buildings.
  • Loaded materials, organised equipment, and maintained clean work areas.

Solar Panel Installer

8 Months
EcoSmart CT | Berlin, Connecticut | 01.2018 - 09.2018
  • Sealed roof penetrations and secured weatherproof mounting points.
  • Inspected roof layouts and planned safe installation work.
  • Coordinated with electricians and crew members during solar installs.
  • Monitored weather conditions during installation processes to identify potential risks.
  • Inspected work sites prior to installation to ensure all necessary materials were present.
  • Completed training sessions to stay current on safety procedures and product knowledge.

Solar Panel Installer

Trinity Solar | Cheshire, Connecticut | 2015 - 2017
  • Laid out and installed mounting hardware, including brackets, bolts, and screws.
  • Tested connections between components for proper functionality after installation.
  • Troubleshot problems with existing PV systems to determine repair needs.
  • Followed safety protocols while working at heights or around electricity sources.
  • Inspected work sites prior to installation to confirm necessary materials were present.
  • Organized tools and supplies for each job site before arrival.
  • Met customer expectations throughout entire process while supporting installation work.

Education

High School Diploma

Bristol Eastern High School | Bristol, CT | 06-2007

Some College (No Degree)

Tunxis Community College | Farmington, CT

Skills

Crew leadership
Effective communication
Problem solving
Attention to detail
Problem-solving aptitude
Decision-making
Goal setting
Organizational skills

Languages

Spanish
Full Professional
English
Full Professional

Timeline

Solar Panel Installer, Lead

Cward Electric
09.2018 - 11.2026Read More

Solar Panel Installer

EcoSmart CT
01.2018 - 09.2018Read More

Solar Panel Installer

Trinity Solar
2015 - 2017Read More

Bristol Eastern High School

High School Diploma
Read More

Tunxis Community College

Some College (No Degree)
Read More
John Cespedes